Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-AOC | L1 | Accepted-AOC RATES ARE FOUND REASONABLE AND THE FIRM BEING L1 BIDDER | |
| 2 | L2₹9.2 L+₹3,898.50 (0.42%)Rejected-Finance | L2 | Rejected-Finance BEING L2 BIDDER | |
| 3 | L3₹9.3 L+₹8,572 (0.93%)Rejected-Finance | L3 | Rejected-Finance BEING L3 BIDDER | |
| 4 | L4₹9.3 L+₹11,593.50 (1.26%)Rejected-Finance DARJEELING DHOTREY FOREST BANSBOTAY DARJEELING P S DARJEELING DHOTREY FOREST BANSBOTAY DARJEELING P S DARJEELING DARJEELING WEST BENGAL 734201 | DARJEELING | WEST BENGAL | 734201 | L4 | Rejected-Finance BEING L4 BIDDER | |
| 5 | L5₹9.3 L+₹12,719 (1.38%)Rejected-Finance | L5 | Rejected-Finance BEING L5 BIDDER |
| Sl No | Description | Qty | Unit | JALAPAHAR HARDWARE L3 | BIMAL BHATTRAI L5 | HIRA SINGH L1 | REEMA TAMANG AND SONS L4 | Damdoo Bhutia L6 | RAI CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling boarding, any description fixed in any position with nails, complete all as specified and as directed by Engineer-in-charge. | 32 | Sqm | 42 ₹1,344 Lowest | 45 ₹1,440 | 48 ₹1,536 | 42 ₹1,344 Lowest | 43 ₹1,376 | 45 ₹1,440 |
| 2.00 | S&F 40mm thick 2nd class hardwood planed one side with tongued and grooved joints and fixed with nails as in floors, complete all as specified and as directed by Engineer-in-charge. | 25 | Sqm | 4,290 ₹1,07,250 | 4,315 ₹1,07,875 | 4,270 ₹1,06,750 Lowest | 4,285 ₹1,07,125 | 4,303 ₹1,07,575 | 4,290 ₹1,07,250 |
| 3.00 | S&F 20mm thick 2nd class hardwood planed one side with butt joints as in shelves of cupboards, racks and pelmets, eaves board and skirting work fixed with nails, complete all as specified and as directed by Engineer-in-charge. | 7 | Sqm | 2,240 ₹15,680 | 2,300 ₹16,100 | 2,230 ₹15,610 Lowest | 2,260 ₹15,820 | 2,230 ₹15,610 Lowest | 2,240 ₹15,680 |
| 4.00 | Dismantling wall and ceiling boards (fibre, pulp, insulation,etc) or insulation board/Slabs/blankets of any thickness including cover fillets, complete all as specified and as directed by Engineer-in-charge. | 265 | Sqm | 40 ₹10,600 | 45 ₹11,925 | 40 ₹10,600 | 40 ₹10,600 | 45 ₹11,925 | 35 ₹9,275 Lowest |
| 5.00 | M&L 15mm thick 2nd class soft wood planed one side & edges tongued and grooved or rebated with butt joints as in wall panelling and similar work fixed with nails, complete all as specified and as directed by Engineer-in-charge. | 220 | Sqm | 1,560 ₹3,43,200 | 1,540 ₹3,38,800 Lowest | 1,550 ₹3,41,000 | 1,555 ₹3,42,100 | 1,599.1 ₹3,51,802 | 1,560 ₹3,43,200 |
| 6.00 | M&L for 6mm thick veneered decorative plywood grade 1 (with BWR resin) with decorative face veneers on one faces fixed with nails to timber frame work, complete all as specified and as directed by Engineer-in-charge. | 45 | Sqm | 925 ₹41,625 | 950 ₹42,750 | 910 ₹40,950 Lowest | 925 ₹41,625 | 911 ₹40,995 | 925 ₹41,625 |
| 7.00 | Dismantling Unframed timber scantlings 40 Sqcm and over in section and in any position, complete all as specified and as directed by Engineer-in-charge. | 0.7 | Cum | 920 ₹644 | 900 ₹630 Lowest | 920 ₹644 | 915 ₹640.5 | 903 ₹632.1 | 910 ₹637 |
| 8.00 | Dismantling of unframed fillets, rails, posts, rafters, purlins etc., under 40 Sqcm in section, complete all as specified and as directed by Engineer-in-charge. | 174 | RM | 30 ₹5,220 | 35 ₹6,090 | 14 ₹2,436 Lowest | 30 ₹5,220 | 22.5 ₹3,915 | 15 ₹2,610 |
| 9.00 | M&L for second class HW scantlings clean sawn in timber fixed work, complete all as specified and as directed by Engineer-in-charge. | 1.35 | Cum | 97,800 ₹1,32,030 | 98,000 ₹1,32,300 | 97,500 ₹1,31,625 | 97,400 ₹1,31,490 Lowest | 97,888 ₹1,32,148.8 | 97,450 ₹1,31,557.5 |
| 10.00 | M&L for preparing surfaces of wood and wood based materials, new or old of any description and girth, not otherwise described and treated with two coats of creosote oil, complete all as specified and as directed by Engineer-in-charge. | 80 | Sqm | 55 ₹4,400 | 55 ₹4,400 | 45 ₹3,600 Lowest | 65 ₹5,200 | 65 ₹5,200 | 50 ₹4,000 |
Tender Value
₹9.1 L
EMD Value
₹18,200
Closing Date
28 Apr 2026, 6:00 pmClosed
AGE I DARJEELING
AGE I DARJEELING JALAPAHAR CANT DIST - DARJEELING
REPAIR TO FLOORING, FLOOR PAINTING AND WALL PANELLING AT JALAPAHAR AND KATAPAHAR UNDER AGE (I) DARJEELING
2026_MES_759655_1
8221/E8
Open Tender
Civil Works
Item Rate
180 days
JALAPAHAR AND KATAPAHAR
AS PER NIT
9 documents required · 9 mandatory
₹500
AGE I DARJEELING
₹18,200
Yes
3 Jun 2026
9 Apr 2026
30 Apr 2026
9 Apr 2026
28 Apr 2026
23 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling boarding, any description fixed in any position with nails, complete all as specified and as directed by Engineer-in-charge. | - | Sqm | - | - |
| 2 | S&F 40mm thick 2nd class hardwood planed one side with tongued and grooved joints and fixed with nails as in floors, complete all as specified and as directed by Engineer-in-charge. | - | Sqm | - | - |
| 3 | S&F 20mm thick 2nd class hardwood planed one side with butt joints as in shelves of cupboards, racks and pelmets, eaves board and skirting work fixed with nails, complete all as specified and as directed by Engineer-in-charge. | - | Sqm | - | - |
| 4 | Dismantling wall and ceiling boards (fibre, pulp, insulation,etc) or insulation board/Slabs/blankets of any thickness including cover fillets, complete all as specified and as directed by Engineer-in-charge. | - | Sqm | - | - |
| 5 | M&L 15mm thick 2nd class soft wood planed one side & edges tongued and grooved or rebated with butt joints as in wall panelling and similar work fixed with nails, complete all as specified and as directed by Engineer-in-charge. | - | Sqm | - | - |
| 6 | M&L for 6mm thick veneered decorative plywood grade 1 (with BWR resin) with decorative face veneers on one faces fixed with nails to timber frame work, complete all as specified and as directed by Engineer-in-charge. | - | Sqm | - | - |
| 7 | Dismantling Unframed timber scantlings 40 Sqcm and over in section and in any position, complete all as specified and as directed by Engineer-in-charge. | - | Cum | - | - |
| 8 | Dismantling of unframed fillets, rails, posts, rafters, purlins etc., under 40 Sqcm in section, complete all as specified and as directed by Engineer-in-charge. | - | RM | - | - |
| 9 | M&L for second class HW scantlings clean sawn in timber fixed work, complete all as specified and as directed by Engineer-in-charge. | - | Cum | - | - |
| 10 | M&L for preparing surfaces of wood and wood based materials, new or old of any description and girth, not otherwise described and treated with two coats of creosote oil, complete all as specified and as directed by Engineer-in-charge. | - | Sqm | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
8221TENDERDOCUMENTS.pdf
Tender Documents • 2.49 MB
BOQ_850866.xls
BOQ • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .