| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Finance GILANPARA DUMKA | DUMKA | JHARKHAND | 814101 | ₹2.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.1 Cr+₹4.3 L (2.03%)Admitted-Finance DHUDHANI DUMKA | DUMKA | JHARKHAND | 814101 | ₹2.1 Cr+₹4.3 L (2.03%) | L2 | Admitted-Finance |
| 3 | L3₹2.3 Cr+₹16.0 L (7.63%)Admitted-Finance JHARKHAND | DHANBAD | JHARKHAND | 818142 | ₹2.3 Cr+₹16.0 L (7.63%) | L3 | Admitted-Finance |
| 4 | L4₹2.7 Cr+₹59.2 L (28.2%)Admitted-Finance 202 TIWARI CHOWK DEOGHAR COLLEGE ROAD NILKATH VIHAR SAWERA GALI DEOGHAR | DEOGHAR | JHARKHAND | 814112 | ₹2.7 Cr+₹59.2 L (28.2%) | L4 | Admitted-Finance |
| 5 | L5₹2.7 Cr+₹61.2 L (29.2%)Admitted-Finance | ₹2.7 Cr+₹61.2 L (29.2%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S Devnandan Prasad Sah L2 | M/s CHITRA CONSTRUCTION L1 | SUJATA UDIT BUILDERS PVT LTD L4 | M/S SATYA CONSTRUCTION L3 | SANDIPAN PRAMANIK INFRA PRIVATE LIMITED L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Cutting of trees, excluding removal of stumps and roots of trees
Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres.
300mm to 600m m
RCD SOR 2.01 (i) | 3 | Each | 275.49 ₹826.47 | 349.7 ₹1,049.1 | 346 ₹1,038 | 282.31 ₹846.93 | 249.72 ₹749.16 Lowest |
| 2.00 | Cutting of trees, excluding removal of stumps and roots of trees
Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres.
600mm to 900m m
RCD SOR 2.01 (ii) | 2 | Each | 445.74 ₹891.48 | 565.8 ₹1,131.6 | 560 ₹1,120 | 456.77 ₹913.54 | 365.8 ₹731.6 Lowest |
| 3.00 | Cutting of trees, excluding removal of stumps and roots of trees
Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres.
900mm to 1800m m
RCD SOR 2.01 (iii) | 2 | Each | 791.66 ₹1,583.32 | 1,004.9 ₹2,009.8 | 994 ₹1,988 | 811.26 ₹1,622.52 | 504.9 ₹1,009.8 Lowest |
| 4.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness.
By Mechanical Means using Motor grader
In area of light jungle
RCD SOR 2.03(iii) A | 0.5 | Hect | 1,00,809.8 ₹50,404.9 | 55,000 ₹27,500 Lowest | 1,26,684 ₹63,342 | 1,03,305.1 ₹51,652.55 | 1,27,964.7 ₹63,982.35 |
| 5.00 | Excavation in Soil using Hydraulic Excavator and Tippers with Disposal upto 1000 metres.
Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m
(i) Ordinary Soil
RCD SOR 3.06 | 2,910.97 | Cum | 49.16 ₹1,43,103.29 Lowest | 50 ₹1,45,548.5 | 62 ₹1,80,480.14 | 50.38 ₹1,46,654.67 | 60.45 ₹1,75,968.14 |
| 6.00 | Construction of Embankment with Material obtained from Borrow pits.
Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.
RCD SOR 3.16 | 4,828.93 | Cum | 102.34 ₹4,94,192.7 | 100 ₹4,82,893 Lowest | 129 ₹6,22,931.97 | 130 ₹6,27,760.9 | 125.9 ₹6,07,962.29 |
| 7.00 | Construction of Embankment with Material Deposited from Roadway Cutting.
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2.
Rate per cum after adding royalty@Rs 27.48/cum
Rolling with vibratory Roller
RCD SOR 3.17 | 2,328.77 | Cum | 48.43 ₹1,12,782.33 Lowest | 61.48 ₹1,43,172.78 | 61 ₹1,42,054.97 | 50 ₹1,16,438.5 | 61.48 ₹1,43,172.78 |
| 8.00 | Construction of Subgrade and Earthen
Shoulders
Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.
RCD SOR 3.18 | 3,659.64 | Cum | 103.44 ₹3,78,553.16 Lowest | 131.3 ₹4,80,510.73 | 129 ₹4,72,093.56 | 126 ₹4,61,114.64 | 131.3 ₹4,80,510.73 |
| 9.00 | Providing and laying pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications.
Stone/Boulder
RCD SOR 16.04 A | 139.44 | Cum | 1,922.17 ₹2,68,027.38 | 1,500 ₹2,09,160 Lowest | 2,415 ₹3,36,747.6 | 1,969.75 ₹2,74,661.94 | 2,439.92 ₹3,40,222.44 |
| 10.00 | Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification
RCD SOR 16.05 | 69.72 | Cum | 2,497.94 ₹1,74,156.38 | 1,000 ₹69,720 Lowest | 3,139 ₹2,18,851.08 | 2,559.77 ₹1,78,467.16 | 3,170.78 ₹2,21,066.78 |
Tender Value
₹2.7 Cr
EMD Value
₹2.7 L
Closing Date
2 Nov 2022, 12:00 pmClosed
EXECUTIVE ENGINEER RCD ROAD DIVISION DUMKA
EXECUTIVE ENGINEER RCD ROAD DIVISION DUMKA
Construction of Approach road of Newly constructed High Level Bridge (45/1) over local river at 45th km of Ranibahal-Maheshkala Road (MDR-197) for the year 2022-23
2022_CECOM_62382_1
RCD/DUMKA/1990
Open Tender
Civil Works
Item Rate
183 days
DUMKA
AS PER SBD
3 documents required · 3 mandatory
₹10,000
EXECUTIVE ENGINEER RCD ROAD DIVISION DUMKA
₹2.7 L
7 Dec 2022
21 Oct 2022
4 Nov 2022
21 Oct 2022
2 Nov 2022
21 Oct 2022
Amount
Cutting of trees, excluding removal of stumps and roots of trees Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres. 300mm to 600m m RCD SOR 2.01 (i)
Cutting of trees, excluding removal of stumps and roots of trees Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres. 600mm to 900m m RCD SOR 2.01 (ii)
Cutting of trees, excluding removal of stumps and roots of trees Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres. 900mm to 1800m m RCD SOR 2.01 (iii)
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. By Mechanical Means using Motor grader In area of light jungle RCD SOR 2.03(iii) A
Excavation in Soil using Hydraulic Excavator and Tippers with Disposal upto 1000 metres. Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m (i) Ordinary Soil RCD SOR 3.06
Construction of Embankment with Material obtained from Borrow pits. Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. RCD SOR 3.16
Construction of Embankment with Material Deposited from Roadway Cutting. Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2. Rate per cum after adding royalty@Rs 27.48/cum Rolling with vibratory Roller RCD SOR 3.17
Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. RCD SOR 3.18
Providing and laying pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Stone/Boulder RCD SOR 16.04 A
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification RCD SOR 16.05
Granular Sub-Base with Graded Material (Table:- 400-1) By Mix in Place Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. Rate per cum for grading-V Material GSB Gr-V RCD SOR 4.01 B(V)
Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. RCD SOR 4.14 B
Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. RCD SOR 5.01 A(i)
Tack Coat on Bituminous surfaces Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. RCD SOR 5.02 (i)
Tack Coat on Granular surfaces treated with primer Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. RCD SOR 5.02 (ii)
Dense graded Bituminous Macadam Grading-II with VG-30 Grade Packed Bitumen Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @4.5 percent by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 505 complete in all respects. RCD SOR 5.04 B
Bituminous concrete Grading- II with VG-30 Grade Packed Bitumen Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment , rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 507 complete in all respects. RCD SOR 5.05 B
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.) RCD SOR 8.13
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of class-B Type IV retro reflective sheeting fixed cover 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick aluminium composite material sheet depending on the size of the sign fixed over back support frame of min 25 x 25 x 3 mm Angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing. The sign shall be maintained as per section 12 of IRC 67. 80 cmx60cm Rectangular RCD SOR 8.4 A (x)
Direction and Place Identification Signs with size more than 0.9 sqm size Board.(Providing and erecting direction and place identification retro- reflectorised sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4 mm with area exceeding 0.9 sqm fixed over back support frame of min 40 x 40 x 5 mm Angle mounted on two nos. of mild steel circular pipe 65 NB, 3.2mm thickness and 4.5m meter total height firmly fixed to the ground by means of properly designed foundation with M 25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing) RCD SOR 8.06
Road Delineators (Supplying and installation of delineators (Road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79 and the drawings.) RCD SOR 8.15
Metal Beam Crash Barrier Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811) RCD SOR 8.23 A
Excavation for strucutres Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Mechanical Means Depth upto 3 m RCD SOR 12.01 B (i)
Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications. PCC Grade M15 PCC Grade M15 using batching plant & Concrete pump RCD SOR 12.08 A Case I
Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and technical specifications. Random Rubble masonry (coursed/uncoursed) RCD SOR 12.07 (B)
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications Random Rubble Masonry (Coursed/uncoursed) RCD SOR 13.04 A
Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications PCC Grade M15 Height upto 5m PCC Grade M15 using batching plant & concrete pump RCD SOR 13.05 A(p)
Providing and laying of filter media with granular materials/stones crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment , wing wall and return wall to the full height compacted to a firm condition complete as per drwaing and technical specification. RCD SOR 13.10
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification PCC Grade M15 using batching plant & Concrete pump RCD SOR 14.10 Case I
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification. RCC M30 RCD SOR 14.11
Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation. RCD SOR 14.21
Add 18 % GST (in Basic Rate must fill 18)
Add 1% Labour Cess (in Basic Rate must fill 1)
M/S Devnandan Prasad Sah
M/S SATYA CONSTRUCTION
SUJATA UDIT BUILDERS PVT LTD
SANDIPAN PRAMANIK INFRA PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_83981.xls
BOQ • 0.27 MB
SBD.pdf
Tender Documents • 1.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .