Loading…
Loading…
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
9 Sept 2026, 6:00 pm
GE (AF) SUBROTO PARK
GE (AF) Subroto Park, Delhi Cantt Delhi-110010
As described in Bill of quantities
2026_MES_785556_1
GE/SP/TOKEN-39/2026-27
Open Tender
Civil Works
Item Rate
180 days
GE (AF) SUBROTO PARK
As per NIT and tender documents
9 documents required · 9 mandatory
₹500
GE (AF) SUBROTO PARK
₹80,000
Yes
20 Aug 2026
20 Aug 2026
12 Sept 2026
20 Aug 2026
9 Sept 2026
4 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches n.exc 1.5m wide and n.exc1.5 m in depth for foundation, or shafts, wells, cess pits manholes, pier holes etc n.exc 10 Sqm on plan and n.exc 1.5 m in depth and getting out in any type of soil / rock (soft / hard / dense soil /rock) complete all as specified and directed. | 164 | Cum | - | - |
| 2 | Excavation in trenches n.exc 1.5m wide and n.exc1.5 m in depth for foundation, or shafts, wells, cess pits manholes, pier holes etc n.exc 10 Sqm on plan and exc 1.5 m in depth and n exc 3.0 m depth and getting out in any type of soil / rock (soft / hard / dense soil /rock) complete all as specified and directed. | 42 | Cum | - | - |
| 3 | M & L for Returning & filling in including spreading, levelling, watering & well ramming in layers n.exc 25mm thick in soft/ hard / dense soil complete all as specified and directed. | 119.82 | Cum | - | - |
| 4 | Removing surplus excavated material out side MOD land minimum 10 KM distance complete all as specified and directed. | 86.18 | Cum | - | - |
| 5 | M&L for PCC 1:4:8 type D-2 using (using 40 mm graded stone aggregate) as in foundation filling and mass concrete base commplete all as speified and directed. | 24.99 | Cum | - | - |
| 6 | Demolition & breaking up drain pipes (salt glazed stone ware, AC or reinforced concrete) set in cement mortar, internal dia / bore of pipe 100 mm including removing debries out site MOD land complete all as specified and directed by Engr-in-Charge. NOTE:- Excavation / earth work shall be measured and paid seperately under respective items of BOQ. | 40 | RM | - | - |
| 7 | Demolition & breaking up drain pipes (salt glazed stone ware, AC or reinforced concrete) set in cement mortar, internal dia / bore of pipe 150 mm including removing debries out site MOD land complete all as specified and directed by Engr-in-Charge. NOTE:- Excavation / earth work shall be measured and paid seperately under respective items of BOQ. | 125 | RM | - | - |
| 8 | Demolition & breaking up drain pipes (salt glazed stone ware, AC or reinforced concrete) set in cement mortar, internal dia / bore of pipe 200 mm including removing debries out site MOD land complete all as specified and directed by Engr-in-Charge. NOTE:- Excavation / earth work shall be measured and paid seperately under respective items of BOQ. | 185 | RM | - | - |
| 9 | Demolition & breaking up drain pipes (salt glazed stone ware, AC or reinforced concrete) set in cement mortar, internal dia / bore of pipe 300 mm including removing debries out site MOD land complete all as specified and directed by Engr-in-Charge. NOTE:- Excavation / earth work shall be measured and paid seperately under respective items of BOQ. | 35 | RM | - | - |
| 10 | S&F 100 mm bore (inner dia) double wall corrugated HDPE pipes (SN8) in any length including all fittings and jointing with elastomeric rubber rings and couplers / other jointing materials as per manufacturers instructins, complete all as specified and directed. | 40 | RM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_880263.xls
BOQ • 1.34 MB
Tender39.pdf
Tender Documents • 1.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].