Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹31.3 LAdmitted-Finance | +4.44% | ₹31.3 L | L1 | Admitted-Finance |
| 2 | L2₹37.5 LAdmitted-Finance | +25.00% | ₹37.5 L | L2 | Admitted-Finance |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
4 Aug 2026, 11:00 amClosed
EXECUTIVE ENGINEER BDA BIKANER
BDA CAMPUS BIKANER
E-BID-10-2026-27 WORK NO 05
2026_UITBK_579445_5
E-BID-10-2026-27
Open Tender
Civil Works
Percentage
90 days
BDA BIKANER
E-BID-10-2026-27 WORK NO 05
2 documents required · 2 mandatory
₹1,000
SECRETARY BDA BIKANER
₹60,000
Yes
18 Aug 2026
30 Jul 2026
4 Aug 2026
30 Jul 2026
4 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. 1: 4: 8 or leaner mix. | 18 | cum | 393 | ₹7,074 |
| 2 | Demolishing brick work manually/ by mechanical means
including stacking of serviceable material and disposal of
unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar. | 70 | cum | 538 | ₹37,660 |
| 3 | Dismantling tile work in floors and roofs laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meter lead: | 100 | sqm | 20 | ₹2,000 |
| 4 | Dismantling stone slab/ terrazo chip flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meters lead. | 30 | sqm | 80 | ₹2,400 |
| 5 | Earth work in excavation by mechanical means (Hydraulic
Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m,including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 100 | CUM | 178 | ₹17,800 |
| 6 | carriage of Materials by mechanical transport including loading,unloading and stacking : EARTH upto 5 km | 100 | CUM | 125 | ₹12,500 |
| 7 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 30 | CUM | 3,302 | ₹99,060 |
| 8 | Brick masonry with F.P.S. bricks of class designation 100 in foundation and plinth with bricks Cement mortar 1 : 6 (1 cement : 6 coarse sand) | 40 | CUM | 4,426 | ₹1,77,040 |
| 9 | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : Cement mortar 1 : 6 (1 cement : 6 coarse sand) | 70 | CUM | 5,250 | ₹3,67,500 |
| 10 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M20 grade Nominal Mix 1: 1.5: 3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). | 16 | cum | 4,915 | ₹78,640 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.22 MB
BOQ_1029730.xls
BOQ • 0.35 MB
SC05.pdf
Tender Documents • 6.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].