| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC | ₹7.9 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical - |
| Sl No | Description | Qty | Unit | JAYABALAN S L2 | NSSCWSOLUTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B | 523 | M³ | 200 ₹1.0 L | 184.75 ₹96,624.25 |
| 1.10 | Earthen dam ss 20A WRD SOR | 153 | M³ | 150 ₹22,950 | 140.3 ₹21,465.90 |
| 2.00 | Cement concrete 1:4:8mix (One cement, four sand and Eight aggregate) using 40mm gauge hard broken stone jelly for foundation and flooring including dewatering if found necessary and laid in layers of not more than 15cm thick and compacting including all charges etc., complete as per standard specification. | 3 | M³ | 6,000 ₹18,000 | 5,269 ₹15,807 |
| 3.00 | Supplying and erecting centering for sides and soffits including supports and strutting up to 3.29mm height for plane surfaces in all floors with cross bracings using mild steel sheets of size 30cm x 55cm and 10 gauge stiffened welded with mild steel sheets of size 25mm x 25mm x 3mm for boarding and laid over silver oak (country wood). Joists of size 10cm x 6.5 cm dia spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre etc complete complying with standard specification | 80 | M² | 500 ₹40,000 | 459.6 ₹36,768 |
| 4.00 | Cement concrete 1:2:4 mix (One cement, Two sand and Four aggregate) using 20mm gauge hard broken stone jelly for foundation and flooring including dewatering if found necessary and laid in layers of not more than 15cm thick and compacting including all charges etc., complete as per standard specification. | 15 | M³ | 7,000 ₹1.1 L | 6,642.3 ₹99,634.50 |
| 5.00 | Finishing the top of flooring with granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete. | 6 | M² | 200 ₹1,200 | 162.65 ₹975.90 |
| 6.00 | Supplying and fixing RCC Pre cast slab in RCC 1:2:4 mix including cost of reinforcement grill but including moduling, finishing watering curing and fixing in position etc., Complete as per std., Specifications., | 18 | M² | 1,350 ₹24,300 | 1,289.75 ₹23,215.50 |
| 7.00 | Supply of RCC NON PRESSURE SPUN PIPE(NP3 - 900 mm) AS PER IS 458/2003 with socket and spigot ends manufactured with sulphate resistant cement with 12 mm HI -alumina lining provided for rubber ring joints. | 135 | Rm | 3,300 ₹4.5 L | 3,251.5 ₹4.4 L |
| 8.00 | Lowering R C C pipes and specials in the,trenches and laying to proper grade and,alignment and as directed by the Deportmental,Officers. | 150 | Rm | 325 ₹48,750 | 304.3 ₹45,645 |
| 9.00 | Refilling the excavated earth for pipe line trench including all labour charges etc., complete | 349 | M³ | 50 ₹17,450 | 42.75 ₹14,919.75 |
Tender Value
₹11 L
EMD Value
₹22,000
Closing Date
28 Aug 2025, 3:00 pmClosed
Executive officer
Annur Town Panchayat
Supply and Laying of 900 mm R C C Rain Water Hume Pipe at Ward no 15 kaliyapuram in Annur Town panchyat.
2025_DTP_597929_1
321/2025/A1
Open Tender
Civil Works
180 days
Annur Town Panchayat
as per norms
1 document required · 1 mandatory
₹0
₹22,000
17 Jun 2026
27 Aug 2025
28 Aug 2025
27 Aug 2025
28 Aug 2025
27 Aug 2025
27 Aug 2025 - 28 Aug 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid