| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 LAccepted-AOC | ₹14.2 L | L1 | Accepted-AOC Due to lower rates |
| 2 | L2₹15.6 L+₹1.4 L (10.1%)Rejected-AOC | ₹15.6 L+₹1.4 L (10.1%) | L2 | Rejected-AOC Due to higher rates |
| 3 | L3₹16.9 L+₹2.7 L (19.1%)Rejected-Finance | ₹16.9 L+₹2.7 L (19.1%) | L3 | Rejected-Finance Due to higher rates |
| 4 | L4₹29.0 L+₹14.8 L (104.6%)Rejected-Finance | ₹29.0 L+₹14.8 L (104.6%) | L4 | Rejected-Finance Due to higher rates |
Tender Value
₹17.1 L
EMD Value
₹34,000
Closing Date
21 Jan 2023, 9:00 amClosed
SHAMSHER SINGH
PD Nuh
Rough cost estimate for Construction of Side Drain on G.A. road to Malab to Birsika at village Dihana from RD 1400 to 1650M (Both Side) in Nuh Distt. (Road 1043)
2023_HRY_252267_1
20232CDDB663 3829 4613 BB7F 2F0965DEF46F626BAR
Open Tender
Civil Works
Works
90 days
DIHANA
As per bid document
3 documents required · 3 mandatory
₹1,000
Yes
₹34,000
Yes
Nuh
19 Jun 2023
3 Jan 2023
21 Jan 2023
3 Jan 2023
21 Jan 2023
3 Jan 2023
9 Jan 2023
Amount
[11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand)
[4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil.
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
[6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
[6.16]Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).
[6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform
[6.34.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level. 3. Cold twisted bars
[7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand)
Saddam Hussain
THE NEW MEWAT COOP L AND C SOCIETY LTD
Indo Pollutech Systems
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .