Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.4 LAccepted-AOC PANDAVESWAR BARDHAMAN WEST BENGAL INDIA 713346 | PANDAVESWAR | BARDHAMAN | WEST BENGAL | 713346 | 1 | Accepted-AOC Eligible L-1 bidder | |
| 2 | 2₹2.5 L+₹15,862.57 (6.68%)Rejected-Finance GOPALMATH DURGAPUR DIST PASCHIM BARDHAMAN PIN 713217 W B | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713217 | 2 | Rejected-Finance Quoted more than L-1 bidder | |
| 3 | 3₹2.6 L+₹21,454.04 (9.03%)Rejected-Finance RADHANAGAR VILLAGE PO SUNDERCHAK DIST PASCHIM BURDWAN PIN 713360 | PASCHIM BARDHAMAN | WEST BENGAL | 713360 | 3 | Rejected-Finance Quoted more than L-1 bidder |
Tender Value
₹2.2 L
EMD Value
₹2,800
Closing Date
13 Mar 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AE EnM
ECL Sonepur Bazari Area
Repair and maintenance of Sonepur feeder (11 KV) providing power to Sonepur Rehab under Sonepur Bazari Project
2023_ECL_272158_1
GM/SBA/EnM/e-tender/2022-23/ 756
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
ECL Sonepur Bazari Area
Please refer tender documents
6 documents required · 6 mandatory
₹2,800
8 Apr 2023
24 Feb 2023
15 Mar 2023
25 Feb 2023
13 Mar 2023
25 Feb 2023
25 Feb 2023 - 28 Feb 2023
Amount
Item Description/ Heading
Material Cost
Material cost for replacement of 11/12/13/16 mtrs long steel tubular pole with cement concrete (distorted one to be replaced by new one)
Material cost for supply, fabrication, hoisting, erection of phase and earth bracket and painting with red oxide primer
Meterial cost for supply and erection of nuts, bolts, flats and erection of clamps
Meterial cost for supply & installation of 11 KV disc insulator and hardware
Meterial cost for supply & installation of 11 KV pin insulator and hardware
Material cost for supply, fixing and erection of HT stay set complete with stay plate, stay insulator, and stay wire for required dimensions and specification
Labour Cost:-
Labour cost for replacement of 11/12/13/16 mtrs long steel tubular pole with cement concrete (distorted one to be replaced by new one)
Labour cost for fabrication, hoisting, erection of phase and earth bracket and painting with red oxide primer
labour cost for erection of nuts, bolts, flats and erection of clamps
labour cost for installation of 11 KV disc insulator and hardware
labour cost for installation of 11 KV pin insulator and hardware
Labour cost for fixing and erection of HT stay set complete with stay plate, stay insulator, and stay wire for required dimensions and specification
Labour cost for stringing of ACSR/WOLF conductor
Labour cost for dismantling of 16/11/13 mtrs long steel tubular pole
Labour cost for dismantling of channels, angles for phase & earth bracket & cradle guard.
Labour cost for dismentling of 11 KV disc/pin insulator and headware material
Labour cost for tree trimming of OH line (11 KV) (10 days X 10 Unskilled Labour)
Labour cost for 11 KV cable replacement of Sonepur Feeder (10 Semiskilled Labour X 3 Shift)
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
EVERGREEN ENTERPRISE
MONDAL TRADERS
stage.html
html • 0.04 MB
techsummary_281616.pdf
PDF • 1.31 MB
finsummary_281616.pdf
PDF • 1.31 MB
wo756.pdf
PDF • 1.76 MB
finance_281616.pdf
PDF • 0.25 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .