| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.9 LAccepted-Finance | ₹19.9 L | L1 | Accepted-Finance less |
| 2 | L2₹19.9 LRejected-Finance | ₹19.9 L | L2 | Rejected-Finance Second less |
| Sl No | Description | Qty | Unit | K.Moorthy L1 | KUMAR TV L2 |
|---|---|---|---|---|---|
| 1.00Strengthening of Road From Thuraiyur Colony Pallipattarai Road Km 0/0 - 0/330 | |||||
| 2.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 297 | Sqm | 6 ₹1,782 | 6.2 ₹1,841 |
| 3.00 | Picking 5 Cm to 10 cm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete (1/3) | 412.5 | Sqm | 23 ₹9,488 | 23 ₹9,488 |
| 4.00 | Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A. | 44.55 | Cum | 140 ₹6,237 | 140 ₹6,237 |
| 5.00 | Collection and supply of Carted Earth from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 151.8 | Cum | 145 ₹22,011 | 145.82 ₹22,135 |
| 6.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 | 165 | Cum | 2,862 ₹4.7 L | 2,862.19 ₹4.7 L |
| 7.00 | Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges rentals for machinery, fuel and all other incidental charges etc, completed as per clause of MORTH Rev-5 | 185.63 | Cum | 2,897 ₹5.4 L | 2,897.04 ₹5.4 L |
| 8.00 | Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance | 1,237.5 | Sqm | 86 ₹1.1 L | 86.44 ₹1.1 L |
| 9.00 | Applying tack coat over WMM surface using 2.50 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions | 1,237.5 | Sqm | 20.21 ₹25,010 | 20.21 ₹25,010 |
| 10.00 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, | 37.13 | Cum | 11,799.55 ₹4.4 L | 11,799.55 ₹4.4 L |
Tender Value
Refer Docs
EMD Value
₹20,150
Closing Date
20 Feb 2026, 4:00 pmClosed
The President
The President Panchayat Office Thuraiyur
Strengthening the Road fromThuraiyur Colony to Pallipattarai
2026_RDTN_662143_1
A2/4755/2025
Open Tender
Civil Works
Panchayat Office Thuraiyur
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹20,150
Yes
20 Feb 2026
20 Feb 2026
20 Feb 2026
20 Feb 2026
20 Feb 2026
20 Feb 2026
Strengthening of Road From Thuraiyur Colony Pallipattarai Road Km 0/0 - 0/330
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking 5 Cm to 10 cm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete (1/3)
Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A.
Collection and supply of Carted Earth from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401
Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges rentals for machinery, fuel and all other incidental charges etc, completed as per clause of MORTH Rev-5
Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance
Applying tack coat over WMM surface using 2.50 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site,
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous SurfaceProviding and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 100mm,
60cm equilateral Triangle Sign Board
Provision for Hectometer stone
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.94 MB
BOQ_794896.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid