Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹4.0 L+₹379 (0.10%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹3.8 L
EMD Value
₹7,600
Closing Date
23 Aug 2026, 6:00 pmClosed
Executive Engineer
HP PWD Division
RR Damages
2026_PWD_141381_4
10974-76
Open Tender
Civil Works - Roads
Percentage
30 days
Patti Rissa
Please refer Tender documents.
9 documents required · 9 mandatory
₹350
₹7,600
29 Sept 2026
17 Aug 2026
24 Aug 2026
17 Aug 2026
23 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in soil hilly area by manual means including cutting and trimming of side slopes and disposing of excavated earth wintin all leads lifts as per drawing and technical specification clause 160.3.1 including entire carriage of material and direction of Engineer-in-Charge. | 48.28 | Per cubic metre | 150 | ₹7,242 |
| 2 | Earth work in excavation in all kind of soil in foundation of structures upto all depth/height as per drawing and technical specification clause 305.1 including setting out construction of shoring and bracing removal of stumps and other deleterious matter dressing of sides and bottom and back filling with approved material and disposal of all surplus excavated earth in specified site and direction of Engineer-in-Charge complete. | 21.3 | Per cubic metre | 200 | ₹4,260 |
| 3 | Ramdon rubble masonry/polygonal rubble masonry (un-coursed/brought to courses) with hard stone of approved quality in foundation and plinth including levelling up with cement concrete 1:6:123 (One cement six sand twelve graded crushed stone aggregate 40 mm (Forty milimetre) nominal size at plinth level in cement mortar 1:6 (one cement six sand) and curing complete carriage of materials within all leads and lifts and other incidentials charges. | 36.96 | Per cubic metre | 6,200 | ₹2,29,152 |
| 4 | Construction of dry rubble masonry for retaining walls, breast walls revetment walls and parapets etc. for substructure and supper structure complete as per drawing and technical specification clause 704.6 and 1604 and hauling of materials in all leads and lifts as per the satisfaction and direction of Engineer-in-Charge. | 39.56 | Per cubic metre | 3,500 | ₹1,38,460 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
Tendernotice_2.pdf
PDF • 0.42 MB
SBD.pdf
Tender Documents • 6.12 MB
BOQ_209866.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .