Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-AOC | ₹3.5 L | L1 | Accepted-AOC Minimum Rates |
| 2 | L2₹3.8 LRejected-Finance | ₹3.8 L | L2 | Rejected-Finance EMD Refunded. |
| 3 | L3₹4.1 LRejected-Finance R O VPO GHASWA DISTRICT FATEHABAD HARYANA 125051 | FATEHABAD | HARYANA | 125051 | ₹4.1 L | L3 | Rejected-Finance EMD Refunded. |
| Sl No | Description | Qty | Unit | GURDEEP SINGH CONTRACTOR L3 | SAINI ELECTRICAL WORKS L1 | jarnail singh cont, L2 |
|---|---|---|---|---|---|---|
| 1.00 | Repair of Submersible / Horizontal pumping sets for tubewell/ Booster only Consisting mainly of motor, pump, electrical control panel, starter, cable and all accessories, sluice valves, non return valves specials etc. including all appurtenances inside the premises of water works..
Submersible Motor Upto 20 BHP
20.00 BHP x 1 No = 20.00 BHP
Total = 20.00 BHP x 12 = 240.00 | 20 | Per BHP Per Month | 130 ₹31,200 | 109 ₹26,160 | 121 ₹29,040 |
| 2.00 | Submersible Motor More than 20 BHP
25.00 BHP x 1 No = 25.00 BHP
30.00 BHP x 7 No = 210.00 BHP
Total = 235.00 BHP x 12 =2820.00 | 235 | Per BHP Per Month | 130 ₹3.7 L | 109 ₹3.1 L | 121 ₹3.4 L |
| 3.00 | Horizontal Motor Upto 20 BHP.
10.00 BHP x 1 No = 10.00 BHP
Total = 10.00 BHP x 12 = 120.00 | 10 | Per BHP Per Month | 130 ₹15,600 | 109 ₹13,080 | 121 ₹14,520 |
Tender Value
₹4.1 L
EMD Value
₹8,300
Closing Date
9 Mar 2026, 3:00 pmClosed
SAMEER SHARMA
Panchkula PHED
Repair of pumping machiery of existing 9Nos Tubewells and 1 No. Booster of Block Barwala and all other works contingent thereto For One Year Under Sub Division Raipur Rani Taprian
2026_HRY_505940_1
2026DA5CD6EA EB07 4DD4 9D59 A1D8CA0E4CB3547PUH
Open Tender
Civil Works
365 days
TAPRIAN KHERAWALI PARWALA TIRLOKPUR GANESHPUR
2 documents required · 2 mandatory
₹500
Yes
₹8,300
Yes
19 Mar 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
Repair of Submersible / Horizontal pumping sets for tubewell/ Booster only Consisting mainly of motor, pump, electrical control panel, starter, cable and all accessories, sluice valves, non return valves specials etc. including all appurtenances inside the premises of water works.. Submersible Motor Upto 20 BHP 20.00 BHP x 1 No = 20.00 BHP Total = 20.00 BHP x 12 = 240.00
Submersible Motor More than 20 BHP 25.00 BHP x 1 No = 25.00 BHP 30.00 BHP x 7 No = 210.00 BHP Total = 235.00 BHP x 12 =2820.00
Horizontal Motor Upto 20 BHP. 10.00 BHP x 1 No = 10.00 BHP Total = 10.00 BHP x 12 = 120.00
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_584671.xls
BOQ • 0.27 MB
3C21BYZ153346.pdf
Additional Documents • 2.05 MB
Download all tender documents and submit your bid