| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.8 LAccepted-AOC 439 D DEFENCE COLONY JAJMAU KANPUR 208010 | KANPUR NAGAR | UTTAR PRADESH | 208010 | L1 | Accepted-AOC Being L1 bidder | |
| 2 | L2₹63.2 L+₹1.4 L (2.33%)Rejected-Finance | L2 | Rejected-Finance Other than L1 bidder | |
| 3 | L3₹68.0 L+₹6.2 L (10.0%)Rejected-Finance DHANGU ROAD PAHTANKOT 145001 PB | PATHANKOT | PATHANKOT | PUNJAB | 145001 | L3 | Rejected-Finance Other than L1 bidder | |
| 4 | L4₹68.6 L+₹6.9 L (11.1%)Rejected-Finance | L4 | Rejected-Finance Other than L1 bidder | |
| 5 | Rejected-Technical 1ST FLOOR A 40 RAJPARK SULTANPURI NORTH WEST DELHI DELHI 110086 | NORTH WEST DELHI | DELHI | 110086 | - | Rejected-Technical Not approved for opening of financial bid being two class below eligible class in terms of Para 08 and Note 01 of NIT |
| Sl No | Description | Qty | Unit | Anand Construction L1 | M/S INDAN FURNITURE MART L3 | M/S Ajay Saini L4 | RAJINDER KUMAR AND ASSOCIATES L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Material and labour for new long rail made out of 32mm dia medium grade GI tubing both ends threaded etc complete including taking out existing old unserviceable long rail of charpoy GI pipe complete all as specified and shown on drawings. | 400 | Each | 300 ₹1,20,000 Lowest | 390 ₹1,56,000 | 430 ₹1,72,000 | 300 ₹1,20,000 Lowest |
| 2.00 | Material and labour for forming two short rails made out of one unserviceable long rail retrieved from Srl Item No 01 here-in-above including cutting and threading at both ends and fixing into existing charpoy frame and including taking out unserviceable short rail etc complete all as specified and shown on drawings. | 800 | Each | 30 ₹24,000 Lowest | 30 ₹24,000 Lowest | 50 ₹40,000 | 30 ₹24,000 Lowest |
| 3.00 | Material and labour for forming two legs made out of one unserviceable short rail retrieved from Srl Item No 02 here-in-above including cutting and threading at both ends and providing 32mm GI cap plugs fixing into existing charpoy frame and including taking out unserviceable legs etc complete all as specified and shown on drawings. | 1,600 | Each | 30 ₹48,000 Lowest | 30 ₹48,000 Lowest | 50 ₹80,000 | 40 ₹64,000 |
| 4.00 | Material and labour for 32mm dia heavy duty duly ISI marked, 65mm long GI three way elbow fixed in repair to charpoy including taking out unserviceable GI elbow complete all as specified and shown on drawings. | 350 | Each | 80 ₹28,000 | 100 ₹35,000 | 60 ₹21,000 Lowest | 85 ₹29,750 |
| 5.00 | Material and labour for 32mm dia GI check nut including taking out unservicable check nut etc complete all as specified and shown on drawings. | 200 | Each | 15 ₹3,000 | 15 ₹3,000 | 8 ₹1,600 Lowest | 15 ₹3,000 |
| 6.00 | Material and labour for removal of old unservicable nylon newar and tightening of charpoy frame properly after replacing the broken/unservicable elbow & check nuts and providing 03 Nos of MS flat iron stiffeners of size 900mmx40mmx6mm equally spaced to support plywood top (parallel to short rails) shall be fixed with nut & bolts as directed and providing 12mm thick plywood (BWR grade-I with ISI Marked) shall be fixed with nut, bolts & washer of stainless steel of appropriate size and flat iron stiffeners shall be painted with black colour over a coat of primer after preparation of surface i.e grinding of sharp edges of stiffeners before fixing on charpoy frames. 13 Nos of nuts/bolt/washer etc shall be used, after carrying out necessary drilling wherever required for conversion of charpoy GI nylon newar to charpoy GI plywood top, complete all as specified and irrespective what is shown on drawings. | 3,610 | Each Charpoy | 1,665 ₹60,10,650 Lowest | 1,825 ₹65,88,250 | 1,830 ₹66,06,300 | 1,700 ₹61,37,000 |
Tender Value
₹78.1 L
EMD Value
₹1.4 L
Closing Date
6 Oct 2025, 6:00 pmClosed
SH AJAY KUMAR MISHRA IDSE SE SAG CWE
HQ CWE MAMUN PIN 145001
SPL REPAIR RENEWAL CONVERSION OF CHARPOY GI PIPE NYLON NEWAR TO CHARPOY GI WITH PLYWOOD TOP UNDER GE N MAMUN
2025_MES_728821_1
CWE/M-28/2025-26
Open Tender
Civil Works - Others
Item Rate
240 days
MAMUN
As per tender documents
9 documents required · 9 mandatory
₹1,000
Yes
GE NORTH MAMUN
₹1.4 L
Yes
27 Nov 2025
1 Sept 2025
13 Oct 2025
1 Sept 2025
6 Oct 2025
22 Sept 2025
Amount
Material and labour for new long rail made out of 32mm dia medium grade GI tubing both ends threaded etc complete including taking out existing old unserviceable long rail of charpoy GI pipe complete all as specified and shown on drawings.
Material and labour for forming two short rails made out of one unserviceable long rail retrieved from Srl Item No 01 here-in-above including cutting and threading at both ends and fixing into existing charpoy frame and including taking out unserviceable short rail etc complete all as specified and shown on drawings.
Material and labour for forming two legs made out of one unserviceable short rail retrieved from Srl Item No 02 here-in-above including cutting and threading at both ends and providing 32mm GI cap plugs fixing into existing charpoy frame and including taking out unserviceable legs etc complete all as specified and shown on drawings.
Material and labour for 32mm dia heavy duty duly ISI marked, 65mm long GI three way elbow fixed in repair to charpoy including taking out unserviceable GI elbow complete all as specified and shown on drawings.
Material and labour for 32mm dia GI check nut including taking out unservicable check nut etc complete all as specified and shown on drawings.
Material and labour for removal of old unservicable nylon newar and tightening of charpoy frame properly after replacing the broken/unservicable elbow & check nuts and providing 03 Nos of MS flat iron stiffeners of size 900mmx40mmx6mm equally spaced to support plywood top (parallel to short rails) shall be fixed with nut & bolts as directed and providing 12mm thick plywood (BWR grade-I with ISI Marked) shall be fixed with nut, bolts & washer of stainless steel of appropriate size and flat iron stiffeners shall be painted with black colour over a coat of primer after preparation of surface i.e grinding of sharp edges of stiffeners before fixing on charpoy frames. 13 Nos of nuts/bolt/washer etc shall be used, after carrying out necessary drilling wherever required for conversion of charpoy GI nylon newar to charpoy GI plywood top, complete all as specified and irrespective what is shown on drawings.
RAJINDER KUMAR AND ASSOCIATES (BID ID -3444072)
M/S INDAN FURNITURE MART (BID ID -3442251)
M/S Ajay Saini (BID ID -3443876)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .