Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC | ₹2.3 Cr | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹2.4 Cr+₹11.8 L (5.17%)Rejected-Finance VPO KHERI SANWAL TEHSIL AND DISTT CHARKHI DADRI 127306 | CHARKI DADRI | HARYANA | 127306 | ₹2.4 Cr+₹11.8 L (5.17%) | L2 | Rejected-Finance Needful done |
| 3 | L3₹2.5 Cr+₹22.4 L (9.84%)Rejected-Finance | ₹2.5 Cr+₹22.4 L (9.84%) | L3 | Rejected-Finance Needful done |
| 4 | L4₹2.6 Cr+₹27.5 L (12.1%)Rejected-Finance DHANI CHANDPUR TEHSIL AND DISTT REWARI HARYANA 123401 | REWARI | REWARI | HARYANA | 123401 | ₹2.6 Cr+₹27.5 L (12.1%) | L4 | Rejected-Finance Needful done |
Tender Value
₹2.6 Cr
EMD Value
₹5.1 L
Closing Date
13 Sept 2021, 3:00 pmClosed
Executive Engineer
Public Health Engineering Division No. 2, Narnaul
Construction of 14 Clear water tanks, 11 pump chambers, boundary wall, road, path, rising main lines, Supply, erection, testing and commissioning of horizontal centrifugal split casing clear water pumping sets at various 15 no. villages covered
2021_HRY_182968_2
EIC Pkl No. 60657-PHE/Prog dt.02-08-2021
Open Tender
Civil Works
Works
270 days
Narnaul
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
₹5.1 L
Yes
16 Nov 2021
1 Sept 2021
13 Sept 2021
1 Sept 2021
13 Sept 2021
1 Sept 2021
Amount
Supply & Eraction of Horizontal spindle split casing type pumping sets of following duties directly coupled to AC squirrel cage induction type motor with accessories as described in Schedule No II complete in all respect with priming arrangement with complete base frame SBS (VILLAGE BOOSTING STATIONS)
400 LPM X 55 M. Head
700 LPM X 55 M. Head
Supply, erection, testing & commissioning of IS marked copper wire for various motors with underground system in PVC and flexible pipes copper wire 3 core complete in all respevts with accessories like thimble etc. 10mm2 3core
25mm2 3core
35mm2 3core
Supply & erection of aliminium armored cable 3.5 core for LT with ISI marked of reputed make ( Havells, Polycab) for making connections from electric transformer to electric busbar complete in all respect. 25 sq. mm 31/2core
Supply erection testing of reputed make LED light 100 wats with fittings and accessories complete in all repects. (10 No. at Prop.SBS + 4 No. at IBS)
Supply erection testing and commissioning of Flow Meter (KRONE Make) with digital display of 150 mm i/d complete in all respect. ( 5 at prop. SBS + 2 at IBS 17)
Bidder Name
Amount
Deepak Yadav Contractor(GSTN-06ADLPY3399N1ZF)
RATHEE CONSTRUCTION CO(GSTN-06AARFR1412L1Z1)
SANJAY KUMAR CONT(GSTN-NA)
RAMPHAL PHOGAT CONT(GSTN-NA)
RAMPHAL PHOGAT CONT
RATHEE CONSTRUCTION CO
Deepak Yadav Contractor
SANJAY KUMAR CONT
Deepak Yadav Contractor
RAMPHAL PHOGAT CONT
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .