Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.9 LAccepted-AOC 62 PINK ROSE COLONY KAIMARI ROAD 125001 | HISAR | HARYANA | 125001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹44.8 L+₹5.9 L (15.2%)Rejected-Finance H NO 861 12 SALARA MOHALLA ROHTAK 124001 HARYANA INDIA | ROHTAK | HARYANA | 124001 | L2 | Rejected-Finance L2 |
Tender Value
₹37.8 L
EMD Value
₹75,510
Closing Date
7 Apr 2021, 5:00 pmClosed
Executive Engineer Elect. Division PWD B and R
Executive Engineer Elect. Division PWD B and R
CONSTRUCTION OF NEW PWD REST HOUSE BUILDING AT SIRSA (PDG. SHIFTING OF EXISTING HT/ LT LINES ONLY).
2021_HRY_165549_1
WD/Elect-GGN/Elect-HSR/100138
Open Tender
Electrical Works
Works
120 days
Hisar
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹75,510
13 Jul 2021
24 Mar 2021
8 Apr 2021
24 Mar 2021
7 Apr 2021
24 Mar 2021
Amount
A New Materials: Supply of pcc pole 11 mtr. as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of ASCR 80 mm2 as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of 11 KV pin Insulator Polymeric as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of 11 KV GO Switch for 11 M Long as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of Stay Set complete as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of Stay Wire 7/8 SWG as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of GSL for Earth as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of 11 KV Disc Insulator Polymeric as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of 11 KV Disc Insulator for Stay as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of 11 KV HT XLPE 3 core 185 mm2 as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of 11 KV HT XLPE 3 core 185 mm2 Cable Box outdoor as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of HDPE 200 mm (PE-63) PN 6 as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of Glavinized Channel (X arm) 100 x 50 x 6 2200 mm for H Pole WT. 21.032 Kg as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of Glavinized Channel 75 x 40 x 6 2200 mm for Fuse Unit & HT T-Off Wt. 15.708 Kg. as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of Glavinized Channel 100 x 50 x 6 1600 mm for cable support Wt. 15.296 Kg. as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of Glavinized angel Iron 50 x 50 x 6 2200 mm for cable support Wt. 9.90 Kg. complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of Glavinized angel Iron 50 x 50 x 6 2400 mm for Earth Wire Wt. 10.80 Kg. in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of Glavinized angel Iron 50 x 50 x 6 2200 mm for belting of H- pole) Wt. 9.90 Kg. as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of Glavinized angel Iron 50 x 50 x 6 2860 mm for bracing of H- pole) Wt. 12.87 Kg. as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of Glavinized angel Iron 50 x 50 x 6 2860 mm (for LT contilever) Wt. 12.37 Kg. as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of G.I. pipe for Earthing 40 mm dia 6 Mtrs long as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of G.I. Strip for Earthing 25 x 6 mm dia 9 M long 10.8 Kg. as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of Charcoal as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of Salt cable Complete as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of Lighitng Arroster 9 KA as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of T/F Plaform set complete as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of LT Fuse board as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of SC PVC cable 185 mm2 Complete as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of Aluminium Thimble as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of PG Clamp 80/100 mm2 as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of PVC Tape Roll as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of Empire Tap Roll as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of 3.5/C LT XLPE Cable 95 mm2 as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of LT Insulator as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of S/C 50 2 as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of GI Half Clamp Wt. 1.47 Kg as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of Full Half Clamp Wt. 2.325 Kg as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of Wooden Clint for Cable Support as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of GI Nut Bolts off Size as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of Danger Plate as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A New Materials: Supply of Sundry to complete the job
B: Errection of materials as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work. E/O of PCC 11 M long
B: E/O H Pole with Stay
B: E/O of Pole mounting substation 100 KVA T/F
B: E/O GO Swithc for 11 M pole
B: E/O of HT XLPE Cable 185 mm 2
B: E/O of HT XLPE Cable box 185 mm 2
B: E/O of GI Channel 75 x 40 cable pipe support 2200 mm
B: E/O of GI Channel 100 x 50 cable support 1600 mm
B: E/O of GI Angel 50 x 50 x 6 for cable support 2200 mm
B: E/O of GI Angel 50 x 50 x 6 for for belting of H pole 2200 mm
B: E/O of GI Angel 50 x 50 x 6 for for bracing of H pole 2860 mm
B: E/O of ACSR 80 mm2 Jummpers
B: E/O of GI Strip for Earthing
B: E/O of boaring for Earthing 28 No.
B: E/O of GSL wire 20 KG
B: E/O of LT XLPE Cable 3.5/C 95 mm2
B: E/O of S/C PVC 50 mm 2
B: E/O of Lighting Arrestor 9 KA
B: E/O of LT T-off for LT Line
B: E/O of Trenchless laying of HDPE pipe including digging laying of cable & Refilling of pits
C: Dismentalling of materials as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work. Dismentalment of PCC pole U/S
C: Dismentalment of Pole mounting substation 100 KVA
C: Dismentalment of ACSR 50 mm2
C: Dismentalment of ACSR 30 mm2
C: Dismentalment of GSL 8 SWG Scrap
Vijender Kumar Contractor
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .