| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | R1₹7.9 LAccepted-AOC | R1 | Accepted-AOC L1 | |
| 2 | R2₹7.9 LRejected-Finance | R2 | Rejected-Finance Quoted higher than estimate rate |
| Sl No | Description | Qty | Unit | B Sabari Contractor L2 | G Selvam L1 |
|---|---|---|---|---|---|
| 1.00Construction of Waiting shed at Subanraopettai in S.V.Nagaram Panchayat in Arni Block under MLACDS scheme 2025-2026 | |||||
| 1.01 | Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth, shale murums, gravel stoneyearth, and earth mixed with 50 % fair sized boulders, and hard graveily soil, in foundation.as per SS 20 B | 21.72 | Cum | 248 ₹5,386.56 | 246 ₹5,343.12 Lowest |
| 1.02 | Supplying and filling in foundation and basement with good M-sand in layers not more 15 cm thick including ramming, watering and compacting etc.complete complying to standard specification | 3.15 | Cum | 1,615 ₹5,087.25 | 1,611 ₹5,074.65 Lowest |
| 1.03 | Refilling the basement with excavated earth other than sand complying the Standard specification | 6.3 | Cum | 45 ₹283.5 | 42 ₹264.6 Lowest |
| 1.04 | Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete. | 5.04 | Cum | 5,117 ₹25,789.68 | 5,115 ₹25,779.6 Lowest |
| 1.05 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications. | 11.19 | Cum | 5,948 ₹66,558.12 | 5,947 ₹66,546.93 Lowest |
| 1.06 | Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification. | 2.22 | MT | 89,930 ₹1,99,644.6 | 89,927 ₹1,99,637.94 Lowest |
| 1.07Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels, | |||||
| 1.08 | Below ground level | 15.99 | Sqm | 518 ₹8,282.82 | 517 ₹8,266.83 Lowest |
| 1.09 | Above ground level | 76.4 | Sqm | 1,036 ₹79,150.4 | 1,034 ₹78,997.6 Lowest |
Tender Value
₹8 L
EMD Value
₹8,000
Closing Date
23 Jul 2025, 4:00 pmClosed
Block Development Officer(B.Pt) Arni
Block Development Office (B.Pt) Arni
Construction of Waiting shed at Subanraopettai in S.V.Nagaram Panchayat in Arni Block under MLACDS scheme 2025-2026
2025_RDTN_581778_1
A6/4300/2025 Date 25.06.2025 ARNI04
Open Tender
Civil Works - Buildings
Item Rate
180 days
Arni
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,000
28 Sept 2026
15 Jul 2025
23 Jul 2025
15 Jul 2025
23 Jul 2025
15 Jul 2025
Amount
Construction of Waiting shed at Subanraopettai in S.V.Nagaram Panchayat in Arni Block under MLACDS scheme 2025-2026
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth, shale murums, gravel stoneyearth, and earth mixed with 50 % fair sized boulders, and hard graveily soil, in foundation.as per SS 20 B
Supplying and filling in foundation and basement with good M-sand in layers not more 15 cm thick including ramming, watering and compacting etc.complete complying to standard specification
Refilling the basement with excavated earth other than sand complying the Standard specification
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete.
Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications.
Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification.
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels,
Below ground level
Above ground level
Rainforcement Cement Concrete 1:1½:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges, centering and shuttering but icluding curing and providing fixtures like fan clamps in the RCC floor or roof.te.
Plastering with CM 1:5, 12mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Supplying & fixing of Granite slab of 20mm thick with nosing, cutting and bedding laid over in CM 1 : 2 20mm thick - 10 Sqm.,
Weathering coourse concrete using best quality broken brick jelly at size 20 mm in pure slacked lime over the RCC roof slab in the proportion of brick jelly to lime being 32:12.5 by the volume and laid over a single layer and conolidated to the required design & finished thick. beating the concrete with wooden beaters of approved pattern, keeping the surface contantly wetted with sprinking lime & jaggery water as per standard specifications etc., complete as directed by the departmental offficers
Terrace Floor finshed with one course of pressed tiles of size 20x20x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete
Colour Washing with best Distempering two Coats in to primer coat and two coats with oil bound distember over cement plasterd surface ceiling and other new surface and including clearing,preparing the surface and etc.,complete.
Painting two coat using readymixed emulsion paint of approved quality and colour over priming coat (New) including cost and all labour charges etc. complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
B Sabari Contractor (BID ID -1408648)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .