Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.3 LAccepted-Finance | L1 | Accepted-Finance Lowest bidder | |
| 2 | L2₹10.3 L+₹4,912.93 (0.48%)Rejected-Finance R O VILLAGE CHAMERA P O RAWLAKIAR TEHSIL KOTKHAI DISTT SHIMLA H P | SHIMLA | HIMACHAL PRADESH | 171001 | L2 | Rejected-Finance L2 bidder |
Tender Value
Refer Docs
EMD Value
₹19,700
Closing Date
20 Mar 2026, 10:00 amClosed
Executive Engineer
HPPWD DIVISION KOTKHAI
R/R Damages on Gumma Pujali Baghi Road KM 0/00 to 28/500 C/o B/wall at RD in wire Crate, PCC at RD 6/205 to 6/220 6/340 to 6/370 and ROFD between KM 6/205 to 6/220, 6/340 to 6/370
2026_PWD_131256_29
PW-KD-E-Tender/25-26-15042-47 dated 5-3-2026
Open Tender
Civil Works - Roads
Percentage
45 days
Kalbog
Please refer Tender documents.
10 documents required · 10 mandatory
₹350
₹19,700
29 Apr 2026
13 Mar 2026
20 Mar 2026
13 Mar 2026
20 Mar 2026
13 Mar 2026
Excavation in earth work in hilly area in all heights and depths in all kinds of soil including saturated soil comprising of mixed soil, ordinary and hard rock. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion,damage to hill side.Water pollution, etc and to protect soil stability of hill side rock shall be excavated with chiseling and wedging our rock (where blasting is prohibited).All earth work in cutting/excavation including rock excavation shall be carried out true to line,grades,slops,width,camber,super elevation and level as shown on the drawing as per direction of Engineer in Charge in conformity with the requirement of technical specification for rural roads august 2004 clause 16.2 of general conditions of contract to achieve designed formation width including hauling and stacking of material useful for construction at suitable sites and stage, disposal of unsuitable cut material in specificied manner, trimmingfilling of unevenness blindage and finishing of the road to specified diamensions or as directed by Engineer in charge for smooth riding.The recovery of useful stones shall be made from the contractor and recovery of 50.41 cubic meter useful stones shall be made @ 300/-per cubic meter on prorata basis in each running bill. Any loss to the public and private property during the course of excavation shall be resorted by the contractor what so ever the nature of the same may be.The servicable material will be stacked out specified /dimension in all leads and lifts as per the direction of Engineer in Charge.
Earth work in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all leads , dressing of sides and bottom and back filling in trenches with excavated suitable material in ordinary soil upto all depth. as directed by the Engineer-in-Charge.all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases.
Providing and laying in position cement concrete of specified grade including the cost of form work in R/walls 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)including hauling of material in all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge.
Providing & making Gabion structure with mechanically woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012 ,MORTH Clause 2500, of requred size, Mesh Type 10x12 (D=100mm with tolerance of = 2%) Zinic+coated, Mesh wire diameter 2.7/3.7mm, Mechanically edged/selvedged with paritions at every 1 m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm (ID/OD), supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing , all complete as per direction of Engineer-in-charge.
Providing weep holes in brick/ stone / plain reinforced concrete abutment, wing wall, return walls with 100 mm dia PVC pipe extending through the full width of the structure with slope of 1V : 20H towards drawing face complete as per drawing and technical specifications clauses 614, 709 and 1204.3.7 including carriage of material within all leads and lifts and other incidentals. including hauling of material in all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
22.pdf
Tender Documents • 4.66 MB
BOQ_194318.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .