Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC SIDDHESHWAR INFRASTRUCTURE DHARASHIV PROP SIDDHESHWAR INFRASTRUCTURE DHARASHIV DHARASHIV | DHARASHIV | DHARASHIV | MAHARASHTRA | ₹8.4 L | L1 | Accepted-AOC AOC |
| 2 | L2₹8.6 LRejected-AOC | ₹8.6 L | L2 | Rejected-AOC AOC |
| 3 | L3₹8.7 LRejected-AOC | ₹8.7 L | L3 | Rejected-AOC AOC |
Tender Value
₹8.4 L
EMD Value
₹8,424
Closing Date
2 Mar 2026, 6:00 pmClosed
GRAMPANCHAYAT ADHIKARI AND SARPANCH GP OFFICE JUNO
GP OFFICE JUNONI TQ AND DIST DHARASHIV
Construction of Cement Road from Junoni Road to Residential School for Deaf and Mute at Junoni Taluka and District Dharashiv
2026_OSMAN_1280956_1
E-TENDERNOTICE23022026-2
Open Tender
Electrical Works
90 days
GP OFFICE JUNONI TQ AND DIST DHARASHIV
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹8,424
17 Mar 2026
23 Feb 2026
3 Mar 2026
23 Feb 2026
2 Mar 2026
25 Feb 2026
Item No.1:- Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking Boulders (Hand broken). Additional Spec. No.As directed by Engineer-in-charge (SSR 22-23 It.No.50.56 )
Item No.2: Supplying hard murum / kankar at the road site, including conveying and stacking complete (SSR 22-23 It.No.2.29 )
Item No.3:-Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge . Additional Spec No.As directed by Engineer-in-charge (SSR 22-23 It.No.50.58)
Item No.4:-Spreading hard murum/ soft murrum/ gravel or kankar for side width complete (SSR 22-23 It.No.2.30 )
Item No.5:-Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc. complete. (SSR 22-23 It.No.2.31 )
Item No.6:- Compacting the sub grade/gravel/ oversize metal (200 mm loose) layers for all width with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. Additional Spec.No.As directed by Engineer-in-charge (sSR 22-23 It.No.50.59)
Item No.7:-Providing & laying in situ cement concrete of M 10 proportion with trap/ granite/ quartzite/ gneiss metal in foundation including necessary form work compacting and curing etc. complete. with reversible Drum Type mixer with SCADA. With crushed sand . (SSR 22-23 It.No.11.03 )
Item No.8:-Providing and laying in situ / ready mix M20 CC of trap/ granite/ quartzite/ gneiss metal for wearing course 8cm thick including compacting, finishing, curing and filling in joints with bitumen etc. complete. (with fully automatic micro processor based PLC with SCADA enabled concrete batch mix plant / pan mixer with fine agreegates of required specifications ( VSI sand finely washed etc ) Additional Spec. No.BR.47(a) Page Number 140 and B. 7, Page Number38 (SSR 22-23 It.No.14.39)
Item No.9:-Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means Additional Spec. No.Bd.A.1 Page One Number 259 (SSR 22-23 It.No.21.02 )
Item No.10:-Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 450mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete. Additional Spec. No.CD.7 Page.No. 162 (SSR 22-23 It.No.11.08 )
Item No.12: Charges for testing of material in vigilance and quality control laboratory for concrete compressive strength of C.C. Cube ( Set of 3 cubes) Rate as per SSR 2022-23 Sr.No.19 Page No.3
Item No.13: Charges for testing of material in vigilance and quality control laboratory for Metal (Sieve Analysis) Rate as per SSR 22-23 Sr.No.3 Page No.2
Item No.14:- Royalty charges b) For all other Minerals= Royalty + surcharge (2%)= 211.95 + 4.23 = 216.18 per cum. As per SSR 22-23 Section V Page No.3
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_2203527.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid