| 1.01 | A REPAIR/RENOVATION OF APFC Panel: 02 Nos
1 Dismantling of defective capacitor units from the APFC panel after suitably discharging the left-over charge on capacitors to ensure safety of the working persons along with dismantling of Capacitors, APFC relay, indications lights, meters, A/M switches, MCCBs including dismantling of terminations and existing hardware and rusted parts and various other items requiring change in the panel as required at site. | 2 | Jobs | 24,000 ₹28,320 | 23,000 ₹27,140 |
| 1.02 | Replacement of defective Super Heavy Duty Capacitor units of various capacities with new capacitor units, rated at 440 V, 3 phase, 50 Hz system complete with terminal cover, cable end entry, mounting structure and hardware etc. -Make Standard | 450 | kVAr | 2,01,600 ₹2.4 L | 2,00,250 ₹2.4 L |
| 1.03 | Banking of capacitors of various capacities with multistrand copper wires & lugs /aluminium bus bars and mounting arrangement for parallel connection to form suitable rating capacitor bank. | 450 | kVAr | 65,250 ₹76,995 | 65,250 ₹76,995 |
| 1.04 | Replacement of defective APFC relay, with new microprocessor based APFC Relay having digital display of power factor and other parameters to sense power factor through control CT and give phased impulses to contactor coils for switching ON-OFF required number of capacitors as per requirement to achieve target power factor. Make Standard | 2 | Nos | 46,736 ₹55,148.48 | 46,600 ₹54,988 |
| 1.05 | Programming of APFC relay for target power factor including setting of various parameters and keeping updated indications of the efficiency of electrical power usage, and improving it for reducing the power losses and avoid penalties from utility companies. | 2 | Jobs | 19,000 ₹22,420 | 19,000 ₹22,420 |
| 1.06 | Replacement of defective capacitor duty contactors suitable for 25 KVAr capacitor with new capacitor duty contactor. Make Standard/EPCOS | 4 | Nos | 17,500 ₹20,650 | 17,400 ₹20,532 |
| 1.07 | Replacement of defective capacitor duty contactors suitable for 50 KVAr capacitor with new capacitor duty contactor. Make Standard/EPCOS | 2 | Nos | 24,790 ₹29,252.20 | 24,700 ₹29,146 |
| 1.08 | Replacement of defective capacitor duty contactors suitable for 16 KVAr capacitor with new capacitor duty contactor. Make Standard/EPCOS | 4 | Nos | 12,560 ₹14,820.80 | 12,560 ₹14,820.80 |
| 1.09 | Replacement of defective triple pole MCB of 63 A capacity with new MCB for operation and safety of individual capacitor bank - make L&T/EPCOS/Standard | 4 | Nos | 5,800 ₹6,844 | 5,800 ₹6,844 |
| 1.10 | Replacement of defective triple pole MCB of 32 A capacity with new MCB for operation and safety of individual capacitor bank - make L&T/EPCOS/Standard | 6 | Nos | 6,900 ₹8,142 | 6,900 ₹8,142 |
Tender Value
Refer Docs
EMD Value
₹14,000
Closing Date
26 Dec 2025, 3:00 pmClosed
EE(E AND M) M-6
EE(E AND M) M-6
Repair/Renovation of standard capacitors make APFC Panel installed at Subhash Park BPS under AC-21 Matia Mahal Constituency.
2025_DJB_283273_8
NIT NO-18 (2025-2026)
Open Tender
Miscellaneous Works
60 days
EE(E AND M)M-6
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
THROUGH DJB OFFICIAL WEBSITE IN LINK TENDER
₹14,000
Yes
29 Dec 2025
20 Dec 2025
26 Dec 2025
20 Dec 2025
26 Dec 2025
20 Dec 2025
A REPAIR/RENOVATION OF APFC Panel: 02 Nos 1 Dismantling of defective capacitor units from the APFC panel after suitably discharging the left-over charge on capacitors to ensure safety of the working persons along with dismantling of Capacitors, APFC relay, indications lights, meters, A/M switches, MCCBs including dismantling of terminations and existing hardware and rusted parts and various other items requiring change in the panel as required at site.
Replacement of defective Super Heavy Duty Capacitor units of various capacities with new capacitor units, rated at 440 V, 3 phase, 50 Hz system complete with terminal cover, cable end entry, mounting structure and hardware etc. -Make Standard
Banking of capacitors of various capacities with multistrand copper wires & lugs /aluminium bus bars and mounting arrangement for parallel connection to form suitable rating capacitor bank.
Replacement of defective APFC relay, with new microprocessor based APFC Relay having digital display of power factor and other parameters to sense power factor through control CT and give phased impulses to contactor coils for switching ON-OFF required number of capacitors as per requirement to achieve target power factor. Make Standard
Programming of APFC relay for target power factor including setting of various parameters and keeping updated indications of the efficiency of electrical power usage, and improving it for reducing the power losses and avoid penalties from utility companies.
Replacement of defective capacitor duty contactors suitable for 25 KVAr capacitor with new capacitor duty contactor. Make Standard/EPCOS
Replacement of defective capacitor duty contactors suitable for 50 KVAr capacitor with new capacitor duty contactor. Make Standard/EPCOS
Replacement of defective capacitor duty contactors suitable for 16 KVAr capacitor with new capacitor duty contactor. Make Standard/EPCOS
Replacement of defective triple pole MCB of 63 A capacity with new MCB for operation and safety of individual capacitor bank - make L&T/EPCOS/Standard
Replacement of defective triple pole MCB of 32 A capacity with new MCB for operation and safety of individual capacitor bank - make L&T/EPCOS/Standard
Supply of Push buttons for replacement ofdefective push buttons to switch ON and OFF capacitor banks in manual mode- make FTC/Standard/L&T
Replacement of defective/burnt out LED indication lights of various colours with new indication lights, make -Standard/L&T
Power wiring with 10 sq. mm multistrand copper wires for connection between capacitors and bus bar using copper lugs and necessary hardware etc. as required at site.
Installation of all above components in the existing capacitor banks with suitable fabrication work to accommodate new items in the existing enclosure / structure for alignment of components and ease of termination, complete with hardware on the mounting structure and termination of existing cables with lugs, tapes etc. complete with earthing of the capacitor banks, touching the rusted parts of the panel structure with paint for protection from moisture etc. as required at site
Servicing of APFC panels including complete dusting of the panel, cleaning of contact points, Decarbonising of joints, alignment of doors, checking of all nuts & bolts, control circuit and power circuit wiring dressing and renovation of control and power terminations etc. as required at site
Testing & Commissioning of complete APFC Panel installation including following: 01. Meggering of complete capacitor installation using 500V megger 02. Continuity test for checking continuity of all circuits to ensure that all circuits are properly wired. 03. Checking function and efficiency of various components of APFC panel
Premier Engineering Company (BID ID -1651156)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_374427.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid