Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC | ₹1.7 Cr | L1 | Accepted-AOC As directed by CWC, Contract Agreement is placed on the L1 Contractor, Siva Enterprises, Chennai, at their revised quoted total amount of Rs. 1,68,40,530.25 /- for carrying out the subject work. |
| 2 | L2₹1.9 Cr+₹25.5 L (15.2%)Rejected-Finance | ₹1.9 Cr+₹25.5 L (15.2%) | L2 | Rejected-Finance Being L2 Contractor, Not Accepted by CWC. |
| 3 | L3₹2.1 Cr+₹45.9 L (27.3%)Rejected-Finance | ₹2.1 Cr+₹45.9 L (27.3%) | L3 | Rejected-Finance Being L3 Contractor, Not Accepted by CWC. |
| Sl No | Description | Qty | Unit | Siva Enterprises L1 | TMS CONSTRUCTIONS L3 | Sri Lakshmi Industries L2 |
|---|---|---|---|---|---|---|
| 1.00 | Demolition of reinforced cement concrete in ground floors and pavings not exceeding 15cm thick. | 42 | CUM | 1,755 ₹73,710 | 900 ₹37,800 Lowest | 1,400 ₹58,800 |
| 2.00 | Demolition of Brick work built in Cement Mortor of any description | 10 | CUM | 1,255 ₹12,550 | 800 ₹8,000 Lowest | 1,450 ₹14,500 |
| 3.00 | Taking down window Shutters of any description but exc 1 sq. m and n exc 2 sq. m each complete all as directed by EIC. | 243 | Each | 95 ₹23,085 | 200 ₹48,600 | 60 ₹14,580 Lowest |
| 4.00 | Taking down door shutters with frame or cupboard shutter with frame exceeding 1.50 sqm but not exceeding 4.00sqm each without taking shutter from the frame complete all as directed by EIC. | 54 | Each | 355 ₹19,170 | 100 ₹5,400 Lowest | 200 ₹10,800 |
| 5.00 | Taking down door shutters with frame or cupboard shutter with frame not exceeding 1.0 sqm each and handing over the same to CE(E)/Store. | 243 | Each | 135 ₹32,805 | 100 ₹24,300 | 95 ₹23,085 Lowest |
| 6.00 | Dismantling floor,hearth or wall tiling including cement mortar bedding (but not backing),removing serviceable tiles to store and rubbish off the premises | 1,360 | SQM | 95 ₹1,29,200 | 90 ₹1,22,400 | 60 ₹81,600 Lowest |
| 7.00 | Taking down Cement plastering on brick walls surfaces of any description including raking out joints, hacking for key, scrubbing down with water, etc. | 1,200 | SQM | 105 ₹1,26,000 | 90 ₹1,08,000 | 80 ₹96,000 Lowest |
| 8.00 | Material and labour for Dubbing out average 10mm thick in C.M 1:4 on irregular face of walls (when specifically ordered in writing). | 1,200 | SQM | 195 ₹2,34,000 | 200 ₹2,40,000 | 120 ₹1,44,000 Lowest |
| 9.00 | M & L for plastering in CM 1:4, 15mm thick on fair faces of brick work and concrete wall surfaces. | 1,250 | SQM | 295 ₹3,68,750 | 350 ₹4,37,500 | 290 ₹3,62,500 Lowest |
| 10.00 | M & L for Brick work built in CM.1:6 using Good quality modular bricks / solid Concrete bricks Bricks.straight or curved on plan exc 6m mean radius. | 20 | CUM | 6,155 ₹1,23,100 Lowest | 9,000 ₹1,80,000 | 7,500 ₹1,50,000 |
Tender Value
₹2.3 Cr
EMD Value
₹3.1 L
Closing Date
24 Sept 2025, 2:00 pmClosed
THE CGM, HVF
THE CGM, HVF, CEO, AVADI, CHENNAI - 600 054
SPECIAL REPAIRS / RENOVATION OF TYPE-IV DAMAGED VACANT QUARTERS AT HVF ESTATE.
2025_AVNL_247784_1
HVF/TE/13025/CEO/2025-26/40
Open Tender
Civil Works
Works
240 days
HVF ESTATE, AVADI
DETAILS ENCLOSED.
8 documents required · 8 mandatory
₹0
₹3.1 L
14 Nov 2025
8 Sept 2025
25 Sept 2025
8 Sept 2025
24 Sept 2025
8 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .