| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-AOC | ₹2.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.5 Cr+₹9.6 L (3.95%)Rejected-AOC 0 272 273 1 | ₹2.5 Cr+₹9.6 L (3.95%) | L2 | Rejected-AOC L2 |
| 3 | L3₹2.5 Cr+₹9.9 L (4.10%)Rejected-AOC | ₹2.5 Cr+₹9.9 L (4.10%) | L3 | Rejected-AOC L3 |
Tender Value
₹2.5 Cr
EMD Value
₹5 L
Closing Date
2 Oct 2018, 5:00 pmClosed
Office of the SE ICC, BAJARIYA MAHOBA
Office of the SE ICC, BAJARIYA MAHOBA
Construction of VRB cum canal x-ing at Ch. Km. 37.020 of Arjun feeder canal. (Lot-02)
2018_UPIDC_253631_2
03/SE/2018-19
Open Tender
Civil Works
Item Rate
270 days
MAHOBA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
EE MDCDI
₹5 L
Yes
27 Mar 2021
24 Sept 2018
3 Oct 2018
24 Sept 2018
2 Oct 2018
24 Sept 2018
Amount
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work.
Earth work in filling in making embankment and cutting canal cross section after mechanical compaction including dressing and watering with all leads, lifts and T&P etc. for proper completion of job. As per direction of Engineer-in-charge, including all taxes like income tax, labour cess etc but excluding GST.
Excavation in making canal section in all type of strata excluding hard rock including compaction, dressing, watering and disposal of excavated material As per direction of Engineer-in-charge. Including all leads, lifts and T&P etc. for proper completion of job, including all taxes like income tax, labour cess etc but excluding GST.
Excavation of foundation in hard granite rock including disposal with all leads and lifts T&P etc. for proper completion of job. As per direction of Engineer-in-charge, including all taxes like income tax, labour cess etc but excluding GST.
Excavation of foundation in all type of strata excluding hard rock including disposal with all leads, lifts and T&P etc. for proper completion of job. As per direction of Engineer-in-charge, including all taxes like income tax, labour cess etc but excluding GST.
Laying A40 M10 cement concrete by mechanical vibration asuming cement consumption of 6.10 bags per cum including cost of material, labor and T&P all leads, lifts for proper completion of job. As per direction of Engineer-in-charge, including all taxes like income tax, labour cess etc but excluding GST.
Providing and fixing centering and shuttering for R.C.C. work including cost of material, labor T&P all leads and lifts for proper completion of job. As per direction of Engineer-in-charge, including all taxes like income tax, labour cess etc but excluding GST.
Laying RCC A20 M25 by mechanical mixing and mechanical vibration cement consumption of 7.70 bags per cum including cost of all material, labor T&P all leads, lifts for proper completion of job, including all taxes like income tax, labour cess etc but excluding GST.
Laying RCC A20 M30 by mechanical mixing and mechanical vibration cement consumption of 7.90 bags per cum including cost of all material, labor T&P all leads, lifts for proper completion of job, including all taxes like income tax, labour cess etc but excluding GST.
Providing and laying steel for reinforcement including cost of steel, cutting, bending, placing in position, binding with G.I. wire & welding etc. including cost of material, labour T&P and all lead and lifts for proper complection of job, including all taxes like income tax, labour cess etc but excluding GST.
Laying A40 M15 cement concrete by machanical mixing and machanical vibrating asuming cement cosumpation of 6.10 bags per cum including cost of material, labor T&P etc. all lead and lifts for proper complection of job, including all taxes like income tax, labour cess etc but excluding GST.
Laying C.C. A10 M30 by machanical mixing and machanical by vibration cement consumption 11.10 bags in including cost of material labour and T&P etc. all leads and lifts complete including all taxes like income tax, labour cess etc but excluding GST.
Laying A40 M20 remceforce cement concrete by mechanical mixing and mechanical vibration cement consumtion of 7.90 bags per cum including cost of all material but excluding cost of steel, labour T&P and lead and lifts for proper completion of job, including all taxes like income tax, labour cess etc but excluding GST.
Providing and laying Boulder pitching in canal bed including cost of material, labor and T&P etc. for proper completion of work. including all taxes like income tax, labour cess etc but excluding GST.
Fixing Elestomatic bearing on pedstal excluding cost of material, as per direction of Engineer-in-charge, including all taxes like income tax, labour cess etc but excluding GST.
Supply and fixing joint filler board 20 mm thick including cost of material, labor and T & P etc. with all leads and lifts for proper completion of job as per direction of Engineer-in-charge, including all taxes like income tax, labour cess etc but excluding GST.
Dewatering of foundatin including all cost of material, labor and T&P etc. for proper completion of job, including all taxes like income tax, labour cess etc but excluding GST.
TRISHIRA CONSTRUCTION PVT LTD
JC Company
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .