Loading…
Loading…
Tender Value
₹14.9 L
EMD Value
₹1.3 L
Closing Date
3 Jul 2026, 3:00 pm5d left
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer
Nagar Nigam Firozabad
Construction of RCC drain for drainage from the culvert of Ramgarh to Dhandhu Control Shop in Ward No. 62.
2026_DOLBU_1148317_339
05/PWD_15vitt_Rajvitt/2026-27
Open Tender
Civil Works
Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,489
Municipal Corporation
₹1.3 L
24 Jun 2026
24 Jun 2026
3 Jul 2026
24 Jun 2026
3 Jul 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil or silt (loam, clay or sand) including lift upto 1.50m and lead up to 30m and including filling watering and ramming of excavated earth in to the trenches or in to the space between the building and the side of foundation trenches or in to the plinth and removal and disposal of surplus earth as directed by the Engineer in charge up to a distance of 30m from the foundation trenches. (PWD SOR 2025-26, Chepter-4, Item No.01 Spec- 251 ) | 247 | Cum | 187.5 | ₹46,312.5 |
| 2 | Disposal of malba from site with cartage up to 8km distance including loading & unloading, T&P etc. required for proper of work as direction by Engineer-In-Charge. (PWD SOR 2017-18, Chepter-3, Item No. 231a ) | 172.9 | Cum | 230.1 | ₹39,784.29 |
| 3 | providing and laying cement concrete in 1:4:8 (1 cement: 4coarse sand :8 graded stone aggregate 40mm norminal size) including supply of all materials, labour and T&P etc. (PWD SOR 2025-26, Chepter-5, Item No.03 Spec- 4.1 ) | 31.35 | Cum | 5,650 | ₹1,77,127.5 |
| 4 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2025-26, Chepter-5, Item No.9 Spec. no. 5.1). | 20.52 | Cum | 8,100 | ₹1,66,212 |
| 5 | R.C.C work in Wall (any thickness) including attached plasters, buttresses, plinth and string courses, fillers, columns, pillars, abutments, post and struts etc. including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) upto plinth level (PWD SOR 2025-26, Chepter-5, Item No.9 Spec. no. 5.2) | 42.75 | Cum | 8,300 | ₹3,54,825 |
| 6 | RCC work Providing and laying in position specified grade of reinforced cement concrete, Slab including the cost of centering, shuttering, finishing and excluding reinforcement - Above plinth level upto fifth floor level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWDSOR 2025-26 Chapter No-05 Item No.10 Spec. No. 5.1). | 2.36 | Cum | 8,600 | ₹20,296 |
| 7 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the suply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. (As per Analysis of Rate) | 56.67 | Qtl | 7,800 | ₹4,42,026 |
| 8 | M.S Speciefication Board including painting & writing | 1 | Job | 4,635 | ₹4,635 |
| 9 | P/F of Inogration Granite stone including writing and | 1 | Job | 10,980 | ₹10,980 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.04 MB
TD.pdf
Tender Documents • 6.85 MB
BOQ_2181135.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid