| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.8 LAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | L2₹43.8 L+₹5,611.20 (0.13%)Rejected-Finance | L2 | Rejected-Finance Not the lowest bidder | |
| 3 | L3₹44.5 L+₹70,941.60 (1.62%)Rejected-Finance AT PO CHANDIPUR BALASORE 756025 | BALASORE | BALASORE | ODISHA | 756025 | L3 | Rejected-Finance Not the lowest bidder | |
| 4 | L4₹45.0 L+₹1.2 L (2.77%)Rejected-Finance JANUGANJ REMUNA GOLAI BALASORE 756 019 ODISHA | BALESHWAR | ODISHA | 756019 | L4 | Rejected-Finance Not the lowest bidder | |
| 5 | L5₹45.9 L+₹2.2 L (4.92%)Rejected-Finance PASCHIM BHAGABANPORE DARUA CONTAI PURBA MEDINIPUR 721401 | PURBA MEDINIPUR | PURBA MEDINIPUR | WEST BENGAL | 721401 | L5 | Rejected-Finance Not the lowest bidder |
Tender Value
₹44.9 L
EMD Value
₹90,000
Closing Date
23 Jun 2020, 6:00 pmClosed
CHANDIPUR
GE I R and D Chandipur, Post- Chandipur, PIN-756025
OUTSOURCING OF SERVICES FOR MAINTENANCE AND OPERATION OF SEWAGE INSTALLATIONS AT RESIDENTIAL AREA CHANDIPUR
2020_MES_345686_1
8550/CDP
Open Tender
Civil Works
Item Rate
334 days
CHANDIPUR
Please refer Tender Documents
6 documents required · 6 mandatory
₹500
Yes
GE I R and D Chandipur
₹90,000
Yes
14 Sept 2020
18 May 2020
25 Jun 2020
18 May 2020
23 Jun 2020
5 Jun 2020
Amount
Outsourcing services for maintenance and operation of following sewage installations (as mentioned in ser item No.1.01 to 1.06) by employing operator (skilled).The resources deployed to ensure uninterrupted services shall be in accordance with the details given in PS and all as directed by Engineer-in-Charge.
For Sewage Pump House No - 01, one operator (skilled) is required in two Shift of 08 hours each on all days including Sundays and holidays (668 shifts) Details of plants/equipment to be operated and maintained under this item are as follows:- (i) Non-Clogging Pump set 15 HP - 01 No (ii) Non-Clogging Pump Set - 05 HP - 01 No (iii) Control Panel with all accessories including starter - 02 Nos (iv) Sewage Sump of capacity 10000 Gallons - 01 No
For Sewage Pump House No - 03 & 04, one operator (skilled) is required in two Shift of 08 hours each on all days including Sundays and holidays (668 shifts) Details of plants/equipment to be operated and maintained under this item are as follows:- (i) Non- Clogging Pump set 15 HP - 04 Nos (ii) Control Panel with all accessories including starter - 04 Nos (iii) Sewage Sump capacity 10000 Gallons - 02 Nos.
For Sewage Pump House No - 05 & 09, one operator (skilled) is required in two Shift of 08 hours each on all days including Sundays and holidays (668 shifts) Details of plants/equipment to be operated and maintained under this item are as follows:- (i) Non-Clogging Pump set 15 HP - 01 No (ii) Non-Clogging Pump Set - 7.5 HP - 02 Nos (iii) DG Set 82.5 KVA with panel and change over switch - 01 No (iv) Sewage sump of capacity 5000 & 10000 Gallons - 02 Nos. (v) Control Panel with all accessories including starter - 03 Nos
For Sewage Pump House No - 06, one operator (skilled) is required in two Shift of 08 hours each on all days including Sundays and holidays (668 shifts) Details of plants/equipment to be operated and maintained under this item are as follows:- (i) Non-Clogging Pump set 7.5 HP - 01 No (ii) Control Panel with all accessories including starter - 01 No (iii) Sewage sump of capacity 5000 Gallons - 01 No.
For Sewage Pump House No - 10, one operator (skilled) is required in two Shift of 08 hours each on all days including Sundays and holidays (668 shifts) Details of plants/equipment to be operated and maintained under this item are as follows:- (i) Non-Clogging Pump set 15 HP - 02 Nos (ii) Control Panel with all accessories including starter - 02 Nos (iii) Sewage sump of capacity 10000 Gallons - 01 No.
For Sewage Pump House No - 11, one operator (skilled) is required in two Shift of 08 hours each on all days including Sundays and holidays (668 shifts) Details of plants/equipment to be operated and maintained under this item are as follows:- (i) Non-Clogging Pump set 15 HP - 02 Nos (ii) Control Panel with all accessories including starter - 02 Nos (iv) Sewage sump of capacity 10000 Gallons - 01 No.
NOTE- The rates quoted for operation and maintenance of installations will include the following :- (i) Providing optimum manpower. Minimum qualification of all the manpower employed will be ITI passed in respective field of work with minimum 3 years experience. The contractor will submit the details of manpower employed before commencement of work. (ii) Duty timings will be as follows. For round the clock duties: 1st shift - 06:00 - 14:00 Hrs, 2nd shift - 14:00 - 22:00 Hrs, 3rd shift - 22:00 Hrs - 06:00 Hrs. For General duty/one shift - 08:30 - 16:30 Hrs. Overtime duty will only be allowed during single shift / General duty after obtaining prior permission of Engr-in-charge against written certificate from users. Allowance of overtime hours will be calculated as per specified norms mentioned in particular specifications.Weekely off shall be given to each operator and a reliever should be provided during weekely off and the rate quoted shall be inclusive of the same. (iii) Cleaning of all equipments (Electrical and mechanical) and installations from inside and outside. (iv) Daily Check of DG Set as per manufacturer manual before starting the machine and ensure routine mainteneance including checking of water in radiator and topping up, checking of tightness of bolts ,nuts etc of coupling and other accessories, checking of fule pipe line if leakng ,checking of battery sets of its specific gravity and replacing distilled water as as whene required and maintaining records of operation,maintenance and check etc. (v)BLANK (vi) Daily consumables such as grease, gland rope, cotton waste etc shall be provided by contractor at installations and the unit rate quoted shall be inclusive of the same. (vii) Area cleaning including cutting of grass, etc all around the installations as directed by Engr-in charge. (viii) Any abnormality observed to be immediately intimated to the maintenance team with intimation to the concerned MES Personnel / in charge.
(ix) Minimum required tools be always available with the operator (x) Log sheets to be maintained regularly in binding book with respect to detailed parameters of power including details of FOL drawn consumed and balance all as directed by the Engr-in-Charge (xi) First aid box including medicines shall be kept in the installations (xii) DHPP will be issued under Sch 'B'.Free for filling. The contractor will collect Sch 'B' store from POL stores of MES office and deliver to site and no extra payment shall be made on this account . (xiii) The Contractor shall arrange the empty Barrel for collection of DHPP. (xiv) All the personnel employed for operation and maintenance should be in proper uniform and safety outfits as per relevant norms. They may also be required to be deployed in any other locations other than mentioned above as per the site requirements and exigencies. (xv) Attending telephone calls where telephone is available, logging the details of events and further taking necessary actions or communicating to concerned officials of MES and as directed by Engr-in-charge (xvi) Maintaining records of operations and repairs as directed by Engr-in-charge and submitting details monthly and when called for. (xvii) The rates are deemed to include minimum fair wages, EPF, ECIS etc to paid to the employed personnel as per the rules enforced by the Govt time to time and payment of all taxes as per govt rule.
(xviii) Contractor shall also keep the sufficient stock of the following stores :- (a) All types of nuts, bolts, washers, screws and other fasteners. (b) All types of cable lugs thimbles, cable sockets ferrule, insulation tapes etc. (c) BLANK. (d) Fabricating materials, cotton waste, brooms , torches, torch cells, gland packing, rubber insertion sheet etc. (e) One set of tools and two sets of safety equipments and outfits as per the requirement of installation and works.(f) Any other spares, tools or works felt necessary for proper services as decided by Engr-in-charge and Garrison Engineer. (xix) BLANK. (xx) if any defect arises to any installation due to improper operation, negligence or poor maintenance, the contractor will be liable for making good of the defects. (xxi) Projected number of shifts in the BOQ is tentative. The exact no of shits would be according to the no of shifts as per item description in the BOQ in concurrence with the period of work as will be mentioned in the subsequently placed work order.
Bansal And Co
DS ENTERPRISES
M/s LADHANIA BROTHERS
RANA ENTERPRISES
Shree Mahavir Associates
Rounaq Enterprise
Shri Sai Enterprises
RPL SYNDICATE CO
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .