| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-AOC | ₹2.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.5 Cr+₹12.1 L (5.01%)Rejected-Finance 1 292 SOUTHSTREET THIYAGAVAN SERI RAMANATHAPURAM 623530 | RAMANATHAPURAM | TAMIL NADU | 623530 | ₹2.5 Cr+₹12.1 L (5.01%) | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-non responsive in submission of original affidavits |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-non responsive in submission of original affidavits |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-non responsive in submission of original affidavits |
| Sl No | Description | Qty | Unit | IVR & CO L1 | MKT SUMAN Private Limited L2 |
|---|---|---|---|---|---|
| 1.00Part I: Strengtherning the road from Vengalur - Urakudi road to Sangangkottai 0/0 - 1/285. | |||||
| 2.00 | Clearing the scrub jungle including all labour charges for burrying and burning etc complete | 1,134 | Sqm | 6.3 ₹7,144.2 Lowest | 7 ₹7,938 |
| 3.00 | Picking the Existing B.T surface including all labour charges etc complete | 1,597 | Sqm | 23.3 ₹37,210.1 Lowest | 25 ₹39,925 |
| 4.00Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte. | |||||
| 5.00 | km 0/0 -1/285 | 689.9 | cum | 140.4 ₹96,861.96 Lowest | 150 ₹1,03,485 |
| 6.00Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete. | |||||
| 7.00 | km 0/0 -1/000 | 120 | cum | 681 ₹81,720 Lowest | 700 ₹84,000 |
| 8.00 | km 1/0 -1/285 | 34.2 | cum | 691 ₹23,632.2 Lowest | 700 ₹23,940 |
| 9.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 10.00 | km 1/0 -1/285 | 718.65 | cum | 2,994.5 ₹21,51,997.42 Lowest | 3,000 ₹21,55,950 |
Tender Value
Refer Docs
EMD Value
₹2.6 L
Closing Date
3 Sept 2025, 3:00 pmClosed
The Additional Collector (Dev.)
DRDA, Ramanathapuram
Ramanathapuram District-Paramakudi Block - 07/MGSMT/2025-26(Phase-III)
2025_RDTN_594397_2
DIPR/4437/Tender/2025
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA
As per Tender Document
5 documents required · 5 mandatory
₹0
₹2.6 L
DRDA, Ramanathapuram
6 Nov 2025
19 Aug 2025
3 Sept 2025
19 Aug 2025
3 Sept 2025
19 Aug 2025
21 Aug 2025
Amount
Part I: Strengtherning the road from Vengalur - Urakudi road to Sangangkottai 0/0 - 1/285.
Clearing the scrub jungle including all labour charges for burrying and burning etc complete
Picking the Existing B.T surface including all labour charges etc complete
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
KM metre stone
Hecta metre stone
Construction of Toe wall @ ch.0/725-0/790,ch @.0/910-0/945
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
Toe wall @ ch.0/725-0/790,ch @.0/910-0/945
Supplying and Filling foundation and basement with filling sand in layers not more than 15 cm Thick well rammed, watered and compacted Complete complying with standard specification
Toe wall @ ch.0/725-0/790,ch @.0/910-0/945
Cement concrete 1:4:8 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick, compacting etc., complete complying with standard specifications and as directed.
Toe wall @ ch.0/725-0/790,ch @.0/910-0/945
Supplying and erecting sheet centering of size laid over silver oak joist and supported by casurina post Complete complying with standard specification
Toe wall @ ch.0/725-0/790,ch @.0/910-0/945
Cement concrete 1:3:6 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick, compacting etc., complete complying with standard specifications and as directed.
Toe wall @ ch.0/725-0/790,ch @.0/910-0/945
Providing Expansion joint for every 10m interval
Toe wall @ ch.0/725-0/790,ch @.0/910-0/945
Part II: Strengtherning the road from Peerkankuruchi Road to Koonankulam road junction (via Kavirayar Puliyankulam kovil road KM 0/0-1/390
Clearing the scrub jungle including all labour charges for burrying and burning etc complete
Picking the Existing B.T surface including all labour charges etc complete
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
KM stone
Hecta metre stone
Construction of Toe wall @ ch.0/710-0/865,
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
Toe wall @ ch.0/710-0/865
Supplying and Filling foundation and basement with filling sand in layers not more than 15 cm Thick well rammed, watered and compacted Complete complying with standard specification
Toe wall @ ch.0/710-0/865
Cement concrete 1:4:8 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick, compacting etc., complete complying with standard specifications and as directed.
Toe wall @ ch.0/710-0/865
Supplying and erecting sheet centering of size laid over silver oak joist and supported by casurina post Complete complying with standard specification
Toe wall @ ch.0/710-0/865
Cement concrete 1:3:6 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick, compacting etc., complete complying with standard specifications and as directed.
Toe wall @ ch.0/710-0/865
Providing Expansion joint for every 10m interval
Toe wall @ ch.00/710-0/865
Part III:Strengtherning the road from Kallikudi to Vagaikulam road. KM 0/0-1/260
Clearing the scrub jungle including all labour charges for burrying and burning etc complete
Picking the Existing B.T surface including all labour charges etc complete
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
KM stone
Hecta metre stone
Construction of Pipe Culvert @ ch.1235,
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
Pipe Culvert @ ch.1235
Supplying and Filling foundation and basement with filling sand in layers not more than 15 cm Thick well rammed, watered and compacted Complete complying with standard specification
Pipe Culvert @ ch.1235
Cement concrete 1:4:8 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick, compacting etc., complete complying with standard specifications and as directed.
Toe wall @ ch.0/710-0/865
Supplying and erecting sheet centering of size laid over silver oak joist and supported by casurina post Complete complying with standard specification
Toe wall @ ch.0/710-0/865
Cement concrete 1:3:6 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick, compacting etc., complete complying with standard specifications and as directed.
Pipe Culvert @ ch.1235
Provision for 900mm dia RCC Pipe NP3 including all labour charges
Pipe Culvert @ ch.1235
Construction of Pipe Culvert @ ch.1255,
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
Pipe Culvert @ ch.1255
Supplying and Filling foundation and basement with filling sand in layers not more than 15 cm Thick well rammed, watered and compacted Complete complying with standard specification
Pipe Culvert @ ch.1255
Cement concrete 1:4:8 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick, compacting etc., complete complying with standard specifications and as directed.
Pipe Culvert @ ch.1255
Supplying and erecting sheet centering of size laid over silver oak joist and supported by casurina post Complete complying with standard specification
Pipe Culvert @ ch.1255
Cement concrete 1:3:6 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick, compacting etc., complete complying with standard specifications and as directed.
Pipe Culvert @ ch.1255
Provision for 900mm dia RCC Pipe NP3 including all labour charges
Pipe Culvert @ ch.1255
Part IV:Strengtherning the road from Paramakudi-Muthukulathur Road to Ram Nagar road KM 0/0-0/660
Clearing the scrub jungle including all labour charges for burrying and burning etc complete
Picking the Existing B.T surface including all labour charges etc complete
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Hecta metre stone
Part V: Strengtherning the road from Thaduthalankottai-Veeracholan Road to Pirisai road KM 0/0-1/020
Clearing the scrub jungle including all labour charges for burrying and burning etc complete
Picking the Existing B.T surface including all labour charges etc complete
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
KM stone
Hecta metre stone
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
MKT SUMAN Private Limited (BID ID -1446351)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .