Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹2.0 L+₹33,412.49 (20.6%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹2.7 L+₹1.1 L (68.7%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹2.8 L+₹1.2 L (73.2%)Admitted-Finance | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S N.S. CONSTRUCTION L1 | M/S MAYA CONSTRUCTION L3 | M/S H.K.C. CONSTRUCTION L4 | M/s SADANBABU CONTRACTOR L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Silt clearance/trench digging including lift upto 1.5m and lead
upto 6m, including cost of driver/assistant driver, POL,
maintenance of machine, contractor profit, taxes etc but
excluding leveling, dressing & compaction. | 3,278.54 | Cum | 25 ₹81,963.5 Lowest | 43 ₹1,40,977.22 | 45.5 ₹1,49,173.57 | 33.5 ₹1,09,831.09 |
| 2.00 | Uprooting Jhund and moonj with disposal away frome site. | 3,297.3 | Sqm | 20 ₹65,946 Lowest | 36 ₹1,18,702.8 | 35 ₹1,15,405.5 | 23 ₹75,837.9 |
| 3.00 | Videography/Photography of silt clearance works in canal and drains before, during and after silt clearance by DRONE as per requirement including supply of Videography/Photography in Pen Drive and vehicles for movement as per direction of Engineer in charge. | 9.66 | KM | 1,450 ₹14,007 | 1,400 ₹13,524 | 1,650 ₹15,939 | 1,000 ₹9,660 Lowest |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
25 Sept 2026, 1:00 pmClosed
Executive Engineer
ICD Firozabad Hq Shikohabad
Silt Clearance and scraping work at Hanumant Khera Minor Km 0.000 to 4.827 and Ujrai Minor km 0.000 to 4.828
2026_UPIDC_1187280_1
03/EE/2026-27/14
Open Tender
Civil Works - Canal
Item Rate
30 days
Hanumant Khera Minor and Ujrai Minor
Please refer tender documents
2 documents required · 2 mandatory
₹266
₹6,000
15 Oct 2026
18 Sept 2026
25 Sept 2026
18 Sept 2026
25 Sept 2026
18 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Silt clearance/trench digging including lift upto 1.5m and lead
upto 6m, including cost of driver/assistant driver, POL,
maintenance of machine, contractor profit, taxes etc but
excluding leveling, dressing & compaction. | 3,278.54 | Cum | - | - |
| 2 | Uprooting Jhund and moonj with disposal away frome site. | 3,297.3 | Sqm | - | - |
| 3 | Videography/Photography of silt clearance works in canal and drains before, during and after silt clearance by DRONE as per requirement including supply of Videography/Photography in Pen Drive and vehicles for movement as per direction of Engineer in charge. | 9.66 | KM | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.66 MB
14.pdf
Tender Documents • 3.90 MB
BOQ_2235441.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .