Tender Value
₹12.5 L
EMD Value
₹12,500
Closing Date
12 Oct 2023, 12:00 pmClosed
SE EDC-II RAEBARELI
SE EDC-II GORA BAZAR RAEBARELI
INCREASING CAPACITY OF DISTRIBUTION TRANSFORMERS
2023_MVVNL_847137_1
TENDER NO. 95/EDCR-II/2023-24
Open Tender
Electrical Works
Item Wise
30 days
EEEDD DALMAU RAEBARELI
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
A/C NO-081205500344,IFSC-ICIC0000812
₹12,500
Yes
17 Oct 2023
6 Oct 2023
12 Oct 2023
6 Oct 2023
12 Oct 2023
6 Oct 2023
Amount
INCREASING CAPACITY OF T/FS BY CHAIN RULE SYSTEM FROM 16 KVA TO 25 KVA 1Ø IN VILLAGE PURE MOHAN SINGH, PURE GAURI KAILI, KETAULI, RAUSI & PURE BABU (05 NOS) , FROM 16 KVA TO 25 KVA 3 Ø IN VILLAGE MATAULI PUR, NARHARPUR, PURE NATHU, PURE GADARIAN (04 NOS.), 25 KVA TO 63 KVA 1Ø IN VILLAGE PURE SOMVANSHI, KETAULI, GURUGANJ BAZAR, BINDAGANJ, BANIYAI, PURE KESHARI, PURE DAROGANI, PURE KCHHWAHAN, PURE MOHAN SINGH, PURE VIJAI, PURE BEECH DOMA PUR, RAUSI, RAUSI, MADUTPUR, GADARIAN, GADARIAN, MACHHIYA NARI, BHEERA, BELAHATA, HAZIYAPUR, SARISTAPUR, GHURWARA GANDHI VIDYALAY, KUTI GHURWARA, KAKRAHI GHURWARA, HEENGA MAU, LODIPUR, LODIPUR, BHEERA GOVINDPUR, BHEERA GOVINDPUR, PURE RANA BHEERA, PURE NARPATI SINGH, DEVANNA, PURE BAKKA, PURE KONHU, REFEEPUR RONARI, BHANAWA, PURE SURJU, GADOL, PURE BHAWAN, MUJJAFARPUR, AWASHERI, URE UMARAW, PURE MATIYARU, PURE HIRAU, MAUHARI, PURE SHIVE DUITT, PATTI HAR, PURE RAIKWARAN, PURE BINDA (PAKARA), PAKAR AMEERAN, SHAD BARA, KATGHAR, PURE VISHRAM, PURE SHIKARWAN, PURE MOHAN SINGH (55 NOS.), FROM 25 KVA TO 63 KVA 1Ø IN VILLAGE KHUSHIYA (ZAFARAPUR)- (01 NO.), FROM 25 KVA to 63 KVA 3 Ø IN VILLAGE LOOK CHANDPUR, NARHAR PUR, CHARMAPUR, THAKURDWARA, MATAULIPUR, EKDALA, PURE PASIN (07 NOS.), 16 KVA TO 63 KVA IN PURE GAUTAMAN (01 NOS.), 63 KVA TO 100 KVA IN VILLAGE BIJHHALAMAU (01 NO.) AND INSTALLATION OF NEW 25 KVA 3Ø T/F IN VILLAGE MATAULIPUR, PURE DHANU, PURE KESARI, PURE JHHANDA RAUSI (04 NOS.), (G. TOTAL T/F 77 NOS.) UNDER SUPPLY AREA OF EDD DALMAU AT
Safe loading & carriage including Loading-unloading & proper stacking at a Place of work site of following store materials from ESC Tripula to site of work.
25 KVA T/F
63 KVA T/F
100 KVA T/F
PCC Pole 8.5 Mtr.long
11 KV Disc Insulator with fitting
11 KV Pin Insulators with fitting
11 KV Cross Arms
M.S. "T" Off Channel
Top Channel
Earthing Set Complete
ASCR Weasal Conductor
S/S base Channel
Stay Set Complete
AB Cable 3 phase 95 Sq.mm.
Labor & Erection Charges:-
Work for Dismantling of existing 16 KVA T/F on Pole alongwith all acessories. And stacking a place with loading-uploading. As per estimate.
Work for Dismantling of existing 25 KVA T/F on Pole alongwith all acessories. And stacking a place with loading-uploading. As per estimate.
Work for Dismantling of existing 63 KVA T/F on Pole alongwith all acessories. And stacking a place with loading-uploading. As per estimate.
Digging of pits of PCC Pole 8.5 Mtr. Long from dump site to pit site then errection of PCC poles with including all related accessories as per RESPO Norms. As per estimate.
Grouting of PCC poles 8.5 Mtr. Long with grouting materials as per RESPO Norms. As per estimate.
Digging of pits of PCC Pole 8.5 Mtr. Long, then Making/Grouting of Double Pole Structure by PCC Pole with grouting Materials and fitting of all required accessories. for mounting of T/F on D/Pole as per RESPO norms. As per estimate.
Work for Mounting of 25 KVA Transformers on D/Pole alongwith fitting of all acessories, As per RESPO norms, As per estimate.
Work for Mounting of 63 KVA Transformers on D/Pole alongwith fitting of all acessories, As per RESPO norms, As per estimate.
Work for Mounting of 100 KVA Transformers on D/Pole alongwith fitting of all acessories, As per RESPO norms, As per estimate.
Earthing of 25 KVA T/F Body & Neutral of Transformers complete work as per RESSPO norms.
Earthing of 63 KVA T/F Body & Neutral of Transformers complete work as per RESSPO norms.
Earthing of 100 KVA T/F Body & Neutral of Transformers complete work as per RESSPO norms.
Digging of pits, fixing & grouting of stay rods as per RESSPO norms including with grouting materials. Then after fixing and nozzling of stay wire.
Earthing of S.T/PCC. Poles as per RESSPO Norms, AS Required.
Stringing, Laying & sagging of 11KV Line by ACSR Weasal conductor, as per RESSPO Norms.
Stringing, Laying & sagging of 11KV Line by AB Cable (3 phase 95 sq.mm , as per RESSPO Norms.
Fabrication of Line materials like "V" type X-arm/Top Channel/T off Channel/M.S. Channel/ M.S. Angle/Gaurding Angle and other misc work, as required,
Cutting of Tree Branches for cleaning of HT/LT Lines, as required.
Recd. back of 16 KVA T/F from work site to ESC Tripula, Raebareli alongwith safe loading unloading.
Recd. back of 25 KVA T/F from work site to ESC Tripula, Raebareli alongwith safe loading unloading.
Recd. back of 63 KVA T/F from work site to ESC Tripula, Raebareli alongwith safe loading unloading.
Recd. back of other Scrap Materials from work site to ESC Tripula, Raebareli after dismantling of T/Fs/Line from D/Pole/Four Pole Structure/ Plinth, alongwith loading unloading.
work for Installtion of Holding Clamp for PCC Pole, Material Provided by Contractor
work for Installtion of "F" Bracket, Material Provided by Contractor
work for Installtion of Clamp with Nuts & Bolt for for PCC Poles, Material Provided by Contractor
Work for Installation/fixing of Stone Pad (300X300X75mm), Material Provided by Contractor
Work for Installation/fixing of Danger Board with Clamp, Material Provided by Contractor
Work for Installation/fixing of "EYE" Hook for LT ABC Material Provided by Contractor
Work for Installation/fixing of Nuts & Bolt, Material Provided by Contractor
PRAGATI CONSTRUCTION
M/S Shukla Traders
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .