Executive Engineer
Executive Engineer, CD, APWD, Diglipur
A R and M O of Rural Road under Sub Division-V CD, APWD, Diglipur
2023_APWD_9439_1
NIT No. 120/EE/CD/APWD/DP/2022-23
Open Tender
Civil Works - Roads
Works
90 days
Under Sub Division V APWD, Diglipur
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.5 L
Yes
13 Mar 2023
21 Feb 2023
13 Mar 2023
21 Feb 2023
13 Mar 2023
22 Feb 2023
21 Feb 2023 - 22 Feb 2023
Amount
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:
All kinds of soil
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
Preparation and consolidation of sub grade with power road roller of8 to 12 tonne capacity after excavating earth to an average of 22.5cm depth, dressing to camber and consolidating with road rollerincluding making good the undulations etc. and re-rolling the subgrade and disposal of surplus earthwith lead upto 50 metres.
Providing and applying tack coat using hot straight run bitumen ofgrade VG - 10, including heating the bitumen, spraying the bitumenwith mechanically operated spray unit fitted on bitumen boiler,cleaning and preparing the existing road surface as perspecifications :
On bituminous surface @ 0.50 Kg / sqm
Providing and laying Bitumen Penetration Macadam with hard stoneaggregate of quality, size and grading as specified, with bitumen ofsuitable penetration grade, including required key aggregate asspecified, spreading coarse aggregate with the help of self propelled/tipper tail mounted aggregate spreader and applying bitumen by apressure distributor and then spreading key aggregate with the helpof aggregate spreader complete, including consolidation with roadroller of minimum 8 to 10 tonne capacity to achieve specified valuesof compaction and surface accuracy :
For 50mm compacted thickness using coarse aggregateof size 50-20 mm graded @ 0.60 cum per 10 sqm keyaggregate of size 12.5 mm graded @ 0.15 cum per 10sqm. With paving asphalt grade VG - 10 @ 50 kg/ 10sqm.
Providing and laying seal coat of premixed fine aggregate ( passing2.36 mm and retained on 180 micron sieve) with bitumen using 128kg of bitumen of grade VG - 10 bitumen per cum of fine aggregateand 0.60 cum of fine aggregate per 100 sqm of road surface, includingrolling and finishing with road roller all complete.
Providing,Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density.
Sub base with stone aggreagte 90 mm to 45 mm including stone screening13.20mm and moorum all complete
Sub base with stone aggreagte 63 mm to 45 mm including stone screening13.20mm size (typr-A)and moorum all complete
Sub base with stone aggreagte 53 mm to 22.5 mm including stone screening11.20mm size (typr-A)and moorum all complete
2 cm premix carpet surfacing with 1.8 cum and 0.90 cum of stone chippings of 13.2 mm size and 11.2 mm size respectively per 100 sqm and 47.84 kg and 51.84 kg of hot bitumen per cum 4.16kgs of shredded plastic per cum of stone chippings of 13.2 mm and 11.2 mm size respectively, including a tack coat with hot straight run bitumen, including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately).
With paving Asphalt grade VG - 30 with no solvent
Total of A(Sum of total amount)
Routine Maintenance after completion of construction works (Lump-Sum Amount for each year) Please check Sheet1 for Details
1st Year 0.25%
2nd Year 1.00%
3rd Year 1.50%
4th Year 2.00%
5th Year 2.75%
Total of B(Sum of total maintanance amount from sheet1)
Total A+B
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .