Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹5.3 CrSame as L1Accepted-Finance | ₹5.3 CrSame as L1 | L2 | Accepted-Finance Lottery winner |
| 2 | L1₹5.3 CrRejected-Finance | ₹5.3 Cr | L1 | Rejected-Finance invalid licence submitted |
| 3 | L2₹5.3 CrSame as L1Rejected-Finance | ₹5.3 CrSame as L1 | L2 | Rejected-Finance lost in lottery |
| 4 | L2₹5.3 CrSame as L1Rejected-Finance | ₹5.3 CrSame as L1 | L2 | Rejected-Finance lost in lottery |
| 5 | L2₹5.3 CrSame as L1Rejected-Finance | ₹5.3 CrSame as L1 | L2 | Rejected-Finance lost in lottery |
Tender Value
₹5.3 Cr
EMD Value
₹5.3 L
Closing Date
29 May 2026, 5:30 pmClosed
Chief Construction Engineer
Office of the CCE, LSP, Laltikra, Balangir
Construction of link road from LSIP RR Colony to Kapilbahal Chhak (from Ch.2/160 km to 3/120 km) of Kumiapali, Balangir.
2026_CEEBO_129219_2
03/2026-27 of CCE LSP Balangir
Open Tender
Civil Works - Roads
Percentage
213 days
Kapilbahal
Tender Cost, EMD, PAN, Valid RC, Valid GSTIN, Affidavit, No Relation Certificate, undertakings and any other document as per DTCN
3 documents required · 3 mandatory
₹10,000
₹5.3 L
Yes
Office of the CCE, LSP, Laltikra, Balangir
9 Jul 2026
15 May 2026
30 May 2026
15 May 2026
29 May 2026
15 May 2026
15 May 2026 - 22 May 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 30m outside the perifhery of the area including cost & conveyance of all materials labour and labour cess etc.complete as per specification and direction of Engineer-in-charge and Clause 201 of MORD. | 1,920 | sqm | 2.8 | ₹5,376 |
| 2 | Dismetalling of brick and stone masonry in lime or cement mortar above 3 mtr height stacking serviciable and unserviceable materials separately including cost & conveyance of all materials, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 25.31 | Cum | 1,426.8 | ₹36,112.31 |
| 3 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads. Transporting to site by mechanical means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & Clause 305 of MORTH Specifications for Road & Bridge works (4th Revision) including cost & conveyance of all materials, royalty of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 4,582.29 | cum | 198.5 | ₹9,09,584.57 |
| 4 | Providing granular sub-base (Crushable Stone Screening) used in berm in layers not eceeding 22.5 cm well watered and compaction to the required density in O.M.C with Vibrater roller including cost & conveyance of all materials, royalty of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. (Measurement to be taken on level section). | 367.2 | cum | 788.1 | ₹2,89,390.32 |
| 5 | Construction of granular sub-base by providing close graded granular sub base Grading III material as per table 401-1, spreading in uniform layer with moter grader on prepared surface, mixing by mix in place method with rotavator at OMC ,and compacting with vibratory roller to achieve the desired density complete as per clause 401 of MoSRT&H Specification for Road & Bridge works (4 th Revision) including cost & conveyance of all materials, royalty of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. (Mesurement to be taken on level section) | 793.15 | cum | 2,174.3 | ₹17,24,546.05 |
| 6 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including pre mixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Clause 406 of MoSRT&H Specifications for Road & Bridge works (4th Revision) including cost & conveyance of all materials, royalty of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 550.8 | cum | 2,480.8 | ₹13,66,424.64 |
| 7 | Providing applying primer coat with bitumen emulsion (SS-I) over prepared surface of granular base including clearing road surface and spraying primer at the rate of 0.6 kg / sqm including cost & conveyance of all materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 3,672 | sqm | 40.3 | ₹1,47,981.6 |
| 8 | Providing and applying tack coat with Bitumen using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared surfaces cleaned including cost & conveyance of all materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 3,672 | sqm | 13.4 | ₹49,204.8 |
| 9 | Providing and laying Bituminous Macadam with hot mix plant using crushed aggregates of speified grading premixed with bitominous binder of 60/70 penetration grade of bitomen, transported to site , laid over a previously prepared surface with a hydrostatic paver finisher with sensor control to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tendem roller to achieve the desired compaction as per clause 504 of MoSRT&H specification for road & Bridge works including cost & conveyance of all materials, royalty of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 183.6 | cum | 7,720.3 | ₹14,17,447.08 |
| 10 | Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH spefn. clause No. 508 complete including cost & conveyance of all materials, royalty of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 91.8 | cum | 10,151.3 | ₹9,31,889.34 |
stage.html
html • 0.16 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
LinkRoadDTCN2.pdf
Tender Documents • 2.23 MB
BOQ_591029.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .