Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance | -0.50% | ₹2.9 L | L1 | Admitted-Finance |
| 2 | L2₹3.0 LAdmitted-Finance | +2.00% | ₹3.0 L | L2 | Admitted-Finance |
| 3 | L3₹3.0 LAdmitted-Finance | +3.00% | ₹3.0 L | L3 | Admitted-Finance |
Tender Value
₹2.9 L
EMD Value
₹5,880
Closing Date
6 Aug 2026, 6:00 pmClosed
XEN REW JAMMU
XEN REW JAMMU
Constt. of Lane and drain from main road by way house of sh. Mastan Singh to onwards w.no.4 pyt.Khour Block Miran Sahib Year 2026-27 panchayat level
2026_RDPR_317581_13
e-NIT No. 252 REWJ of 2026-27 dated 23-07-2026
Open Tender
Civil Works
Percentage
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹5,880
27 Aug 2026
24 Jul 2026
7 Aug 2026
24 Jul 2026
6 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | General site clearance including levelling of ground and disposal of material. (LS) | 4 | no | 553 | ₹2,212 |
| 2 | Removal of unhygienic materials (so classified by the site engineer) from designated
sites and its disposal as per directions, all inclusive. | 10.2 | cum | 189.2 | ₹1,929.84 |
| 3 | Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil. | 2.83 | cum | 479.3 | ₹1,356.42 |
| 4 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 4.95 | cum | 4,826.5 | ₹23,891.18 |
| 5 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 16.76 | cum | 5,733.6 | ₹96,095.14 |
| 6 | Centring and shuttering including strutting, propping etc and removal of the formwork. | 18.59 | sqm | 286.35 | ₹5,323.25 |
| 7 | Providing and lying 60 mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design /shape laid in required colour and pattern over and including 50 mm thick compacted bed of fine sand ,filling | 182.16 | sqm | 816.15 | ₹1,48,669.88 |
| 8 | Carriage of Sand 15km by MT | 10.2 | cum | 344.49 | ₹3,513.8 |
| 9 | Carriage of agrregates 15km by MT | 19.32 | cum | 344.49 | ₹6,655.55 |
| 10 | Providing and fixing of Marble sign board with complete job | 1 | no | 5,000 | ₹5,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_1041386.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].