Loading…
Loading…
Tender Value
₹82.1 Cr
EMD Value
₹3 L
Closing Date
9 Dec 2025, 3:00 pmClosed
DIRECTOR PROJECTS
7th Floor, New MMRDA Building, Bandra-Kurla Complex, Bandra East, Mumbai 400 051
Construction of Foot Over Bridges for Mumbai Metro Line 9 Package 1
2025_MMRDA_1251964_1
MMRDA/TC/FOB/2025
Open Tender
Civil Works
Mira Bhyander
Please refer Tender documents.
8 documents required · 8 mandatory
₹3,540
₹3 L
MMRDA BKC
8 Jan 2026
25 Nov 2025
10 Dec 2025
25 Nov 2025
9 Dec 2025
25 Nov 2025
1 Dec 2025
Foot Over Bridge
Construction of Foot Over Bridges for Mumbai Metro Line 9: Package 1
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
Tender_Document.pdf
Tender Documents • 22.07 MB
Corrigendum1.pdf
Other Document • 0.26 MB
BOQ_2158496.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid