Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹2.5 L
Closing Date
25 May 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Track Renewal works (PH-31)
Provision of In-situ Glued joints under sanctioned Track Renewal works in CPA-MRT section.
NER-IZN-2026-76
NER-IZN-2026-76
Open
Works - General
12 Months
Gorakhpur, Uttar Pradesh
₹0
₹2.5 L
25 May 2026
30 Apr 2026
11 May 2026
1 item across 1 schedule · ₹1,26,55,484.58 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Fabrication, assembly IN-SITU G 3(L) type Glued insulated rail joints for broad gauge 60Kg Rail with all contractor's materials, to and from transportation of materials, octroi, any other applicable taxes etc. complete as per instructions contained in MANUAL GLUED INSULATED RAIL JOINTS (REVISED 2024) with up to date ACS if any. This Item inclusive of all fittings, consumables and accessories such as (a) Long fish plate, H.T.S Bolts and nuts, (c) Punch washers, (d) Insulated bushes, (e) Insulated channels, 6mm thick end post, (g) Glue (h) Hardener (i) Glass cloth carrier and all the other materials and fittings for cleaning, fabrication and assembling excluding rails, (j) other fitting and accessories required to fabricate In situ Glued Joint" in all respect per RDSO/Drawing. No. RDSO/T-2572 and specifications contained in MANUAL GLUED INSULATED RAIL JOINTS (REVISED 2024) with up to date ACS if any. Notes- Situ glued joints shall be checked before use as per provisions of MANUAL FOR GLUED INSULATED RAIL JOINTS (REVISED 2024) with up to date ACS if any. The manufacturer shall ensure that in-situ fabricated glued joints shall give a minimum 50% service life terms of GMT (warranty period) as stipulated in Para 6.8 of MANUAL FOR GLUED INSULATED RAIL JOINTS (REVISED 2024) with up to date ACS if any. Any component in-situ fabricated glued joints (except rails) failing or proving unsatisfactory during warranty period shall be completely replaced by the manufacturer. All associated expenses shall be borne by the manufacturer. Security money shall only be released after certification from site in charge regarding satisfactory behavior of all glued joints during the warranty period from the date of laying. | Each FOR (b) (f) Any as FOR In- in of the | 667.00 | 18,973.74 | 1,26,55,484.58 |
| Schedule total | ₹1,26,55,484.58 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ManualforGluedInsulatedRailJointRevised-2024.pdf
ATTACHMENT
PowerofAttorneyspecialcondition.pdf
ATTACHMENT
TrackConditionnew.pdf
ATTACHMENT
CablecuttingCondition.pdf
ATTACHMENT
GCC2022LatestcorrectionslipupdateduptoACS11.pdf
ATTACHMENT
Instructionstotendererwithspecialconditions.pdf
ATTACHMENT
2026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_11.pdf ACS 11 GCC 2022 upto date
ATTACHMENT
2026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_11.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .