| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 CrAccepted-AOC 2974 URBAN ESTATE JIND 126102 | JIND | JIND | HARYANA | 126102 | ₹2.5 Cr | 1 | Accepted-AOC Due to lower rate |
| 2 | 2₹2.5 Cr+₹1,676.15 (<0.01%)Rejected-AOC HSVP PANCHKULA | PANCHKULA | HARYANA | 133301 | ₹2.5 Cr+₹1,676.15 (<0.01%) | 2 | Rejected-AOC Due to higher rate |
Tender Value
₹2.3 Cr
EMD Value
₹4.6 L
Closing Date
29 Oct 2024, 3:00 pmClosed
EXECUTIVE ENGINEER
Narwana PHED
Estimate for Improvement of infrastructures and providing Raw Water lifting system and construction of boosting station for village sandil distt. jind.
2024_HRY_405864_1
202432C3DAC7 D8F5 4F9D B534 77AD675CAEC1570PUH
Open Tender
Civil Works
Works
425 days
NARWANA
4 documents required · 4 mandatory
₹15,000
₹4.6 L
Yes
8 Jan 2025
22 Oct 2024
29 Oct 2024
22 Oct 2024
29 Oct 2024
22 Oct 2024
Amount
Recovery rate of old dismentaled bricks bats.....
Supply, erection, testing of reputed make LED light 150 watts with fitting, wiring and accessories complete in respects.
Supplying, erection, testing and commissioning of horizontal motor pumping set for Raw water having head 25.00 m as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked. Discharge Capacity ( LPM) 2000 Power capacity ( BHP) 25
Recovery rate of old dismantled bricks size.....
Design construction, testing and commissioning of 0.50 MLD capacity Water Treatment Plant including inlet channel, Alum dozing Flash mixing, Clarifloculator, filter box, over head Reservoir for back wash, waste water tank including all civil work, Pumping machineries and electric cabling. Control panels entire piping network of suitable size, laying the DI pipe from raw water pump to inlet box of WTP, WTP to CWT. and Suction Well for CW including DI specials, suitable size Sluice valves, Hodies, manhole covers, air scour equipment, chemical house include chlorination equipment and arrangement of flow measurement and sand bed complete in all respects as per NIT (BASED ON SCADA SYSTEM- 0.50 MLD)
Operation and Maintenance of Raw water lifting system, rising main from water works to lifting system and 0.50 MLD capacity water treatment plant at water works as per schedule-IV for a period of 5 year after 12 month defect liability period after three months of trial run. (will be charged to the A/Mtc. Estimate) complete in all respects as per approved NIT. 1)Operation and maintenance during defect liability period after 3 month trial run period ( operation only)
Operation and Maintenance of Raw water lifting system, rising main from water works to lifting system and 0.50 MLD capacity water treatment plant at water works as per schedule-IV for a period of 5 year after 12 month defect liability period after three months of trial run. (will be charged to the A/Mtc. Estimate) complete in all respects as per approved NIT. 1)Operation and maintenance 1st year Operation and maintenance after defect liability period
Operation and Maintenance of Raw water lifting system, rising main from water works to lifting system and 0.50 MLD capacity water treatment plant at water works as per schedule-IV for a period of 5 year after 12 month defect liability period after three months of trial run. (will be charged to the A/Mtc. Estimate) complete in all respects as per approved NIT. 1) 2nd year Operation and maintenance
Operation and Maintenance of Raw water lifting system, rising main from water works to lifting system and 0.50 MLD capacity water treatment plant at water works as per schedule-IV for a period of 5 year after 12 month defect liability period after three months of trial run. (will be charged to the A/Mtc. Estimate) complete in all respects as per approved NIT. 1)3rd year Operation and maintenance
Operation and Maintenance of Raw water lifting system, rising main from water works to lifting system and 0.50 MLD capacity water treatment plant at water works as per schedule-IV for a period of 5 year after 12 month defect liability period after three months of trial run. (will be charged to the A/Mtc. Estimate) complete in all respects as per approved NIT. 1) 4th year Operation and maintenance
Operation and Maintenance of Raw water lifting system, rising main from water works to lifting system and 0.50 MLD capacity water treatment plant at water works as per schedule-IV for a period of 5 year after 12 month defect liability period after three months of trial run. (will be charged to the A/Mtc. Estimate) complete in all respects as per approved NIT. 1) 5th year Operation and maintenance
Bidder Name
Amount
Himmat Singh Contractor (GSTN-NA) BID ID -1159678
PARAMJEET CONTRACTOR (GSTN-NA) BID ID -1159703
PARAMJEET CONTRACTOR (BID ID -1159703)
Himmat Singh Contractor (BID ID -1159678)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .