Loading…
Loading…
Tender Value
₹15.0 L
EMD Value
₹14,973
Closing Date
13 Jul 2026, 5:00 pm5d left
DPC Khordha
DPO Khordha
Construction of One no. Additional Classroom at Dadhibamandev Govt. High School, Pangarsingh, Begunia
2026_OPEPA_133018_7
01/CW/SS/2026-27
Open Tender
Civil Works - Buildings
180 days
DPO Khordha
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹14,973
Yes
29 Jun 2026
29 Jun 2026
14 Jul 2026
29 Jun 2026
13 Jul 2026
29 Jun 2026
29 Jun 2026 - 10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in hard soil in foundation in cluding initial lead and 1.5 m. initial lift including cost, conveyance taxes of all materials etc complete as per direction of the Engineer-in-charge | 54.3 | Cum | 282.89 | ₹15,360.93 |
| 2 | Sand Filling in foundation & plinth with approved river sand well watered and rammed including cost, conveyance taxes of all materials etc complete as per direction of the Engineer-in-charge | 65.82 | Cum | 1,207.83 | ₹79,499.37 |
| 3 | Plain cement concrete (1:3:6) using 40mm BHG metal (crusher broken) well rammed including cost, conveyance taxes of all materials etc complete as per direction of the Engineer-in-charge | 6.99 | Cum | 6,278.12 | ₹43,884.06 |
| 4 | Plain cement concrete (1:4:8) using 40mm BHG metal (crusher broken) well rammed including cost, conveyance taxes of all materials etc complete as per direction of the Engineer-in-charge | 8.26 | Cum | 5,903.3 | ₹48,761.26 |
| 5 | F.A brick work in cement mortar (1:6) using F.A. bricks (25cm x12cm x8cm)of approved quality including cost, conveyance & royalty of all materials etc complete as per direction of the Engineer-in-charge. a) In foundation & plinth | 7.66 | Cum | 6,096.87 | ₹46,702.02 |
| 6 | B) In super structure | 17.54 | Cum | 6,135.2 | ₹1,07,611.41 |
| 7 | Reinforced Cement concrete M20 using 20 mm and down size C.B. chips for R.C.C. Work including hoisting and laying etc completed as per direction of the Engineer-in-charge (a)Column footing(b)Plinth Beam (c)Lintel Band(d)Column & beam (e)Chajja(f)Roof Slab | 38.1 | Cum | 6,316.49 | ₹2,40,658.27 |
| 8 | (g) Column in FF | 0.36 | Cum | 6,441.32 | ₹2,318.88 |
| 9 | Rigid smooth centring for RCC works including false work and dismantling then after casting including floor cost of all materials complete in ground(a)Centring for foundation and plinth band, footing bases of column concrete etc. (a)In foundation & plinth | 74.93 | Sqm | 249.83 | ₹18,719.76 |
| 10 | (b)Lintel Band | 12.3 | Sqm | 577.75 | ₹7,106.33 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.41 MB
BOQ_597974.xls
BOQ • 0.33 MB
DTCNDADHIBAMANDEV.pdf
Tender Documents • 2.37 MB
Download all tender documents and submit your bid