Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.1 LAccepted-AOC BIRSINGHPUR | ₹79.1 L | L1 | Accepted-AOC L1 stood |
| 2 | L2₹81.3 LRejected-AOC BIRSINGHPUR | ₹81.3 L | L2 | Rejected-AOC L2 stood |
| 3 | L3₹84.3 LRejected-Finance 223 3 E B 1 MALTI TOWER TARABAI PARK KOLHAPUR 416 003 | KOLHAPUR | KOLHAPUR | MAHARASHTRA | 416003 | ₹84.3 L | L3 | Rejected-Finance L3 Stood |
| 4 | Rejected-Technical BIRSINGHPUR | GUNA | MADHYA PRADESH | 473001 | - | - | Rejected-Technical Due to non fulfilment of PQR clause no 6(b) |
| Sl No | Description | Qty | Unit | Abhishek Enterprises L2 | D N ENTERPRISES L1 | M/s. D R Construction L3 |
|---|---|---|---|---|---|---|
| 1.00Job-1: Manpower for various work | ||||||
| 1.01 | Annual work contract of day-to-day routine maintenance of 11KV/6.6KV/0.4KV Motors of BTG & BOP area of 2X600MW phase-1 SSTPP, Dongalia.
Annual work contract for shifting of filled hydrogen cylinder from hydrogen plant to TG building and empty cylinders back to H2 plant and filling of air/gas in generator for 2X600MW phase-1 SSTPP, Dongalia.
Annual work contract for operation, cleaning and minor maintenance of TG, administrative and service building lifts for 2X600MW phase-1 SSTPP, Dongalia. | 4,18,564.03 | Months | 20,928.2 ₹62.2 L | 62,784.6 ₹68.2 L | 48,134.86 ₹66.1 L |
| 2.00Job-2: Vehicle for shifting of hydrogen cylinders | ||||||
| 2.01 | Vehicle for shifting of filled hydrogen cylinder from hydrogen plant to TG building and empty cylinders back to H2 plant etc. & other as scope of work & also as and when required. Transportation as per new vehicle policy-2023 along with driver ( Skilled man power) | 12 | Months | 6,44,400 ₹6.8 L | 6,24,000 ₹7.4 L | 6,60,000 ₹7.8 L |
| 3.00Job-3: Annual work contract for breakdown maintenance of HT motors of 2X600MW phase-1 SSTPP, Dongalia. | ||||||
| 3.00850KW, 11KV,1489RPM RWIP motor | ||||||
| 3.01 | Dismantling & re-assembly including from foundation work of Motor. | 2 | Nos | 38,600 ₹45,548 | 10,000 ₹11,800 | 31,200 ₹36,816 |
| 3.01 | Inspection of bearings and pulling out damaged bearing from DE/NDE and opening of housing of required end for replacement of bearing and replacement of bearing (DE/NDE). | 2 | Nos | 96,500 ₹1.1 L | 20,000 ₹23,600 | 75,750 ₹89,385 |
| 3.01 | Inspections of bearing housing if housing clearance differs from the standard size, it shall be restore as the actual size by machining/ material filling work. | 2 | Nos | 19,300 ₹22,774 | 20,000 ₹23,600 | 9,000 ₹10,620 |
| 3.021450KW,6.6KV,995 rpm,3-PH FD Fan Motor | ||||||
Tender Value
₹90.0 L
EMD Value
₹1.8 L
Closing Date
6 Aug 2024, 3:30 pmClosed
S.E.(Works) SSTPP, MPPGCL, Dongalia
IIIrd Floor Admin Building SSTPP,MPPGCL Dongalia
Work of Day to day maintenance of 11/6.6/.4 KV motors, H2 cylinders shifting, lift operation and minor maintenance and major breakdown maintenance of HT motors of PH-1, 2X600 MW, SSTPP, MPPGCL, Dongalia.
2024_MPPGC_327202_1
WT-2217
Open Tender
Miscellaneous Works
365 days
O/o Addl CE PnW, IIIrd Floor Admin Building SSTPP
Please refer Tender documents.
19 documents required · 19 mandatory
₹2,000
Yes
₹1.8 L
Yes
11 May 2026
8 Jul 2024
8 Aug 2024
8 Jul 2024
6 Aug 2024
8 Jul 2024
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Tendernotice_2.pdf
PDF • 0.43 MB
Tendernotice_3.pdf
PDF • 1.05 MB
NIT327202.pdf
Tender Documents • 0.29 MB
DETAILEDNIT327202.pdf
Tender Documents • 0.41 MB
SOW327202.pdf
Tender Documents • 1.03 MB
SBDworksnewaddendummerge.pdf
Tender Documents • 30.02 MB
BOQ_418719.xls
BOQ • 0.31 MB
ModelCertificate.pdf
Additional Documents • 0.17 MB
Credentials327202.xls
Additional Documents • 0.09 MB
Annexures.pdf
Additional Documents • 0.54 MB
TCBid327202.xls
Additional Documents • 0.31 MB
Download all tender documents and submit your bid