Loading…
Loading…
Tender Value
₹9.9 Cr
EMD Value
₹19.8 L
Closing Date
15 Jul 2026, 12:00 pm
Similar tender results from the same govt authority in the past 3 years.
Open tender for Provision of Yard Drainage in connection with Yard Improvement along with other ancillary work at Andal under the jurisdiction of DEN/4/Asansol.
O-AC-T-88-26-27
O-AC-T-88-26-27
Open
12 Months
Paschim Bardhaman, West Bengal
₹0
₹19.8 L
19 Jun 2026
19 Jun 2026
1 Jul 2026
Item- 2 Items of Schedule-B
S No. Item Description of Item Unit Qty Rate Amount
2.0 EARTH WORK
2.1S General
Earth work in excavation by mechanical means
(Hydraulic excavator)/manual means over areas
(exceeding 30 cm in depth, 1.5 m in width as
well as 10 sqm on plan) including getting out
and disposal of excavated earth lead upto 50 m
and for all lift, as directed by Engineer-in-charge.
2.27 Supplying and filling in plinth with sand under cum 2600 2123.75 5521750
2 floors, including watering, ramming,
consolidating and dressing complete.
Surface dressing of the ground including
removing vegetation and in-equalities not
exceeding 15 cm deep and disposal of rubbish,
lead up to 50 m and lift up to 1.5 m.
4.0 CONCRETE WORK
4.1S CEMENT CONCRETE (CAST IN SITU)
Providing and laying in position cement concrete
4.1 of specified grade excluding the cost of centering
and shuttering - All work up to plinth level :
derived from natural sources : 6 graded stone
aggregate 20 mm nominal size derived from
natural sources)
5.0 REINFORCEMENT CEMENT CONCRETE
5.1S CAST IN SITU
Providing and laying in position specified grade
of reinforced cement concrete, excluding the
cost of centering, shuttering, finishing and
reinforcement - All work up to plinth level :
derived from natural sources : 3 graded stone
aggregate 20 mm nominal size derived from
natural sources)
5.9S FORM WORK
Centering and shuttering including strutting,
propping etc. and removal of form for
5.9.1 Foundations, footings, bases of columns, etc. for Sqm 4100 392.15 1607815
5.9.2 Walls (any thickness) including attached Sqm 4495 842.5 3787037.5
7 pilasters, buttresses, plinth and string courses
5.12S PRE-CAST RCC
5.12 Providing, hoisting and fixing above plinth level cum 360 10585.9 3810924
up to floor five level precast reinforced cement
concrete work in string courses, bands, copings,
bed plates, anchor blocks, plain window sills and
the like, including the cost of required centering,
shuttering but , excluding cost of reinforcement
with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-
III) derived from natural sources : 3 graded stone
aggregate 20 mm nominal size derived from
natural sources).
5.22S STEEL REINFORCEMENT
ASANSOL DIVISION-ENGINEERING/EASTERN RLY
Steel reinforcement for R.C.C. work including
straightening, cutting, bending, placing in
position and binding all complete upto plinth
5.22.6 Thermo-Mechanically Treated bars of grade Fe- Kg 343200 107.85 37014120
6.0 MASONRY WORK
6.1S General
Brick work with common burnt clay F.P.S. (non
6.1 modular) bricks of class designation 7.5 in
foundation and plinth in:
13.0 FINISHING
CEMENT PLASTER WITH A FLOATING COAT OF
12 mm cement plaster finished with a floating
coat of neat cement of mix :
15 mm cement plaster on rough side of single or
13.8 half brick wall finished with a floating coat of
neat cement of mix :
16.0 ROAD WORK
Dry brick pitching half brick thick in drains
16.12 including supply of bricks and preparing the
surface complete :
16.12.1 With common burnt clay F.P.S. (non modular) Sqm 8200 644.05 5281210
bricks of class designation 7.5
Item Breakup - A-Overall percentage Above/Below/At par on assessed cost of schedule-A ( NS Items)
Providing, hoisting and fixing precast reinforced cum cement concrete drain of specified shape and size as decided by Engineer - in -charge, including the cost of required centering, shuttering but, excluding the cost of reinforcement, weep holes;. with 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources) ASANSOL DIVISION-ENGINEERING/EASTERN RLY Total 30154926.00 Schedule B-Overall percentage Above/Below/At par on assessed cost of schedule-B (Items of CPWD
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ANNEXURE-X_A_.pdf
ATTACHMENT
GCC-2022_3.pdf
ATTACHMENT
Tenderdocuments.pdf
ATTACHMENT
AnnexuresforCommercialcompliances.pdf Annexures for Commercial Compliance
ATTACHMENT
CheckList.pdf
ATTACHMENT
AdvCSGCC2022.pdf
ATTACHMENT
Annexure-X_1.pdf
ATTACHMENT
Annexuresoftechnicalcompliancess.pdf
ATTACHMENT
JPOTelecomcircular9of2023_1.pdf
ATTACHMENT
Advancecorrectionslip11GCC2022.pdf
ATTACHMENT
Policevarificationletter..pdf
ATTACHMENT
AnnexuresforCommercialcompliances.pdf
ATTACHMENT
Download all tender documents and submit your bid