Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.4 LAdmitted-Finance | ₹44.4 L | L1 | Admitted-Finance |
| 2 | L2₹46.3 L+₹1.9 L (4.21%)Admitted-Finance AT ROAD MES TINALI PO CHABUA DISTT DIBRUGARH ASSAM 84 | CHABUA | DIBRUGARH | ASSAM | 786102 | ₹46.3 L+₹1.9 L (4.21%) | L2 | Admitted-Finance |
| 3 | L3₹46.5 L+₹2.1 L (4.72%)Admitted-Finance | ₹46.5 L+₹2.1 L (4.72%) | L3 | Admitted-Finance |
| 4 | L4₹47.3 L+₹2.9 L (6.42%)Admitted-Finance GANGA NAGAR NEAR TUSHARCHAKRA MISAMARI 784506 | SONITPUR | ASSAM | 784506 | ₹47.3 L+₹2.9 L (6.42%) | L4 | Admitted-Finance |
| 5 | L5₹47.3 L+₹2.9 L (6.63%)Admitted-Finance BAID COMPLEX R K CHOUDHURY ROAD KUMAR PARA GUWAHATI 781001 ASSAM | GUWAHATI | KAMRUP METRO | ASSAM | 781001 | ₹47.3 L+₹2.9 L (6.63%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S R G Construction L2 | M/S P R SINGH AND SONS L3 | M/S K.K.TRADERS L4 | M/S B.H. ENTERPRISE L6 | M/S. SUBHAS CONSTRUCTION CO. L7 | M/s Dhruv Enterprises L1 | R K ENGINEERING ASSEMBLE L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of brick work built in cement mortar complete all as specified and as directed. | 23.74 | Cum | 1,248 ₹29,627.52 | 1,254 ₹29,769.96 | 1,290 ₹30,624.6 | 1,295 ₹30,743.3 | 1,900 ₹45,106 | 1,200 ₹28,488 Lowest | 1,278 ₹30,339.72 |
| 2.00 | Dismantling old broken floor hearth or wall tiling including cement mortar bedding (but not backing) and rubbish off the premices complete all as specified and directed. | 391.79 | Sqm | 83 ₹32,518.57 | 84 ₹32,910.36 | 86 ₹33,693.94 | 90.5 ₹35,457 | 100 ₹39,179 | 80 ₹31,343.2 Lowest | 85 ₹33,302.15 |
| 3.00 | Surface excavation n.exc (not exceeding) 30 cm deep and averaging 15cm deep and getting out in soft/loose soil complete all as specified and directed | 84.31 | Sqm | 52 ₹4,384.12 | 52 ₹4,384.12 | 54 ₹4,552.74 | 55.5 ₹4,679.21 | 50 ₹4,215.5 Lowest | 50 ₹4,215.5 Lowest | 53 ₹4,468.43 |
| 4.00 | Excavating in trenches in soft/loose soil, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out complete all as specified and as directed. | 42.2 | Cum | 291 ₹12,280.2 | 293 ₹12,364.6 | 301 ₹12,702.2 | 300 ₹12,660 | 420 ₹17,724 | 280 ₹11,816 Lowest | 298 ₹12,575.6 |
| 5.00 | Treating the backfill in contact with foundation at the rate of 7.5 litres of emulsion per square metre of vertical surface (Area of the sub structure in contact with backfill to be measured) complete all as specified and as directed. | 18.86 | Sqm | 187 ₹3,526.82 | 188 ₹3,545.68 | 194 ₹3,658.84 | 198 ₹3,734.28 | 200 ₹3,772 | 180 ₹3,394.8 Lowest | 192 ₹3,621.12 |
| 6.00 | Treating the top surface of filled earth at the rate of 5 litres of emulsion per square metre of surface complete all as specified and as directed. | 42.55 | Sqm | 94 ₹3,999.7 | 94 ₹3,999.7 | 197 ₹8,382.35 | 198 ₹8,424.9 | 200 ₹8,510 | 90 ₹3,829.5 Lowest | 96 ₹4,084.8 |
| 7.00 | Treating the soil under plinth protection at the rate of 5 litres of emulsion per square metre of surface area complete all as specified and as directed. | 32.58 | Sqm | 94 ₹3,062.52 | 94 ₹3,062.52 | 97 ₹3,160.26 | 100 ₹3,258 | 200 ₹6,516 | 90 ₹2,932.2 Lowest | 96 ₹3,127.68 |
| 8.00 | Treating the soil along with external perimeter of building at the rate of 2.25 litre of emulsion per metre of the perimeter wall complete all as specified and as directed. | 32.6 | RM | 47 ₹1,532.2 | 47 ₹1,532.2 | 48 ₹1,564.8 | 49 ₹1,597.4 | 200 ₹6,520 | 45 ₹1,467 Lowest | 48 ₹1,564.8 |
| 9.00 | M&L PCC 1:4:8 type D2 (40mm graded aggregate) as in foundation, filling & mass concrete complete all as specified and directed.. | 4.09 | Cum | 7,800 ₹31,902 | 7,838 ₹32,057.42 | 8,063 ₹32,977.67 | 8,080 ₹33,047.2 | 7,000 ₹28,630 Lowest | 7,500 ₹30,675 | 7,988 ₹32,670.92 |
| 10.00 | Returning filling in including spreading levelling watering and well ramming in layers n.exc 25cm deep as in soil complete all as specified and as directed. | 24.87 | CUM | 166 ₹4,128.42 | 167 ₹4,153.29 | 172 ₹4,277.64 | 174 ₹4,327.38 | 200 ₹4,974 | 160 ₹3,979.2 Lowest | 170 ₹4,227.9 |
Tender Value
Refer Docs
EMD Value
₹88,500
Closing Date
27 Jul 2026, 6:00 pmClosed
GE (P) AF Digaru
GE (P) AF Digaru PO Digaru Dist Kamrup Assam 782401
ADDN/ ALTRN TO SNCOs MESS AT AF STN DIGARU.
2026_MES_776879_1
C/8907/E8 of 2026-27
Open Tender
Miscellaneous Works
Item Rate
270 days
Digaru
Please ref Tender Documents
6 documents required · 6 mandatory
₹500
GE (P) AF Digaru
₹88,500
Yes
21 Aug 2026
7 Jul 2026
3 Aug 2026
7 Jul 2026
27 Jul 2026
22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of brick work built in cement mortar complete all as specified and as directed. | 23.74 | Cum | - | - |
| 2 | Dismantling old broken floor hearth or wall tiling including cement mortar bedding (but not backing) and rubbish off the premices complete all as specified and directed. | 391.79 | Sqm | - | - |
| 3 | Surface excavation n.exc (not exceeding) 30 cm deep and averaging 15cm deep and getting out in soft/loose soil complete all as specified and directed | 84.31 | Sqm | - | - |
| 4 | Excavating in trenches in soft/loose soil, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out complete all as specified and as directed. | 42.2 | Cum | - | - |
| 5 | Treating the backfill in contact with foundation at the rate of 7.5 litres of emulsion per square metre of vertical surface (Area of the sub structure in contact with backfill to be measured) complete all as specified and as directed. | 18.86 | Sqm | - | - |
| 6 | Treating the top surface of filled earth at the rate of 5 litres of emulsion per square metre of surface complete all as specified and as directed. | 42.55 | Sqm | - | - |
| 7 | Treating the soil under plinth protection at the rate of 5 litres of emulsion per square metre of surface area complete all as specified and as directed. | 32.58 | Sqm | - | - |
| 8 | Treating the soil along with external perimeter of building at the rate of 2.25 litre of emulsion per metre of the perimeter wall complete all as specified and as directed. | 32.6 | RM | - | - |
| 9 | M&L PCC 1:4:8 type D2 (40mm graded aggregate) as in foundation, filling & mass concrete complete all as specified and directed.. | 4.09 | Cum | - | - |
| 10 | Returning filling in including spreading levelling watering and well ramming in layers n.exc 25cm deep as in soil complete all as specified and as directed. | 24.87 | CUM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_870007.xls
BOQ • 0.64 MB
TENDER8907.pdf
Tender Documents • 1.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .