Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.2 L+₹36,244.13 (12.7%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹3.2 L+₹36,285 (12.7%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹3.2 L+₹37,183.95 (13.0%)Admitted-Finance 139 BEHIND PANCHAYAT BHAWAN PAHAD GANJ FAIZABAD 224001 | FAIZABAD | AYODHYA | UTTAR PRADESH | 224001 | L4 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹40,900
Closing Date
22 Sept 2026, 2:00 pmClosed
CE
Nagar Nigam Ayodhya
Awaidhnath ward ke mohalla ranopali me mourya genral store se ranopali railway crossing tak hotmix patch marammat ka karya As per NIT 09
2026_DOLBU_1186187_9
703/Gaddhamukt/NNA/2026
Open Tender
Civil Works
Percentage
15 days
Ayodhya
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
MC
₹40,900
30 Sept 2026
16 Sept 2026
22 Sept 2026
16 Sept 2026
22 Sept 2026
16 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply & Laying GSB all complete work. | 30.48 | cum | 3,866 | ₹1,17,835.68 |
| 2 | Providing and applying tack coat with Bitumen (VG-10) using bitumen pressure distributor at the rate of 0.30kg per sqm (VG-10) on the prepared granular surfaces treated with primer & cleaned with hydraulic MORT&H clause503 | 318.05 | SQM | 16.36 | ₹5,203.3 |
| 3 | Dense Graded Bituminuos Macadam (DGBM) Providing and laying dense Graded bituminour macadam with 60-90 TPH batch type HMP producing an average output of 75 tonnes per hour crushed aggregates of speficied grading permixed with bituminour binder @ 4.5 per cent by weght of total mix and filler transporting the hot mix to work site laying with hydrostatic paver finisher with sensor control to the required grade level and alignment rolling with smooth wheeled vibratory and tandem rollers oto achieve the desired compaction as per MORTH specification clause No 505 complete in all respects. | 12.68 | cum | 10,556.7 | ₹1,33,858.96 |
| 4 | P/L of bituminous Concrete (BC) with computrised HMP type hot mix plant producing an average output of 75 tonnes per hour crushed aggregates of specified grading premixed with bituminour binder (CRMB-55) @5.4 per cent of mix and filler trasporting the hot mix to work site laying with smooth wheeled vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in respects. | 12.68 | cum | 11,965.05 | ₹1,51,716.83 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
BOQ_2232753.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .