Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | L1 | Accepted-AOC Below | |
| 2 | L2₹2.9 L+₹6,557 (2.28%)Rejected-Finance | L2 | Rejected-Finance above |
| Sl No | Description | Qty | Unit | RCK CONSTRUCTION L2 | SRI PERIYANDICHIAMMAN CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 32 | M3 | 199 ₹6,368 | 180 ₹5,760 Lowest |
| 2.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 32 | M3 | 6,850 ₹2,19,200 | 6,720 ₹2,15,040 Lowest |
| 3.00 | Supply and delivery of 40mm HBG ISS metal including cost and conveyance of all materials to site and all labour charges for filling and all other incidental charges therefore etc complete | 13 | M3 | 1,475 ₹19,175 | 1,440 ₹18,720 Lowest |
| 4.00 | Providing and laying Tack Coat over WBM/ WMM Surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 122 | M2 | 25 ₹3,050 | 18 ₹2,196 Lowest |
| 5.00 | Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 50.30 kgs of VG30( 60/70) bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30t on capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory/Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher/9mpaver finisher, Vibratory/Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 4 | M3 | 11,650 ₹46,600 | 11,530 ₹46,120 Lowest |
Tender Value
₹3.5 L
EMD Value
₹7,000
Closing Date
22 Aug 2025, 3:00 pmClosed
Executive Officer
Salangapalayam Town Panchayat
Repair and Maintanence of Pot Holes for CC an B.T Road at Ward No-8 Dam street,W.No-1 Sendampalayam Road,W.No-4 Rettai vaikal Road,Ward No-5 Sakthi Bhavani Road to Sakthi Erode Road Anjal pathai,Ward No-7 Sakthi Bhavani Road to Sakthi Erode Road
2025_DTP_594714_1
6/2025
Open Tender
Civil Works - Others
Works
90 days
Salangapalayam Town Panchayat
2 documents required · 2 mandatory
₹0
₹7,000
28 Aug 2025
19 Aug 2025
22 Aug 2025
19 Aug 2025
22 Aug 2025
19 Aug 2025
19 Aug 2025 - 22 Aug 2025
Amount
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum
Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Supply and delivery of 40mm HBG ISS metal including cost and conveyance of all materials to site and all labour charges for filling and all other incidental charges therefore etc complete
Providing and laying Tack Coat over WBM/ WMM Surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 50.30 kgs of VG30( 60/70) bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30t on capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory/Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher/9mpaver finisher, Vibratory/Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
RCK CONSTRUCTION (BID ID -1436516)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_710617.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .