Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.3 LAccepted-AOC | ₹21.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹21.8 LRejected-Finance MU PO LONHIVAR TA BHOOM JI DHARASHIV | DHARASHIV | MAHARASHTRA | ₹21.8 L | L2 | Rejected-Finance R |
| 3 | L3₹21.9 LRejected-Finance AT POST HOUSE NO 26 1302 PRABHU KRUPA WARUDA ROAD KESHAV NAGAR SAMARTH NAGAR DHARASHIV 413501 | DHARASHIV | DHARASHIV | MAHARASHTRA | 413501 | ₹21.9 L | L3 | Rejected-Finance R |
| 4 | Not Admitted-Fee/PreQual/Technical 1551 SUBHASH NAGAR BARSHI TAL BARSHI DIST SOLAPUR | BARSHI | SOLAPUR | MAHARASHTRA | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹21.3 L
EMD Value
₹21,258
Closing Date
14 Mar 2026, 6:30 pmClosed
EXECUTIVE ENGINEER WORKS ZILLA PARISHAD DHARASHIV
EXECUTIVE ENGINEER WORKS ZILLA PARISHAD DHARASHIV
Improvement to MDR 09 to Aarangaon VR 67 Road Km 0/00 to 4/00 ( Actual Km 3/00 to 3/700 ) Tq. Paranda
2026_OSMAN_1284396_4
24/2025-26
Open Tender
Civil Works - Roads
100 days
Improvement to MDR 09 to Aarangaon VR 67 Road Km 0
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
₹21,258
22 May 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
14 Mar 2026
6 Mar 2026
Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)40 mm Metal, By breaking Boulders (Hand broken).
Supplying soft murum at the road site, including conveying and stacking complete.
Supplying hard murum/ kankar at the road site, including conveying and stacking complete.
Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge .
Spreading hard murum/ soft murrum/ gravel or kankar for side width complete
Compacting the sub grade / gravel / size metal (100 mm loose) layers for all widths with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete.
Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc. complete.
Providing and constructing 50 mm. thick Modified Penetration Macadam (MPM) road surface including all mataerials, preparing the existing road surface, spreading 40mm. stone metal layers 30% crusher broken metal + 70% Hand broken (by breaking rubble obtained by blasting) heating and spraying the bitumen of specified grade @ 1.75 Kilogram/Square Metre, spreading 12mm.size chips compacting with static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc. complete. Including picking of existing WBM surface.(VG-30 bulk bitumen rates are considered to arrive at rates)
Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 Kilogram/10 Square Metre.(VG-30 bulk bitumen rates are considered to arrive at rates)
Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack and Seal coat. For Bitumen of specified grade--USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller ( Over MPM Surface) (VG-30 bulk bitumen rates are considered to arrive at rates)
Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials and bitumen of specified grade preparing existing road surface, heating and applying bitumen @ 0.98 KilogramSquare Metre. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete. (VG-30 bulk bitumen rates are considered to arrive at rates)
Sieve Analysis For Metal
BITUMEN Penetration, Softening Point, Flash & Fire Point, Specific Gravity .
Royalty Charges For Supply of Soil 40mm/80mm Metal (Hand Broken)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
Tendernotice_2.pdf
PDF • 1.34 MB
BOQ_2208811.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid