Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.5 L+₹1,370.73 (0.55%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.5 L+₹3,368.08 (1.34%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹2.6 L+₹8,851.01 (3.52%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹2.7 L+₹21,970.88 (8.75%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.9 L
EMD Value
₹7,840
Closing Date
7 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW DIVISION REASI
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI, BLOCK NO. 2, ROOM NO. 205
Const. of Play Ground at wno-5 Pyt.Lower Talwara Block Pouni Under Scheme Tribal Plan for the year 2026-27.
2026_RDPR_318552_29
e-NIT No. 76 of REW REASl of 2026-27
Open Tender
Civil Works
Percentage
90 days
Reasi Pouni REASl
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
MH 0515
₹7,840
14 Aug 2026
31 Jul 2026
8 Aug 2026
31 Jul 2026
7 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : | 537.5 | Cum | 91.75 | ₹49,315.63 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 51.84 | Cum | 5,733.6 | ₹2,97,229.82 |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 72 | Sqm | 286.35 | ₹20,617.2 |
| 4 | Construction of CIB (Include concrete/Brick pedestal of size 3' x 2'. Platering ,painting all complete job as per direction of Engineer-in-charge | 1 | No. | 3,000 | ₹3,000 |
| 5Carriage of material from source to site of work by MT/AT including loading, unloading and stacking complete. | |||||
| 5.01 | Cement 5 KM by MT . | 14.26 | MT | 178.43 | ₹2,544.41 |
| 5.02 | Sand 6.0KM by MT. | 29.16 | Cum | 216.4 | ₹6,310.22 |
| 5.03 | Aggregate 6.0KM by MT. | 58.32 | Cum | 216.4 | ₹12,620.45 |
stage.html
html • 0.03 MB
finance_1052123.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
BOQ_1052123.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .