Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC NONE | ₹5.0 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical BARIHAT BAZAR DIST SAHIGANJ | BARIHAT BAZAR | SAHIGANJ | - | - | Rejected-Technical ALL DOCUMENT NOT SUBMIT |
| 3 | Rejected-Technical | - | - | Rejected-Technical ALL DOCUMENT NOT SUBMIT |
Tender Value
₹5.5 L
EMD Value
₹11,000
Closing Date
13 Mar 2026, 5:00 pmClosed
OFFICE OF THE EE NREP SAHIBGANJ
OFFICE OF THE EE NREP SAHIBGANJ
construction of Sidhi Ghat at Bada Pokhar near Kabristan at vill- Palashbona in GP- Palashbona in Barharwa block Dist- Sahibagnj
2026_NREPS_110798_1
NREP/SBG/28/2025-26/16
Open Tender
Civil Works - Others
90 days
BARHARWA
AS PER F2
4 documents required · 4 mandatory
₹2,500
₹11,000
4 Jun 2026
5 Mar 2026
16 Mar 2026
5 Mar 2026
13 Mar 2026
5 Mar 2026
5 Mar 2026 - 13 Mar 2026
Labour for site clearance
E/W in excavation in foundation trenches in ordinary soil(vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50m including all lifts,levelling,ramming,the foundation trenches,removing roots of trees and extra for earthwaork in hard soil(vide classification of soil item B)...do.....do.....E/I
Providing coarse clean sand filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick all….do….do…E/
Construction of granular sub base by providing close graded material
Providing designation 75A one brick flat soling and joint filled with local sand including cost of watering taxes royalty all…do…do…E/I
Providing P.C.C. M-150 with nominal mix of (1:2:4) in foundation and plinth with approved quality of stonechips 20mm to 6mm size graded and clean coarse sand of FM 2.5 to 3 all…do…do…E/I
Providing and laying in position C.C. of grade M-200 with nominal mix of (1:1.5:3) in foundation all….do…do…E/I
Providing and laying in position C.C. of grade M-200 with nominal mix of (1:1.5:3) in foundation all….do…do…E/I
Providingrandamrubblestonemasonryin CM (1:4) in foundation and plinthwith hammerdressedstoneof lessthan0.03 M3 involumeandcleancoarsesandof F.M.2to2.5 includingcostofscreening rakingout jointsto20mmdepth,curing taxes and royalty all complete as per building specification and direction of E/I.
Providingrandamrubblestonemasonryin CM(1:4) insuperstructureincludingcost of screening of materials scaffolding rakingout jointsto20mmdepth,curing taxes and royalty all complete as per building specification and direction of E/I
Providing designation 75A brick work in C.M (1: 6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar, joints cost of screening materials raking out joints to 15mm depth , curring , taxes and royalty all complete as per builiding specification and direction of E/I.
Providing designation 75 b brick work in C.M. (1: 4) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including, providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth curing, taxes and royalty all complete as per building specification and direction of E/I.
Providing 12mm. cement plaster (1:4) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I.
Providing 1.5mm. cement punning including curing, carriage of water withall leads and lifts as per building specification and direction of E/Л.
Earth filling in foundaion trenches and plinthinlayersnotexceding150mmthick wellwatered, rammed, fullycompacted and fine dressed with earth obtained fromexcavationof foundation trenches withinaleadof50Mandliftof1.5Mall complete as per building specification and direction of E/I. (mode of measurement compacted volume)
Providing two coats of snowcem of approved shade and make over a coat of cement primer on new surface including preparing the plastered surface smooth with sand paper scaffolding , curing and taxes all complete as per building specification and direction of E/I
Add carraige cost of materials i) Sand
chips lead 12 km
Bricks lead 11 km
steel + cement 5 km
Centering and shuttering including strutting, propping etc. and removal of form for tie beam
Add 18 % GST
add 1 % labour cess
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_149763.xls
BOQ • 0.25 MB
SINGLEBIDDOCUMENT.pdf
Tender Documents • 1.32 MB
Download all tender documents and submit your bid