Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 11 B EAST VEERAPANDIYAN STREET VIRUDHACHALAM 606001 | VIRUDHACHALAM | CUDDALORE | TAMIL NADU | 606001 | Accepted-Technical BQR satisfied |
| 2 | Not Admitted-Fee/PreQual/Technical 520C MAIN ROAD WARD NO 12 METTU STREET ELAMBALUR PERAMBALUR | PERAMBALUR | PERAMBALUR | TAMIL NADU | 621220 | Not Admitted-Fee/PreQual/Technical Others-WITHDRAWN FROM THE TENDER |
Tender Value
₹5.9 L
EMD Value
₹5,000
Closing Date
14 Sept 2026, 2:00 pmClosed
Superintending Engineer/ PEDC / Perambalur
Superintending Engineer/ PEDC / Perambalur
Construction of Security room building for Central stores at SE PEDC PBLR office premises
2026_EB_699448_1
Civil-E-04/2026-27
Open Tender
Civil Works
Works
60 days
Perambalur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,000
24 Sept 2026
31 Aug 2026
15 Sept 2026
31 Aug 2026
14 Sept 2026
31 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing the jungle as instructed by the Engineer incharge for the following items including cost of labour, lead, lift, T&Ps etc. complete.. | 500 | Sqm | 1.25 | ₹625 |
| 2 | Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m. for foundation as instructed by the Engineer incharge for the following items including cost of labour , etc.complete.. | - | - | 1.25 | - |
| 2.1 | Hard stiff clay,stiff black cotton,hard red earth, shales,murram,gravel,stony earth and earth mixed with small size boulders. | 7.4 | Cum | 1.25 | ₹9.25 |
| 2.2 | Medium rock and dense medium rock not requiring blasting | 7.4 | Cum | 1.25 | ₹9.25 |
| 3 | Supplying and filling the basement and foundation, with M.Sand, watering ,consolidation ,etc.,as instructed by the Engineer incharge. including cost of material, labour, lead, lift etc., complete | 6.5 | Cum | 1.25 | ₹8.13 |
| 4 | PCC 1:4:8 using 40m HB stone for foundation, flooring, etc.,in the following levels as instructed by the Engineer incharge including cost of all materials labour, lead lift , etc., complete. | 6 | Cum | 1.25 | ₹7.5 |
| 5 | RCC M20 (1:1.5:3)using 12-20mm HBG stone with form work for foundation, columns,etc., in the following levels as instructed by the Engineer incharge including cost of all materials, labour ,lead,lift etc complete but excluding cost of steel reinforcement. | 2.4 | Cum | 1.25 | ₹3 |
| 6 | RCC M20 using 12-20mm HBG stone using minimum cement content of 360 KG for Grade beam and Plinth beam with form work for foundation including cost of all materials labour ,lead, lift etc complete but excluding cost of steel reinforcement-1m3. | 1.3 | Cum | 1.25 | ₹1.63 |
| 7 | Brick works in Cement mortar 1 : 5 using Country bricks size 8 1/4" x 4 1/4" x 2 1/4" including cost of all materials, labour lead, lift, etc., complete. | 2.16 | Cum | 1.25 | ₹2.7 |
| 8 | Damp proof course with CM 1:3, 20mm thick at basement levelusing water proof compoundas as instructed by the Engineer in charge including cost of all materials lead lift etc., complete. | 3.2 | Sqm | 1.25 | ₹4 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
spec04.pdf
Tender Documents • 0.88 MB
BOQ_840837.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .