Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.3 LAdmitted-Finance IND AREA ROAD TAHLIWALA TEH HAROLI DISTT UNA H P | TAHLIWALA | UNA | HIMACHAL PRADESH | +4.90% | ₹6.3 L | L1 | Admitted-Finance |
| 2 | L2₹6.4 LAdmitted-Finance BILASPUR | +5.90% | ₹6.4 L | L2 | Admitted-Finance |
| 3 | L3₹6.5 LAdmitted-Finance BILASPUR | +8.00% | ₹6.5 L | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹6,032
Closing Date
2 Feb 2026, 9:00 amClosed
SR. EXECUTIVE ENGINEER ED HPSEBL RAKKAR UNA
SR. EXECUTIVE ENGINEER ED HPSEBL RAKKAR UNA
Tender for prov 11kV HT Line interlinking of existing 11KV Feeder with 11KV Tahliwal Feeder 11kV HT Line with AB Cable size 3 95 70 mm2., from 11/0.4kv,63kva Sub-St at Vill Bhatoli, 3Ph L.T.Line from exit 25KVA Sub-St esd Mehatpur
2026_HPSEB_124907_2
BID NO- UED/205/2025-26
Open Tender
Electrical Works
90 days
AREA OF ESD MEHATPUR
AS PER SBD
5 documents required · 5 mandatory
₹590
₹6,032
5 Feb 2026
27 Jan 2026
2 Feb 2026
27 Jan 2026
2 Feb 2026
27 Jan 2026
A) Erection Part
ERECTION PART 11kV HT Line interlinking of existing 11KV Feeder with 11KV Tahliwal Feeder TS. No-170/2025-26 wbs no- 32100261-001-una-HT-145
Erection of S.T Double Pole str. 11 Mtr. Long :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit ,G.O. Switch, Alluminium Paint and ramming & painting of poles complete in all respect.
Erection of S.T Single Pole Str. 11 Mtr. Long :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit , Alluminium Paint and ramming & painting of poles complete in all respect.
Stringing and sagging conductor:- Laying of conductor stringing and sagging, binding with insulator complete in all respect.
Laying of G.I Wire, Stringing, Sagging and binding complete in all respect.
Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect.
Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.
Fixing jumper complete in all respect.
Mannual carriage from road to site ,transportation charges from central store to site and loading- unloading in all respect (IN ALL HEAD) average distance at site
ERECTION PART 11kV HT Line with AB Cable size 3 x 95 + 70 mm^2., from 11/0.4kv,63kva Sub-Station at Village Bhatoli TS. No-197/2025-26 wbs no- 32100261-001-una-HT-150
Erection of PCC Single Pole Str. 9 Mtr. Long :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit , and ramming & painting of poles complete in all respect.
Laying of AB Cable,bInstallation of Suspension and Tension assembly etc.Sagging of AB Cable ,Heat Shrinkable Cable,Jointing/Termination/T joint (1 No. Straight Through+2 No. Cable termination & 1 No T Jointing
Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect.
Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.
Mannual carriage from road to site ,transportation charges from central store to site and loading- unloading in all respect (IN ALL HEAD) average distance at site
ERECTION PART L.T.Line 3Ph LT Line from existing 11/0.4KV-25KVA Sub-Station at village Chattara replacement of lengthy services TS NO-267/2025-26 WBS NO-32100261-001-UNA-LT-818
Erection of LT line. Digging of pit, erection of PCC pole 8 mtr long, erection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect.
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Erection of Earthing Set.:- Digging of Pit, Fixing of GI Wire To The Earth System and Filling of Pit etc.complete in all respect.
Laying of Cable :- Laying of Cable, sagging and Installation of Suspansion and Tension assembly, Sagging of AB Cable and Kits Cable Jointing etc complete in all respect.,
Laying of conductor :- Laying of conductor, striging, sagging and biding with insulator with 7/2.50mm/7/3.15 mm Conductor aug. of New 3-Ph. Re-cond, 7/3.15 mm for 1-Ph. LT complete in all respect.,
Laying of G.I Wire, Stringing, Sagging and binding complete in all respect.
Mannual carriage from road to site ,transportation charges from central store to site and loading- unloading in all respect (IN ALL HEAD) average distance at site
ERECTION PART L.T.Line 1Ph LT Line from existing 11/0.4KV-100KVA Sub-Station at village Mehatpur ward NO-1 Opp. RTO Barrier TS NO-67/2025-26 WBS NO-32100261-001-UNA-LT-751
Erection of LT line. Digging of pit, erection of ST pole 8 mtr long, erection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect.
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Erection of Earthing Set.:- Digging of Pit, Fixing of GI Wire To The Earth System and Filling of Pit etc.complete in all respect.
Laying of conductor :- Laying of conductor, striging, sagging and biding with insulator with 7/2.50mm/7/3.15 mm Conductor aug. of New 3-Ph. Re-cond, 7/3.15 mm for 1-Ph. LT complete in all respect.,
Laying of G.I Wire, Stringing, Sagging and binding complete in all respect.
Mannual carriage from road to site ,transportation charges from central store to site and loading- unloading in all respect (IN ALL HEAD) average distance at site
SUPPLY PART. 11kV HT Line interlinking of existing 11KV Feeder with 11KV Tahliwal Feeder TS. No-170/2025-26 wbs no- 32100261-001-una-HT-145
Prov. Steel Tublar 11 mtr long with cap. (Provided By HPSEBL)
Prov. RCC Muff
Prov.AAAC 7/4.26 mm Conductor (Provided By HPSEBL)
Prov.G.I.Wire No. 8 SWG in mtr. (Provided By HPSEBL)
Prov. Cross Arm (Channel Iron (100x50x6) Length 1270 mm
Prov. Angle Iron (50x50x6mm) Leggth 750 mmx2
Prov. Pole Top Bracket (MSCI) (100X50X6 mm) Length 100 mm
Prov.X-Bracing Set.MS Angle Iron (50x50x6 mm) Length 2125 mm x2 Nos.
Prov.X-Arm (Horizontal) MS-Channel Iron (100x50x6mm) Length 2340 mm x2 Nos. ( ∆) Formation.
Prov. MS Channel Iron (75x40x6 mm) Length 2800 mm
MS Channel Iron (75x40x6 mm) Length 2800 mm for holding the 11kv G.O.Switch handle
G.O. Switch Handle Supporting (Channle Iron 75x40x6 mm) Length 460mm
Prov.GO AB Switch Unit (11kV, 400A, 25 KA )
Prov.D.O Fuse Unit
Prov.Nuts and Bolts of Various Sizes
Prov.MS Half Clamp (Provided By HPSEBL)
Prov.MS Full Clamp
Prov.Barbed Wire
Prov.Eye/Earth Hook
Prov.11kv Pin Insulator with pin complete in all respect
Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) (Provided By HPSEBL)
Prov.11kv Stay Set
Prov. Stay Wire (7/3.15 mm) (10 kg. per Stay Set)
Prov.11kv Earthing set complete in all respect.
Prov.Red Oxide (1.5 Ltr. Per Pole)
Prov.Alluminum Paint
Prov.11kv Danger Plate (250x200x1.6 mm)
SUPPLY PART. 11kV HT Line with AB Cable size 3 x 95 + 70 mm^2., from 11/0.4kv,63kva Sub-Station at Village Bhatoli TS. No-197/2025-26 wbs no- 32100261-001-una-HT-150
Prov. PCC 9 mtr long .
Providing LT ABC 3 x 95 + 70 mm^2.
Prov. Stay Set Complete (i/c stay clamp)
Prov. Stay Wire (7/4 mm) (9.0 kg Per Stay Set)
Prov. X-Arm (Horizontal) - MS Channel Iron: 100X50x6, Length [600 mm]
Prov. Knee Bracing set 1100 mm (65X65x6) mm
Prov. Half Clamp for Cross Arm
Prov. Full Clamp (Knee Bracing)
Prov. Anchoring Assembly for HT
Prov. Suspension Assembly for HT +Disk Insulator
Prov. Facade Hooks for HT
Prov. Heat Shrinkable Straight Through Jointing Kit
Prov. Cable Termination kit
Prov. T-Jointing kit
Prov. HT Earthing set complete (preferbly coil earthing)
Prov. Nut and Bolts
Prov.Barbed Wire
Prov. Danger Plate
Supply Part L.T.Line 3Ph LT Line from existing 11/0.4KV-25KVA Sub-Station at village Chattara replacement of lengthy services TS NO-267/2025-26 WBS NO-32100261-001-UNA-LT-818
PCC Pole 8 mtr. Long. Provided by HPSEBL
AAAC 7/3.15 mm2 Conductor Provided by HPSEBL
AB Cable 4x70+1x70+1x16 MM2
Insulation Piercing Connector (IPC) having tap upto 50 sq mm
Anchoring Assembly
Suspension Assembly
Facade Hooks
LT Distribution Boxes (3 Phase- 4 bays) with spring loaded connection with stainless steel strap roll 20mm X.7mmx5Mtr+ Stainless steel Buckles 1 nos for each box.
LT Cable 3½ C 35 mm² for Connection to Dist Box(5 mtr L/S)
GI Wire Provided by HPSEBL
Channel Iron (75x40x5) [Length-1.50 Mtr + 0.2 Mtr]
Full Clamp
Half Clamp for Cross Arm
Nut and Bolts
Shackle Insulator with D-Iron
Earth Hook/Eye Hook Bolt
Stay Set Complete (i/c stay clamp) Provided by HPSEBL
Stay Wire (7/3.15mm) (6.0 kg per stay set) Provided by HPSEBL
Earthing Set Complete (preferbly coil earthing)
Supply Part LL.T.Line 1Ph LT Line from existing 11/0.4KV-100KVA Sub-Station at village Mehatpur ward NO-1 Opp. RTO Barrier TS NO-67/2025-26 WBS NO-32100261-001-UNA-LT-751
Steel Pole 8 mtr. Long. Provided by HPSEBL
AAAC 7/3.15 mm2 Conductor Provided by HPSEBL
GI Wire Provided by HPSEBL
RCC Muff
Channel Iron (75x40x5) [Length-1.50 Mtr + 0.2 Mtr]
Full Clamp
Half Clamp for Cross Arm
Nut and Bolts
Shackle Insulator with D-Iron
Earth Hook/Eye Hook Bolt
Stay Set Complete (i/c stay clamp) Provided by HPSEBL
Stay Wire (7/3.15mm) (6.0 kg per stay set) Provided by HPSEBL
Earthing Set Complete (preferbly coil earthing)
Aluminium Paint
Red Oxide
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.11 MB
Tendernotice_2.pdf
PDF • 0.53 MB
BOQ_187048.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid