Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.8 CrAccepted-Finance 2ND ROSHAN TOWER S B SHOP BISTUPUR AREA EAST SINGHBHUM JHARKHAND | BISTUPUR | EAST SINGHBHUM | JHARKHAND | 831001 | ₹5.8 Cr | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹6.3 Cr+₹46.2 L (7.91%)Accepted-Finance 8TH FLOOR BRIGADE OPUS KODIGEHALLI MAIN ROAD BANGALORE KARNATAKA 560092 | BENGALURU URBAN | KARNATAKA | 560092 | ₹6.3 Cr+₹46.2 L (7.91%) | L-2 | Accepted-Finance L-2 |
| 3 | L-3₹8.4 Cr+₹2.6 Cr (44.7%)Accepted-Finance A 18 FIRST FLOOR FIEE COMPLEX OKHLA INDUSTRIAL AREA PHASE II NEW DELHI | ₹8.4 Cr+₹2.6 Cr (44.7%) | L-3 | Accepted-Finance L-3 |
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
29 Aug 2022, 3:00 pmClosed
Sr MGR
Western Region Head QuartersII Plot No. -87, Sector-24, Atal RAIPUR 492018
Replacement of Existing Control and Protection System along with SCADA of 400 KV, Stage- III Switchyard of NTPC Vindhyachal (2X500MW)
2022_NTPC_63196_1
NTPC/USSC-CPG1/9900238490
Open Tender
Electrical and Maintenance Works
Works
1095 days
Western Region Head QuartersII Plot No. -87, Secto
As per tender documents
3 documents required · 3 mandatory
₹5,310
₹10 L
Yes
29 Mar 2023
30 Apr 2022
30 Aug 2022
30 Apr 2022
29 Aug 2022
30 Apr 2022
30 Apr 2022 - 7 May 2022
Amount
Supply of Materials and Mandatory Spares
Supply of Materials
Supply of Mandatory Spares.
Dismantling,Erec.,Testing &Commissioning
Dismantling,Erec.,Testing &Commissioning
Amount linked to safety Compliance
Hitachi Energy India Limited
GE T&D INDIA LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .