| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.3 LAccepted-AOC MONIRAMPUR DASPARA P O BARRACKPORE | BARRACKPORE | NORTH 24 PARGANAS | WEST BENGAL | 743101 | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹50.0 L+₹14,100 (0.28%)Rejected-Finance | L2 | Rejected-Finance OTHER THAN LOWEST | |
| 3 | L3₹53.3 L+₹3.4 L (6.82%)Rejected-Finance | L3 | Rejected-Finance OTHER THAN LOWEST | |
| 4 | L4₹56.6 L+₹6.7 L (13.4%)Rejected-Finance AT PO SHERPUR DANAPUR CANTT PATNA 801 503 | PATNA | PATNA | BIHAR | 801503 | L4 | Rejected-Finance OTHER THAN LOWEST | |
| 5 | L5₹56.7 L+₹6.8 L (13.6%)Rejected-Finance B 150 GROUND FLOOR BACK SIDE PANDAV NAGAR DELHI 110092 | DELHI | EAST DELHI | DELHI | 110092 | L5 | Rejected-Finance OTHER THAN LOWEST |
| Sl No | Description | Qty | Unit | PAPPU ROY CONSTRUCTION L5 | M/s KUMAR ENTERPRISES L6 | Jai Ambay Construction L2 | CP RAJ L4 | M/S SHEO KUMAR SINGH AND SONS L8 | M/S MODERN CONSTRUCTION L1 | M/S Harsh Traders L3 | RC GUPTA AND SONS L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete (unreinforced) in ground floors and paving n exc 15 cm thickness (below or above ground level) complete all as specified and directed. | 54.39 | Cum | 500 ₹27,195 Lowest | 532 ₹28,935.48 | 600 ₹32,634 | 550 ₹29,914.5 | 530 ₹28,826.7 | 600 ₹32,634 | 615 ₹33,449.85 | 540 ₹29,370.6 |
| 2.00 | Dismantling of floor, walls, hearth or wall tiles including cement mortar bedding but not backing and rubbish off permises complete all as specified and directed. | 106.5 | Sqm | 40 ₹4,260 | 39 ₹4,153.5 | 35 ₹3,727.5 Lowest | 48 ₹5,112 | 50 ₹5,325 | 35 ₹3,727.5 Lowest | 40 ₹4,260 | 42 ₹4,473 |
| 3.00 | Demolition of reinforcement cement concrete above the ground floors n exc 15 cm thickness (Reinforcement cut as required to facilitate demolition) such as in cooking platform, chajjas etc complete all as specified and directed. | 30.15 | Cum | 600 ₹18,090 | 605 ₹18,240.75 | 620 ₹18,693 | 580 ₹17,487 Lowest | 610 ₹18,391.5 | 620 ₹18,693 | 635 ₹19,145.25 | 610 ₹18,391.5 |
| 4.00 | M&L for 10mm thick Light shade vitrified ceramic tiles in floors, not exceeding 0.36 sqm over and including 15mm thick screed bed in cement mortor 1:6 set & jointed in neat cement slurry and pointed in white cement mixed with pigments to match the shade of tiles complete all as specified & directed. | 65 | Sqm | 1,500 ₹97,500 | 108 ₹7,020 | 1,370 ₹89,050 | 92 ₹5,980 Lowest | 1,530 ₹99,450 | 1,370 ₹89,050 | 1,395 ₹90,675 | 1,520 ₹98,800 |
| 5.00 | M&L for 10mm thick Light shade vitrified ceramic tiles, not exceeding 0.36 sqm as in vertical surfaces such as skirtings, dados etc, over and including 10 mm thick crendering in CM 1:4,set and jointed in neat cement slurry and pointed in white cement mixed with pigments to match the shade of tiles complete all as specified & directed. | 6.5 | Sqm | 1,600 ₹10,400 | 1,603 ₹10,419.5 | 1,350 ₹8,775 Lowest | 1,577 ₹10,250.5 | 1,630 ₹10,595 | 1,350 ₹8,775 Lowest | 1,395 ₹9,067.5 | 1,615 ₹10,497.5 |
| 6.00 | M&L for non skid ceramic coloured tiles 7 to 8 mm thick (square / rectangular) area of each tile exc 0.06 sqm and not exceeding 0.11 sqm in floors etc over and including 15mm thick screed bed in CM 1:6 set & jointed in neat cement slurry and pointed in white cement mixed with pigments to match the shade of tiles complete all as specified & directed. | 10 | Sqm | 1,200 ₹12,000 Lowest | 1,208 ₹12,080 | 1,300 ₹13,000 | 1,282 ₹12,820 | 1,230 ₹12,300 | 1,300 ₹13,000 | 1,355 ₹13,550 | 1,225 ₹12,250 |
| 7.00 | M&L 25 mm thick plain cement concrete 1:2:4, type B-0, using 12.50 mm graded stone aggregate as in floors including finishing the surface rough & even for receiving kota/tiles complete all as specified and directed. | 75 | Sqm | 185 ₹13,875 | 181 ₹13,575 | 200 ₹15,000 | 156 ₹11,700 Lowest | 190 ₹14,250 | 200 ₹15,000 | 230 ₹17,250 | 188 ₹14,100 |
| 8.00 | M&L for glazed ceramics coloured tiles of size 450x300x7mm thick on vertical surfaces such as skirting/dados/wall, etc over and including 10mm thick rendering in cement mortar (1:4) set and jointed in neat cement slurry and pointed in white cement mixed with pigments to match the shade of tiles complete all as specified and directed. | 25 | Sqm | 1,300 ₹32,500 | 1,279 ₹31,975 | 1,400 ₹35,000 | 1,267 ₹31,675 Lowest | 1,330 ₹33,250 | 1,400 ₹35,000 | 1,600 ₹40,000 | 1,290 ₹32,250 |
| 9.00 | Demolition of brick work built in cement mortar including all quions, arches, pillars, etc complete all as specified and directed. | 16.3 | Cum | 450 ₹7,335 | 441 ₹7,188.3 | 550 ₹8,965 | 425 ₹6,927.5 Lowest | 480 ₹7,824 | 550 ₹8,965 | 575 ₹9,372.5 | 448 ₹7,302.4 |
| 10.00 | M&L Brick work with sub class 'B' bricks straight or curved on plan exc 6m mean radius built in CM (1:6) complete all as specified and directed. | 22 | Cum | 6,500 ₹1,43,000 | 6,432 ₹1,41,504 | 6,500 ₹1,43,000 | 6,220 ₹1,36,840 Lowest | 6,520 ₹1,43,440 | 6,500 ₹1,43,000 | 7,500 ₹1,65,000 | 6,440 ₹1,41,680 |
Tender Value
₹48.4 L
EMD Value
₹96,840
Closing Date
17 Jul 2025, 6:00 pmClosed
GE DANAPUR
DANAPUR CANTT
SPECIAL REPAIR TO BLDG NO P33 AGE BRII AND P 34 AT FURNITURE YARD UNDER GE DANAPUR CANTT
2025_MES_716901_1
CA NO GE DNR T32 OF 2025-26
Open Tender
Civil Works
Item Rate
270 days
DANAPUR CANTT
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE DANAPUR
₹96,840
Yes
20 Aug 2025
26 Jun 2025
18 Jul 2025
26 Jun 2025
17 Jul 2025
11 Jul 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .