Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹92.8 LAdmitted-Finance 30 INDUSTRIAL AREA KOKAR RANCHI 834004 JHARKHAND | RANCHI | JHARKHAND | 834004 | -3.68% | ₹92.8 L | L1 | Admitted-Finance |
| 2 | L2₹95.3 L+₹2.6 L (2.78%)Admitted-Finance NEW PUNJABI COLONY BEHIND OF UNION ANDHRA BANK KICHHA DISTT U S NAGAR UTTARAKHAND | UDAM SINGH NAGAR | UTTARAKHAND | 244712 | -1.00% | ₹95.3 L+₹2.6 L (2.78%) | L2 | Admitted-Finance |
| 3 | L3₹95.3 L+₹2.6 L (2.79%)Admitted-Finance BIND MOHALLA PO THANA DISTRICT CHATRA | CHATRA | JHARKHAND | 825103 | -0.99% | ₹95.3 L+₹2.6 L (2.79%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical GRAM MOKATMA PO MOKATMA THANA CHATRA DISTRICT CHATRA 825401 | CHATRA | JHARKHAND | 825401 | - | - | - | Rejected-Technical NR |
| 5 | Rejected-Technical NOT SPECIFIED | - | - | - | Rejected-Technical NR |
Tender Value
₹96.3 L
EMD Value
₹1.9 L
Closing Date
2 Jun 2026, 5:00 pmClosed
E.E., R.D.SPL.DIVISION, CHATRA.
E.E., R.D.SPL.DIVISION, CHATRA.
RDD/SD/CHATRA/12/2026-27/Gr_3 Construction of PCC Road From H/O Birju Bhuiyan to Dumbi School Via Yadav Tola in Village of Dumbi in Village-Dumbi, Panchayat-Brahamna, Block-Chatra.
2026_RDSPL_114395_1
RDD/SD/CHATRA/12/2026-27/Gr_3
Open Tender
Civil Works
Percentage
180 days
CHATRA
PLEASE REFER TENDER DOCUMENT
2 documents required · 2 mandatory
₹10,000
₹1.9 L
14 Aug 2026
26 May 2026
4 Jun 2026
26 May 2026
2 Jun 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | ROAD- Clearing Grass and Removal of Rubbish Road Land. up to a lead of 50 metres outside the periphery of the area. By Manual Means) S.O.R. PART - A Item No. 2.02 | 0.42 | Hac. | 19,760.3 | ₹8,299.33 |
| 2 | Compacting original ground supporting subgrade (Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of Table 300-2 for sub-grade construction.)
SOR Item No. 3.20 Case-1 | 634.95 | CUM | 52.6 | ₹33,398.37 |
| 3 | Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.
S.O.R. Item No. 3.18 | 142.8 | cum | 131.3 | ₹18,749.64 |
| 4 | Granular Sub-base with Close Graded Material (Table:- 400-1) By Mix in Place Method (Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401)
(i) for grading- II Material
S.O.R. Item No. R.W.D 4.01 B (II) | 522.45 | M3 | 1,437.6 | ₹7,51,074.12 |
| 5 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, Plain Cement Concrete Pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
S.O.R. Item No. 6.02 | 765 | CUM | 5,360.4 | ₹41,00,706 |
| 6 | CULVERT-CD=Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) (I) Ordinary Soil (Depth up to 3 m) S.O.R. Item No. 3.13 I B (I) | 113.76 | CUM | 55.8 | ₹6,347.81 |
| 7 | Providing and laying of dry Rubble Flooring complete as per drawing and Technical specifications.
S.O.R. Item No. 16.09 | 13.66 | CUM | 1,544.4 | ₹21,096.5 |
| 8 | Plain/Reinforced cement concrete in open foundation complete as per drawing and Technical Specifications
(P.C.C. Grade M-15)
S.O.R. Item No. 12.08 (A) Case II | 17.78 | CUM | 3,754.4 | ₹66,753.23 |
| 9 | Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification
Random Rubble Masonry in C.M. (1:3) in foundation
S.O.R. Item No. 12.07 (B) | 55.3 | CUM | 3,458.6 | ₹1,91,260.58 |
| 10 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
Random Rubble Masonry in C.M. (1:3) in substructure
S.O.R. Item No. 13.04 (A) | 22.58 | CUM | 3,468.8 | ₹78,325.5 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_154560.xls
BOQ • 0.28 MB
sbd3.pdf
Tender Documents • 0.89 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .