| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.6 LAccepted-AOC 213 SRI KRISHNA NAGAR BRAHMRSI CHOWK AURANGABAD SRI KRISHNA NAGAR AURANGABAD BIHAR 824101 | AURANGABAD | BIHAR | 824101 | 1 | Accepted-AOC Accepted as L1 bidder and awarded amount is including GST. | |
| 2 | Rejected-Technical | - | Rejected-Technical Rejected as L4 bidder. | |
| 3 | Rejected-Technical | - | Rejected-Technical Rejected as L2 bidder. | |
| 4 | Rejected-Technical CAMP Q NO H 54 WARD NO 17 HALLOW BLOCK KOTMA COLLIERY DIST ANUPPUR MP | KOTMA | ANUPPUR | MADHYA PRADESH | - | Rejected-Technical Rejected as L3 bidder. |
Tender Value
₹12.9 L
EMD Value
₹16,200
Closing Date
3 Feb 2023, 5:00 pmClosed
General Manager (Oprn)
Office of General Manager, JK Area, Kotma, Anuppur
Extension of C-2 conveyor belt and Installation of C-3 conveyor belt in M. K. Seam at Bhadra 7/8 Mine, Bhadra Sub Area.
2023_SECL_268088_1
SECL/JK/GM(O)/22-23/eT/50 dtd. 19.01.2023
Open Tender
Miscellaneous Works
Item Rate
120 days
Bhadra 7/8 Mine, Bhadra Sub Area, JK Area
AS PER NIT
3 documents required · 3 mandatory
₹16,200
18 Apr 2023
19 Jan 2023
4 Feb 2023
19 Jan 2023
3 Feb 2023
20 Jan 2023
20 Jan 2023 - 23 Jan 2023
Amount
Extension of C2 conveyor belt (1000 MM) from 3Xcut/2R MK Seam to 1LW/5Xcut, MK Seam -50 Mtr. Loading ,Transportation and Unloading Materials
Loading,Transportation,Unloading and grouting of Tail end drum with frame from 3Xcut/2R MK Seam to 01LW/5Xcut, MK Seam
Loading,Transportation,Unloading and positioning of Belt structure of 50 Mtr from surface to 01 LW/5Xcut, MK Seam
Loading,Transportation,Unloading and laying of 1000 MM belt length 100 Mtr from surface to 01 LW /5Xcut, MK Seam
Laying of Belt structure
Laying down of belt structure of 50Mtr from 3Xcut/2R MK Seam to 01 LW/5Xcut, MK Seam (04 Manshift per 40 Mtr)
Installation of conveyor drums with posts. Installation of tail end frame
Excavation work in hard stone
PCC work in U/G including centering and shuttering
Cost of cement (6.40 bag=0.224 CuM) 1.44 g/CM3
Cost of stone aggregate (Singe size ): 20 MM nominal size
Cost of sand
Loading of all kinds of building material into mine tub at incline mouth
Unloading at Destination in UG
Transportation of material by manual labour with lead range from 61-75 Mtr
Pushing of tubs for every 30 Mtr
Transportation of material with tramming & pushing, Coupling & Uncoupling with haulage for distance of every 500 Mtr or part there of and bringing the empty tubs to surface (1000 Mtr/500Mtr=2)
Malma cleaning removal of debris from galleries sump and stacking within 50 Mtr lead. (50X4.2X0.15)
Installation of C-3 Belt in MK Seam from 01LW/5Xcut MK Seam to 1LW/21Xcut, MK Seam -620 Mtr. Loading,Transportation and Unloading of Materials
Loading,Transportation,Unloading and Grouting Discharge drum with snub drum set with frame and posts from -1L/2R, L.K.II Seam to 01 LW/5Xcut, MK Seam.
Loading,Transportation,Unloading and Grouting of loop take up drum set with frame and posts -1L/2R, LKII Seam to 1LW/5Xcut, MK Seam.
Loading,Transportation,Unloading and Grouting of Drive drum set with gearbox from -1L/2R,LKII Seam to 01LW/5Xcut, MK Seam
Loading,Transportation,Unloading of Electricals switch, Cable,Starter and motor from -1L/2R, L.K.II Seam to 01LW/5Xcut, MK Seam
Loading,Transportation,Unloading and Grouting of Tail end drum with frame from -1L/2R, L.K.II Seam to 01LW/5Xcut, MK Seam
Loading,Transportation,Unloading and Positioning of Belt structure of 620 Mtr from different location in LKII Seam to 01LW/5Xcut, MK Seam
Loading,Transportation,Unloading and Laying of 1000MM Belt Length of 1200 Mtr from surface to 01LW/5Xcut, MK Seam
Laying down of belt structure
Laying down of Belt Structure of 620 Mtr from 01LW/5Xcut MK Seam to 01LW/21Xcut MK Seam (04 Manshift per 40 Mtr)
Installation of conveyor drums with posts. Installation of tail end frame
Excavation work in hard stone
PCC work in U/G including centering and shuttering
Cost of cement (6.40 bag=0.224 CuM) 1.44 g/CM3
Cost of stone aggregate (Singe size ): 20 MM nominal size
Cost of sand
Loading of all kinds of building material into mine tub at incline mouth
Unloading of all kinds of building material at Destination in UG
Transportation of material by manual labour with lead range from 61-75 Mtr
Pushing of tubs for every 30 Mtr. After free pushing of first 30.0 Mtr
Transportation of material with tramming & pushing, Coupling & Uncoupling with haulage for distance of every 500 Mtr or part there of and bringing the empty tubs to surface (1000 Mtr/500Mtr=2)
Malma cleaning removal of debris from galleries sump and stacking within 50 Mtr lead. (620X4.2X0.15)
Total impact of GST for the purpose of CTC
MAHENDRA SINGH
Ram Awadh Singh
BIKESH KUMAR SINGH
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .