Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Fee/PreQual/Technical/Finance | -0.02% | ₹1.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.5 L+₹14.62 (0.01%)Admitted-Fee/PreQual/Technical/Finance | -0.01% | ₹1.5 L+₹14.62 (0.01%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-osp |
Tender Value
₹1.4 L
EMD Value
₹4,350
Closing Date
7 Sept 2026, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
Const. of P/Wall from Arshid Hussain Khan to Aijaz Ah Khan at Khancheck
2026_RDPR_322835_11
NIT NO 103 OF 2026-27 ADF GEN
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹4,350
12 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
31 Aug 2026 - 31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means in trenches for foundations,including dressing of sides and ramming of bottoms lift upto 1.0 m, including getting out excavated earth and disposal of surplus excavated earth for all kinds of soils as directed by engineer incharge. | 7.2 | cum | - | - |
| 2 | Providing & laying of soling (dully hand packed) incl. watering ,dressing & ramming with all carriages loading, un-loading & stacking etc complete(plum) | 6.22 | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 20.09 | cum | - | - |
| 4 | Centring and shuttering incld. Strutting, proping etc & removal of form work for Founadtions, footings, bases of columns for mass concrete. | 42.6 | sqm | - | - |
| 5 | Carriage of Materials by MT Graded Sand /Coarse Agg (Crusher Bajri ) for an avg lead 15 km | 27.12 | cum | 344.94 | ₹9,354.77 |
| 6 | Signboard/photographs | 1 | No | 1,400 | ₹1,400 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_1084663.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .