Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-PreQual/Technical PLOT NO 137 AVTAR ENCLAVE PASCHIM VIHAR NEWDELHI 110063 | NEW DELHI | NEW DELHI | DELHI | 110063 | Admitted-PreQual/Technical |
Tender Value
₹7.2 Cr
EMD Value
₹9.4 L
Closing Date
13 Apr 2026, 4:00 pmClosed
General Manager (Commercial)
Bridge and Roof Co. (India) Ltd Kankaria Centre (4TH/5th Floor) 2/1 Russel Street Kolkata 700 071
Works Contract for Structural Erection Works in connection with Civil, Structural and UG Piping Works for Units and Offsite (Part-B) for Bina Petchem and Refinery Expansion Project (BPREP) of M/s Bharat Petroleum Corporation Limited (BPCL)
2026_BandR_899741_1
B AND R/HO/71168/STRL. EREC/SC/BPREP/BPCL/NIT/01
Open Tender
Miscellaneous Works
Works
240 days
Bina Petchem and Refinery Expansion Project, BPCL
ALL TECHNICAL SPECS IS IN Page 143 of Tender Document via google drive link
10 documents required · 10 mandatory
₹11,800
Bridge and Roof Co.India Ltd
₹9.4 L
30 Apr 2026
21 Feb 2026
16 Apr 2026
21 Feb 2026
13 Apr 2026
24 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | STRUCTURAL STEEL WORKS SPEC NO. 6-68-0006 | - | - | - | - |
| 2 | General Steel Works - FIM Items | - | - | - | - |
| 3 | Dismantling, modification & re-erecting in position and testing/ examining bolted and/ or welded STRUCTURAL STEEL WORKS ALREADY ERECTED BY OTHERS at all locations and levels UPTO & INCLUSIVE OF 20 m ABOVE HPP/ FGL, including all builtup sections/ compound sections made out of rolled sections and/or plates/ bent plates in all types of structural frameworks, floor beams, stairs, or any other structural items or accessories to support equipments, piping, conveyor galleries, towers, masts, etc., but excluding silos, bunkers, hoppers, etc., cutting to required size, straightening/ bending if required, edge preparation, cleaning, preheating, bolting/ welding of joints, (including sealing the joints of box sections with continuous welding and plugging any open ends & holes of box sections), finishing edges by grinding, fixing in line and level with temporary staging & bracing and removal of the same after erection, repair of damaged portion of primer as per Sl No 3.1 of Table 3 of Standard Specification for Surface Preparation and Protective Coating Document No. 6-79-0020 (or as per Job Specification, wherever applicable), grouting with Ordinary Grout or premix free flow Nonshrink Grout as specified etc., all complete. SUPPLY OF ALL OTHER MATERIAL (OTHER THAN ALREADY ERECTED STRUCTURAL STEEL) IN CONTRACTOR'S SCOPE. | 1 | MT | 29,440 | ₹29,440 |
| 4 | Dismantling, modification & re-erecting in position and testing/ examining bolted and/ or welded STRUCTURAL STEEL WORKS ALREADY ERECTED BY OTHERS at all locations and levels MORE THAN 20 m ABOVE HPP/ FGL, including all builtup sections/ compound sections made out of rolled sections and/or plates/ bent plates in all types of structural frameworks, floor beams, stairs, or any other structural items or accessories to support equipments, piping, conveyor galleries, towers, masts, etc., but excluding silos, bunkers, hoppers, etc., cutting to required size, straightening/ bending if required, edge preparation, cleaning, preheating, bolting/ welding of joints, (including sealing the joints of box sections with continuous welding and plugging any open ends & holes of box sections), finishing edges by grinding, fixing in line and level with temporary staging & bracing and removal of the same after erection, repair of damaged portion of primer as per Sl No 3.1 of Table 3 of Standard Specification for Surface Preparation and Protective Coating Document No. 6-79-0020 (or as per Job Specification, wherever applicable), grouting with Ordinary Grout or premix free flow Nonshrink Grout as specified etc., all complete. SUPPLY OF ALL OTHER MATERIAL (OTHER THAN ALREADY ERECTED STRUCTURAL STEEL) IN CONTRACTOR'S SCOPE. | 1 | MT | 31,280 | ₹31,280 |
| 5 | General Steel Works - FIM Items | - | - | - | - |
| 6 | Unloading & shifting (within plant premises of BPCL Bina Refinery) of fabricated structural components from truck/trailer & storing at site, assembling & erecting in position and testing/ examining bolted and/ or welded STRUCTURAL STEEL WORKS of Grade E250BR / E250B0 (confirming to IS:2062) at all locations and levels UPTO & INCLUSIVE OF 20 m ABOVE HPP/ FGL, including all builtup sections/ compound sections made out of rolled sections and/or plates/ bent plates in all types of structural frameworks, floor beams, stairs, or any other structural items or accessories to support equipments, piping, conveyor galleries, towers, masts, etc., but excluding silos, bunkers, hoppers, etc., cutting to required size, straightening/ bending if required, edge preparation, cleaning, preheating, bolting/ welding of joints, (including sealing the joints of box sections with continuous welding and plugging any open ends & holes of box sections), finishing edges by grinding, fixing in line and level with temporary staging & bracing and removal of the same after erection, grouting with Ordinary Grout or premix free flow Nonshrink Grout as specified, etc., all complete. SUPPLY OF ALL OTHER MATERIALS (OTHER THAN ALREADY FABRICATED STRUCTURAL STEEL & PERMANENT BOLTS) IN CONTRACTOR'S SCOPE. | 2 | MT | 13,800 | ₹27,600 |
| 7 | Unloading & shifting (within plant premises of BPCL Bina Refinery) of fabricated structural components from truck/trailer & storing at site, assembling & erecting in position and testing/ examining bolted and/ or welded STRUCTURAL STEEL WORKS of Grade E250BR / E250B0 (confirming to IS:2062) at all locations and levels MORE THAN 20 m ABOVE HPP/ FGL, including all builtup sections/ compound sections made out of rolled sections and/or plates/ bent plates in all types of structural frameworks, floor beams, stairs, or any other structural items or accessories to support equipments, piping, conveyor galleries, towers, masts, etc., but excluding silos, bunkers, hoppers, etc., cutting to required size, straightening/ bending if required, edge preparation, cleaning, preheating, bolting/ welding of joints, (including sealing the joints of box sections with continuous welding and plugging any open ends & holes of box sections), finishing edges by grinding, fixing in line and level with temporary staging & bracing and removal of the same after erection, grouting with Ordinary Grout or premix free flow Nonshrink Grout as specified, etc., all complete. SUPPLY OF ALL OTHER MATERIALS (OTHER THAN ALREADY FABRICATED STRUCTURAL STEEL & PERMANENT BOLTS) IN CONTRACTOR'S SCOPE. | 2 | MT | 13,800 | ₹27,600 |
| 8 | Unloading & shifting (within plant premises of BPCL Bina Refinery) of fabricated structural components from truck/trailer & storing at site, assembling & erecting in position and testing/ examining , bolted and/ or welded STRUCTURAL STEEL WORKS of Grade E250BR / E250B0 (conforming to IS:2062 at all locations and levels UPTO & INCLUSIVE OF 20 m ABOVE HPP/ FGL including all builtup sections/ compound sections made out of rolled sections and/or plates/ bent plates in all types of structural frameworks, floor beams, stairs, or any other structural items or accessories to support equipments, piping, conveyor galleries, towers, masts, etc., but excluding silos, bunkers, hoppers, etc., cutting to required size, straightening/ bending if required, edge preparation, cleaning, preheating, bolting/ welding of joints, (including sealing the joints of box sections with continuous welding and plugging any open ends & holes of box sections), finishing edges by grinding, fixing in line and level with temporary staging & bracing and removal of the same after erection, grouting with Ordinary Grout or premix free flow Nonshrink Grout as specified, etc., all complete. SUPPLY OF ALL OTHER MATERIALS (OTHER THAN ALREADY FABRICATED STRUCTURAL STEEL & PERMANENT BOLTS) IN CONTRACTOR'S SCOPE. | 2 | MT | 13,800 | ₹27,600 |
| 9 | Unloading & shifting (within plant premises of BPCL Bina Refinery) of fabricated structural components from truck/trailer & storing at site, assembling & erecting in position and testing/ examining , bolted and/ or welded STRUCTURAL STEEL WORKS of Grade E250BR / E250B0 (conforming to IS:2062 at all locations and levels MORE THAN 20 m ABOVE HPP/ FGL including all builtup sections/ compound sections made out of rolled sections and/or plates/ bent plates in all types of structural frameworks, floor beams, stairs, or any other structural items or accessories to support equipments, piping, conveyor galleries, towers, masts, etc., but excluding silos, bunkers, hoppers, etc., cutting to required size, straightening/ bending if required, edge preparation, cleaning, preheating, bolting/ welding of joints, (including sealing the joints of box sections with continuous welding and plugging any open ends & holes of box sections), finishing edges by grinding, fixing in line and level with temporary staging & bracing and removal of the same after erection, grouting with Ordinary Grout or premix free flow Nonshrink Grout as specified, etc., all complete. SUPPLY OF ALL OTHER MATERIALS (OTHER THAN ALREADY FABRICATED STRUCTURAL STEEL & PERMANENT BOLTS) IN CONTRACTOR'S SCOPE. | 2 | MT | 13,800 | ₹27,600 |
| 10 | Unloading & shifting (within plant premises of BPCL Bina Refinery) of fabricated structural components from truck/trailer & storing at site, assembling & erecting in position and testing/ examining bolted and/ or welded STRUCTURAL STEEL WORKS of Grade E350BR / E350B0 (conforming to IS:2062) at all locations and levels UPTO & INCLUSIVE OF 20 m ABOVE HPP/ FGL, including all builtup sections/ compound sections made out of rolled sections and/ or plates/ bent plates in all types of structural frameworks, floor beams, stairs, or any other structural items or accessories to support equipments, piping, conveyor galleries, towers, masts, etc., but excluding silos, bunkers, hoppers, etc., cutting to required size, straightening/ bending if required, edge preparation, cleaning, preheating, bolting/ welding of joints, (including sealing the joints of box sections with continuous welding and plugging any open ends & holes of box sections), finishing edges by grinding, fixing in line and level with temporary staging & bracing and removal of the same after erection, grouting with Ordinary Grout or premix free flow Nonshrink Grout as specified, etc., all complete. SUPPLY OF ALL OTHER MATERIALS (OTHER THAN ALREADY FABRICATED STRUCTURAL STEEL & PERMANENT BOLTS) IN CONTRACTOR'S SCOPE. | 2 | MT | 13,800 | ₹27,600 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.37 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.58 MB
eNIT_STRL_EREC_71168_WORKS_BINA_BPCL.pdf
Tender Documents • 1.57 MB
BOQ_945729.xls
BOQ • 0.42 MB
CORRIGENDUM_4_STRL_EREC_71168_BPREP_BPCL.pdf
PDF • 0.63 MB
CORRIGENDUM_3_STRL_EREC_71168_BPREP_BPCL.pdf
PDF • 0.63 MB
CORRIGENDUM_2_STRL_EREC_71168_BPREP_BPCL.pdf
PDF • 0.63 MB
CORRIGENDUM_1_STRL_EREC_71168_BPREP_BPCL.pdf
PDF • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .