Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹70.1 LAccepted-Finance | ₹70.1 L | L1 | Accepted-Finance L1 called for negotiation |
| 2 | L2₹70.4 LAccepted-Finance | ₹70.4 L | L2 | Accepted-Finance L2 called for financial evaluation |
| Sl No | Description | Qty | Unit | N SELVAKUAMRAN L2 | MAAMAYAN TRADITIONAL ARCHITECTS & SCULPTORS L1 |
|---|---|---|---|---|---|
| 1.00 | Restoration by providing water wash and appropriate methodology to restore the originalities of the existing Cutstone structures inclusive of necessary scaffolding charges, conveyance and all hire charges for all tools and plants and clearing the site after completion of work etc, complete | 1,370 | Sqm | 46 ₹63,020 | 39 ₹53,430 |
| 2.00 | Pointing with Lime mortar 1:1.5 (One lime and One and Half Sand ) including cost and conveyance of all materials and all labour charges etc complete complying with standard specification. | 1,148 | Sqm | 278 ₹3.2 L | 268 ₹3.1 L |
| 3.00 | Removing the Ceramic tiles and clearing away from the site member including including hire charges for tools and plants, scaffolding for working in heights and all incidental charges etc complete. W-0041 | 33 | Sqm | 67 ₹2,211 | 60 ₹1,980 |
| 4.00 | Removing the Lime Plastering and clearing away from the site member including including hire charges for tools and plants, scaffolding for working in heights and all incidental charges etc complete. W-0103 | 82 | Sqm | 9 ₹738 | 7 ₹574 |
| 5.00 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 44 | Sqm | 291 ₹12,804 | 280 ₹12,320 |
| 6.00 | Painting the wall two coats with approved weather proof Exterior Emulsion paint over one primer coat of over cement plastered wall surface ect., complete complying with standard specification. | 44 | Sqm | 242 ₹10,648 | 235 ₹10,340 |
| 7.00 | Removing the one course machine pressed tiles and clearing away from the site member including including hire charges for tools and plants, scaffolding for working in heights and all incidental charges etc complete.(W-0038) | 217 | Sqm | 27 ₹5,859 | 20 ₹4,340 |
| 8.00 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in lime Mortar 1:3 (One lime and Three Crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same lime mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers | 286 | Sqm | 1,353 ₹3.9 L | 1,350 ₹3.9 L |
| 9.00Scaffolding charges for Vimanams and Gopurams with casurina posts coconut or palm trees wherever necessary for main, form work and providing with net lawn /PVC mesh coverings, providing ladder arrangements, country wood plank for working, inspection etc. complete, hire charges only for erection, maintenance and removing the same on completion of the work. | |||||
| 9.01 | Upto 15' height | 224 | Sqm | 283 ₹63,392 | 280 ₹62,720 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹45,500
Closing Date
24 Dec 2025, 2:00 pmClosed
Executive officer
Arulmigu Lakshmi Narayanar Thirukovil, Ambasamudram Taluk and Tirunelveli District.
Repair and Renovation works of Arulmigu Lakshmi Narayanar Thirukovil, Ambasamudram Taluk and Tirunelveli District.
2025_HRCE_610124_1
2/2025
Open Tender
Civil Works - Others
365 days
Ambasamudram
Refer tender document
5 documents required · 5 mandatory
₹0
₹45,500
24 Dec 2025
8 Oct 2025
24 Dec 2025
8 Oct 2025
24 Dec 2025
8 Oct 2025
Amount
Restoration by providing water wash and appropriate methodology to restore the originalities of the existing Cutstone structures inclusive of necessary scaffolding charges, conveyance and all hire charges for all tools and plants and clearing the site after completion of work etc, complete
Pointing with Lime mortar 1:1.5 (One lime and One and Half Sand ) including cost and conveyance of all materials and all labour charges etc complete complying with standard specification.
Removing the Ceramic tiles and clearing away from the site member including including hire charges for tools and plants, scaffolding for working in heights and all incidental charges etc complete. W-0041
Removing the Lime Plastering and clearing away from the site member including including hire charges for tools and plants, scaffolding for working in heights and all incidental charges etc complete. W-0103
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting the wall two coats with approved weather proof Exterior Emulsion paint over one primer coat of over cement plastered wall surface ect., complete complying with standard specification.
Removing the one course machine pressed tiles and clearing away from the site member including including hire charges for tools and plants, scaffolding for working in heights and all incidental charges etc complete.(W-0038)
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in lime Mortar 1:3 (One lime and Three Crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same lime mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Scaffolding charges for Vimanams and Gopurams with casurina posts coconut or palm trees wherever necessary for main, form work and providing with net lawn /PVC mesh coverings, providing ladder arrangements, country wood plank for working, inspection etc. complete, hire charges only for erection, maintenance and removing the same on completion of the work.
Upto 15' height
Providing vargapoochu over the walls of Vimanam/Gopuram with Lime Mortar 1:2 complete including shaping Mukapathrams matha nasi koodu and all ornamental works to proper shape by embedding broken chips or shaped chiselled bricks, rough plastering and finishing with final ornamental plastering and nayam theervai etc., complete for 100sqft. 15 ' Height
15' Height
Painting with multicolour (Panchavaranam) good water based exterior emulsion paints complete for the Vimanas/ Gopurams, including cost and conveyance of all materials, labour charges including Artist painter, working in helghts, lifting of material cost of brushes etc., complete. - 100 Sft. Superficialarea. 15 ' Height
Dismantling the RCC and clearing away from the site member including including hire charges for tools and plants, scaffolding for working in heights and all incidental charges etc complete. W-0035
Dismantling the Brick Masonry with CM and clearing away from the site member including including hire charges for tools and plants, scaffolding for working in heights and all incidental charges etc complete. W-0015
Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification
Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification .
Brick work using using Country Bricks of size 8-3/4" x 4-1/4" X2-3/4" in Cement Mortar 1:5(One cement and Five crushed stone sand) including curing neat finishing, etc., complete complying with standard specifiction.Below Ground level
Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and laying new cut stone of good variety and required size from approved quarry including cost and conveynance of cut stone for labour charges for loading including and all other incidental charges etc complete. (Single line dressing)
Labour wrought and put up in position Shutters for fully panelled doors internal five plywood panels including labour charges for fixing furniture fittings complying with standard drawings and standard specification.
Painting old wood work with one finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Removing the Thirumathil Wall Ulvari and Velivari and clearing away from the site member including including hire charges for tools and plants, scaffolding for working in heights and all incidental charges etc complete. HR-W0007
Dismantling the Lime Concrete and clearing away from the site member including including hire charges for tools and plants, scaffolding for working in heights and all incidental charges etc complete. W-0035
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Refixing the Thirumathil wall including hire charges for tools and plants, scaffolding for working in heights and all incidental charges etc complete. HR-W0010
Supplying cut stone for thirumathil wall of good variety and required size from approved quarry including cost and conveynance of cut stone for labour charges for loading including and all other incidental charges etc complete.
Labour charges for Fixing Thirumathil cut stone member including loading and unloading Charges and all other incidental charges etc complete. (For Thirumathil Wall cut stone)
Brick masonry Lime mortar 1:2 using Stock bricks including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for vimanam / gopuram - Upto 15' height
Sub total
N SELVAKUAMRAN (BID ID -1544016)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_729032.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
Tenderconditionreeee.pdf
Tender Documents • 0.64 MB
BOQ_729032.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid