| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹1.2 Cr+₹35,498 (0.29%)Rejected-AOC | ₹1.2 Cr+₹35,498 (0.29%) | L2 | Rejected-AOC L2 bidder |
| Sl No | Description | Qty | Unit | V.Anbukarasu H2 | AKSHYA SIRPAKALAI H1 |
|---|---|---|---|---|---|
| 1.00Providing Scaffolding charges for Vimanams and Gopurams with casurina posts coconut or palm trees wherever necessary for main, form work and providing with net lawn/PVC mesh coverings, providing ladder arrangements, country wood plank for working, inspection etc. complete, hire charges only for erection, maintenance and removing the same on completion of the work. etc complete complying with standard specification and as directed by departmental officers. (TNBP. Specification.No : Special) | |||||
| 1.01 | Height upto (50'-0") | 810 | 1 M2 (One Square Metre) | 482 ₹3,90,420 Lowest | 483 ₹3,91,230 |
| 1.02 | Height upto (15'-0") | 70 | 1 M2 (One Square Metre) | 282 ₹19,740 Lowest | 282 ₹19,740 Lowest |
| 2.00 | Scraping the old plastering surface of vimanams/ wall carefully including isolated bricks or brick work without damaging the vari vargams, racking out the joints, cleaning the surfaces with water including all working in heights, hire charges for special tools, brushes etc complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : Special) | 1,206 | 1 M2 (One Square Metre) | 4 ₹4,824 Lowest | 4 ₹4,824 Lowest |
| 3.00Painting with multi colour ( Panchavaranam ) using good water base exterior emulsion paint over a priming coat with approved premeir etc., complete for the vimanam and gopuram for ornamental works including cost and conveyance of all materials labour charges including artist painter working in heights , lifting materials cost of brushes etc. which including allextra for foldingsetc complete complying with standard specification and as directed by the departmental officers.( The brand ,colour,shade and quality of paint should be got approved by the Executive Engineer before use on works ) (TNBP. Specification.No : 66 & 66-A) | |||||
| 3.01 | Height upto (15'-0") | 6,800 | 1 Sft ( One Square Feet ) | 116 ₹7,88,800 Lowest | 117 ₹7,95,600 |
| 3.02 | Height upto (25'-0") | 5,832 | 1 Sft ( One Square Feet ) | 130 ₹7,58,160 Lowest | 132 ₹7,69,824 |
| 4.00 | Restoration by providing herbal water wash(Combination of Venthayam powder 20%, Siyakai Powder 10%, Arapu powder 5%, Boonthi kottai powder 50%, Arugampul powder 3%, Nannari ver powder 3%, Vettiver powder 3%, Korai kizhangu powder 3%, and sembaruthi leaf powder 3% total 100%) are used for removel of lime wash on stone and oil smudge) and approrimats methodology to restore the originalities of the existing granite structure inclusive of hire charges scaffolding arrangements conveyance charges for tools & plants and machinaries to the workship spot and cleaning the site after completion of work etc complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : special) | 4,605 | 1 Sft ( One Square Feet ) | 4 ₹18,420 Lowest | 5 ₹23,025 |
| 5.00 | Pointing with Lime mortar 1:1.5 ( One of Lime and One and Half of M.sand ) with neat finishing including all tools and plants and labour etc for cut stone masonry.etc complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : 60) | 561 | 1 M2 (One Square Metre) | 275 ₹1,54,275 Lowest | 276 ₹1,54,836 |
| 6.00 | Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortor1:1.5 ( One of lime and one & half of sand ) with special grinding with gallnut jaggary etc complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Lime Mortor1:1.5 ( One of lime and one & half of sand ) and finishing with final ornamental plastering and nayam theervai including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. for kalkaram.gopurams 100sft superficial area for kalkaram etc.complete complying with standard specifications and as directed by the departmental officers. (Height upto 25'0") (TNBP. Specification.No : Special) | 73 | 1 M2 (One Square Metre) | 5,495 ₹4,01,135 Lowest | 5,498 ₹4,01,354 |
Tender Value
₹1.2 Cr
EMD Value
₹71,000
Closing Date
24 Dec 2024, 12:30 pmClosed
Executive Officer
Executive Officer office Arulmigu Pachhaiyamman Samedha Mannarsamy Thirukkoil at Munugapattu Village in Cheyyar Taluk of Tiruvannamalai District.
Repairs and Renovation of Arulmigu Pachhaiyamman Samedha Mannarsamy Thirukkoil at Munugapattu Village in Cheyyar Taluk of Tiruvannamalai District.
2024_HRCE_508254_1
17/2024-2025
Open Tender
Civil Works
Lump-sum
Munugapattu Village in Cheyyar Taluk
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹71,000
13 Aug 2026
6 Dec 2024
24 Dec 2024
6 Dec 2024
24 Dec 2024
6 Dec 2024
Amount
Providing Scaffolding charges for Vimanams and Gopurams with casurina posts coconut or palm trees wherever necessary for main, form work and providing with net lawn/PVC mesh coverings, providing ladder arrangements, country wood plank for working, inspection etc. complete, hire charges only for erection, maintenance and removing the same on completion of the work. etc complete complying with standard specification and as directed by departmental officers. (TNBP. Specification.No : Special)
Height upto (50'-0")
Height upto (15'-0")
Scraping the old plastering surface of vimanams/ wall carefully including isolated bricks or brick work without damaging the vari vargams, racking out the joints, cleaning the surfaces with water including all working in heights, hire charges for special tools, brushes etc complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : Special)
Painting with multi colour ( Panchavaranam ) using good water base exterior emulsion paint over a priming coat with approved premeir etc., complete for the vimanam and gopuram for ornamental works including cost and conveyance of all materials labour charges including artist painter working in heights , lifting materials cost of brushes etc. which including allextra for foldingsetc complete complying with standard specification and as directed by the departmental officers.( The brand ,colour,shade and quality of paint should be got approved by the Executive Engineer before use on works ) (TNBP. Specification.No : 66 & 66-A)
Height upto (15'-0")
Height upto (25'-0")
Restoration by providing herbal water wash(Combination of Venthayam powder 20%, Siyakai Powder 10%, Arapu powder 5%, Boonthi kottai powder 50%, Arugampul powder 3%, Nannari ver powder 3%, Vettiver powder 3%, Korai kizhangu powder 3%, and sembaruthi leaf powder 3% total 100%) are used for removel of lime wash on stone and oil smudge) and approrimats methodology to restore the originalities of the existing granite structure inclusive of hire charges scaffolding arrangements conveyance charges for tools & plants and machinaries to the workship spot and cleaning the site after completion of work etc complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : special)
Pointing with Lime mortar 1:1.5 ( One of Lime and One and Half of M.sand ) with neat finishing including all tools and plants and labour etc for cut stone masonry.etc complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : 60)
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortor1:1.5 ( One of lime and one & half of sand ) with special grinding with gallnut jaggary etc complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Lime Mortor1:1.5 ( One of lime and one & half of sand ) and finishing with final ornamental plastering and nayam theervai including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. for kalkaram.gopurams 100sft superficial area for kalkaram etc.complete complying with standard specifications and as directed by the departmental officers. (Height upto 25'0") (TNBP. Specification.No : Special)
Painting two coats of newly plastered wall surface withWater based Exterior emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt etc., and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) (TNBP. Specification.No : 66 & 66-A)
Labour Charges for removing the stone wall and carefully stacking the materials including all labour charges etc.,complete complying with standard specifications and as directed by the departmental officers. (TNBP. Specification.No : similar to 18 )
Supply of cut stone,cut stone pillar and cut stone beam etc.,complete complying with standard specifications and as directed by the departmental officers.(TNBP. Specification.No : 4&35 and special )
Labour charges for fully dressing and fixing the cut stone of (Nilaikal) various stages incement mortar 1:3 ( one of cement and Three of M.sand) including pointing the same mortar as directed etc., complete complying with standard specifications and as directed by the departmental officers.(TNBP. Specification.No : similar to 35,35-A/35-B and special )
Supplying & fixing best quality well seasoned Teak wood temple type ornamental door in verious sizes and required height with 2'' minimum and 7'' maximum thick ornamental frames as per approved palns and design including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete complying with standard specifications and as directed by the departmental officials (TNBP. Specification.No : similar to 72&74 )
Painting two coats to new wood work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat with approved premier in all floors including the cost of primer etc., complete complying with standard specification and as directed by departmental officers. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)(TNBP. Specification.No : 66&66-A )
Supplying & Paving flooring with cut stone of size 600 mm X 600 mm and another sizes suitable for site conditions with machine cut edges and not less than 100mm thick and fully dressed as directed by the departmental officers,and set in Combination morter 1:1:5 ( one of Cement ,One of lime and Five of M.sand ) and pointing withCombination morter 1:1:5 ( one of Cement ,One of lime and Five of M.sand ) including cost and conveyance of all materials etc., complete Complying with standard specifications. and directed by the departmental officers (The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.)(TNBP. Specification.No : 4&35 and special )
Supplying and filling in foundation, basement, etc with filling crushed stone sand ( M.Sand) in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : 24&25 )
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.(TNBP. Specification.No : 44 )
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Lime Mortar 1:1.5 (One of Lime and One & half of M.sand)12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 44-H)
SUB TOTAL
V.Anbukarasu (BID ID -1217230)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .