| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹18.1 L+₹66,641.10 (3.83%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | C.S.R ENTERPRISES | NSR AND COMPANY |
|---|---|---|---|---|---|
| 1.00 | Providing and fixing well point system for dewatering for emptying water from underground storm water drain (or) otherwise as instructed for 2 Nos 10HP vacum dewatering pumps and a spare pump with 30 filters, operator cost of 3 shifts for 2Nos 10HP and maintenance cost etc., complete. | 30 | Days | 3,96,000 ₹4,67,280 | 3,90,000 ₹4,60,200 Lowest |
| 2.00 | Providing shoring and shuttering on all sides as directed, for holding firmly, the soil on the sides without any sliding, rate includes for cost of CW Planks, reaper, casurina posts with all labour, lead, lift, and dewatering etc., complete. | 475 | M2 | 3,08,750 ₹3,64,325 | 2,94,500 ₹3,47,510 Lowest |
| 3.00 | Earthwork excavation and Dismantling pipe and laying pipe using Hitachi poclain for draining the dewatering water from Time office North side upto Service Building pathway, rate including cost of poclain hire charges, labour, lead, lift etc., complete. | 712.5 | M3 | 1,92,375 ₹2,27,002.5 | 1,78,125 ₹2,10,187.5 Lowest |
| 4.00 | Providing PCC 1:2:4 using OP/PP cement with 40mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete. | 28.6 | M3 | 1,93,050 ₹2,27,799 | 1,88,760 ₹2,22,736.8 Lowest |
| 5.00 | Providing PCC 1:2:4 using OP/PP cement with 12 to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete. | 28.6 | M3 | 2,11,640 ₹2,49,735.2 | 2,05,920 ₹2,42,985.6 Lowest |
| 6.00 | Providing RCC 1:1.5:3 using OP/PP cement with 12 to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work. | 2.7 | M2 | 27,810 ₹32,815.8 | 27,000 ₹31,860 Lowest |
| 7.00 | Providing centering and shuttering using steel structures & props 10 to 13 cm. dia including cost of all materials, labours, lead, lift, etc. complete. | 70.12 | M2 | 39,968.4 ₹47,162.71 | 37,864.8 ₹44,680.46 Lowest |
| 8.00 | Supplying & providing RTS/MS rod including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials, labours, lead, lift, curing, etc. complete. | 135 | Kg | 14,040 ₹16,567.2 | 12,825 ₹15,133.5 Lowest |
| 9.00 | Brick work in CM 1:5 using fly ash bricks (230x110x70mm) including cost of all materials, labours, lead, lift, curing, etc. complete | 7.4 | M3 | 49,950 ₹58,941 | 48,840 ₹57,631.2 Lowest |
| 10.00 | Plastering with C.M 1:5, 12 mm thick including cost of all materials, labours, lead, lift, curing, etc. complete | 35.7 | M2 | 10,888.5 ₹12,848.43 | 10,353 ₹12,216.54 Lowest |
Tender Value
Refer Docs
EMD Value
₹14,800
Closing Date
13 Nov 2025, 2:00 pmClosed
CE TTPS Thoothukudi
Office of the SE Civil TTPS Thoothukudi
Improvement Works to the Old Underground Storm Water Drain from Time Office North side to 45N Road
2025_EB_621220_1
CE SE C TTPS 325 2025 26
Open Tender
Civil Works - Others
Item Rate
90 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14,800
Yes
23 Dec 2025
7 Nov 2025
14 Nov 2025
7 Nov 2025
13 Nov 2025
7 Nov 2025
Providing and fixing well point system for dewatering for emptying water from underground storm water drain (or) otherwise as instructed for 2 Nos 10HP vacum dewatering pumps and a spare pump with 30 filters, operator cost of 3 shifts for 2Nos 10HP and maintenance cost etc., complete.
Providing shoring and shuttering on all sides as directed, for holding firmly, the soil on the sides without any sliding, rate includes for cost of CW Planks, reaper, casurina posts with all labour, lead, lift, and dewatering etc., complete.
Earthwork excavation and Dismantling pipe and laying pipe using Hitachi poclain for draining the dewatering water from Time office North side upto Service Building pathway, rate including cost of poclain hire charges, labour, lead, lift etc., complete.
Providing PCC 1:2:4 using OP/PP cement with 40mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete.
Providing PCC 1:2:4 using OP/PP cement with 12 to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete.
Providing RCC 1:1.5:3 using OP/PP cement with 12 to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work.
Providing centering and shuttering using steel structures & props 10 to 13 cm. dia including cost of all materials, labours, lead, lift, etc. complete.
Supplying & providing RTS/MS rod including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials, labours, lead, lift, curing, etc. complete.
Brick work in CM 1:5 using fly ash bricks (230x110x70mm) including cost of all materials, labours, lead, lift, curing, etc. complete
Plastering with C.M 1:5, 12 mm thick including cost of all materials, labours, lead, lift, curing, etc. complete
Supplying and laying of 600 mm dia RCC Hume pipe, 2" Thickness for underground sewage system for sewer line including cost of required specials, cost of all materials, taxes, duties, labour, lead, lift, solvent, transporting charges, laying charges to proper grade and alignment, etc., complete as directed by the Engineer at site.
Refilling with excavated soil other than sand complying with standard specification for filling in foundation and basement with watering and consolidation including cost of all materials, labours, lead, lift, etc. complete.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_742815.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .